project is PM (1.775 ug/m 3 ), SO 2 (0.380 ug/m 3 ) and NOx (0.267 ug/m 3 ). Multi-Cycloneseparator along with stack (30 m) will be provided to control saw dust/lignite firedboiler/thermic fluid heater.Total ground water requirement from ground water source will increase from 11.5m 3 /day to 17 m 3 /day after proposed project. Industrial wastewater generation willincreasefrom 0.75 m 3 /day to 12.3 m 3 /day. Effluent will be treated in effluent treatmentplant followed by evaporator to achieve zero discharge. Domestic effluent will be treatedin septic tank followed by soak pit.Discarded drums and empty bags will be sent back to suppliers or sold to SPCBapproved vendors. Waste / used oil (0.5 KLPA) will be sold to authorized recyclers / reprocessors.ETP sludge will be sent to TSDF. Organic waste residue will be sent tocommon hazardous waste incineration facility. Green belt will be developed in 33 % ofplant area. Total power requirement is 350 KVA. Coal/lignite (20 TPD) will be used asfuel. DG set (500 KVA) will be installed.The Committee deliberated on the issues raised during the Public Hearing /Public Consultation meeting conducted by the Gujarat Pollution Control Board on 28 thApril, 2012. The issues raised during public hearing were regarding water requirement,wastewater generation, safety, show cause notice issued by the GPCB etc. and havesatisfactorily been responded by the project proponent and incorporated in the finalEIA/EMP report. The Committee noted that unit is engaged in the manufacturing oflaminated sheets in the existing unit and laminated sheets manufacturing is not coveredunder EIA Notification, 2006.After detailed deliberations, the Committee found the final EIA/EMP reportadequate and suggested to stipulate following specific conditions alongwith otherenvironmental conditions while considering for accord of environmental clearance:i) Ambient air quality data should be collected as per NAAQES standards notifiedby the Ministry on 16 th September, 2009.ii) Regular monitoring of Volatile Organic Compounds (VOCs) should be carriedout.iii) Bagfilter alongwith stack of adequate height should be provided to coal/lignitefired boiler/thermic fluid heater.iv) Fugitive emissions in the work zone environment, product, raw materials storagearea etc. should be regularly monitored. The emissions should conform to thelimits imposed by GPCB.v) Wet scrubber should be provided to control process emissions. Methanol shouldbe recovered from the process area.vi) Total fresh water requirement from ground water source should not exceed 17m 3 /day and prior permission should be obtained from the CGWA/SGWA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!