vii) As proposed, Industrial effluent will be treated in ETP. Treated effluent should bereused/recycled within the factory premises. Water quality of treated effluent shallmeet the norms prescribed by CPCB/SPCB.viii) As proposed Phenol should be extracted/treated from the effluent before sendingto the ETP.ix) The company should obtain Authorization for collection, storage and disposal ofhazardous waste under the Hazardous Waste (Management, Handling andTrans-Boundary Movement) Rules, 2008 and amended as on date formanagement of Hazardous wastes and prior permission from GPCB should beobtained for disposal of solid / hazardous waste in the TSDF. Measures shouldbe taken for firefighting facilities in case of emergency.x) Solvent management should be as follows :‣ Reactor should be connected to chilled brine condenser system‣ Reactor and solvent handling pump should have mechanical seals to preventleakages.‣ The condensers should be provided with sufficient Heat Transfer Area (HTA)and residence time so as to achieve more than 95% recovery‣ Solvents should be stored in a separate space specified with all safetymeasures.‣ Proper earthing should be provided in all the electrical equipments whereversolvent handling is done.‣ Entire plant where solvents are used should be flame proof. The solventstorage tanks should be provided with breather valve to prevent losses.xi) Green belt should be developed in 33% of the plant area.xii) Occupational health surveillance of the workers should be done on a regularbasis and records maintained as per the Factories Act.2.7.9. Manufacture of Laminate Sheet and Resin (Phenol Formaldehyde & MelamineFormaldehyde) at Survey No. 753, 754/2, Paiki, 8/A, National Highway, VillageLalpur, Taluka Morbi, District Rajkot, Gujarat by M/s Rainbow Laminate Pvt.Ltd.. (TOR to EC).The project authorities and their consultant (San Envirotech Pvt. Ltd.) gave adetailed presentation on the salient features of the project and proposed environmentalprotection measures to be undertaken as per Draft Terms of References (TORs)awarded during the 25 th Meeting of the Expert Appraisal Committee (Industry) heldduring 28 th –30 th July, 2011for preparation of EIA/EMP. All Synthetic Organic ChemicalsIndustry located outside the notified industrial area/estate are listed at S.N. 5(f) undercategory ‘A’ and appraised at Central level.M/s Rainbow Laminate Pvt. Ltd have proposed for manufacturing of LaminateSheet and Resin (Phenol Formaldehyde & Melamine Formaldehyde) at Survey No.753, 754/2, paiki, 8/A, National Highway, Village Lalpur, Taluka Morbi, District Rajkot,Gujarat. Total plot area is 16289 m 2 . Total cost of the expansion project is Rs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!