11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Discarded drums and empty bags will be sent back to suppliers or sold to SPCBapproved vendors. Waste / used oil (0.5 KLPA) will be sold to authorized recyclers / reprocessors.ETP sludge will sent to TSDF. Organic waste residue will be sent tocommon hazardous waste incineration facility.Green belt will be developed in 33 % of plant area. Total power requirement is180 KVA. Coal/lignite (20 TPD) will be used as fuel. DG set (180 KVA) will be installed.The Committee deliberated on the issues raised during the Public Hearing /Public Consultation meeting conducted by the Gujarat Pollution Control Board on 4 thMay, 2012. The issues raised during public hearing were regarding air emissions, localemployments, show cause notice issued by the GPCB etc. and have satisfactorily beenresponded by the project proponent and incorporated in the final EIA/EMP report. TheCommittee noted that unit is engaged in the manufacturing of laminated sheet in theexisting unit and laminated sheet manufacturing is not covered under EIA Notification,2006.After detailed deliberations, the Committee found the final EIA/EMP reportadequate and suggested to stipulate following specific conditions alongwith otherenvironmental conditions while considering for accord of environmental clearance:i) Ambient air quality data should be collected as per NAAQS standards notified bythe Ministry on 16 th September, 2009.ii) Regular monitoring of Volatile Organic Compounds (VOCs) should be carriedout.iii) Bag filter alongwith stack of adequate height should be provided to coal/lignitefired boiler/thermic fluid heater.iv) Fugitive emissions in the work zone environment, product, raw materials storagearea etc. should be regularly monitored. The emissions should conform to thelimits imposed by GPCB.v) Wet scrubber should be provided to control process emissions. Methanol shouldbe recovered from the process area.vi) Total fresh water requirement from ground water source should not exceed 20m 3 /day and prior permission should be obtained from the CGWA/SGWA.vii) As proposed, Industrial effluent will be treated in ETP. Treated effluent should bereused/recycled within the factory premises. Water quality of treated effluent shallmeet the norms prescribed by CPCB/SPCB.viii) As proposed Phenol should be extracted/treated from the effluent before sendingto the ETP.ix) The company should obtain Authorization for collection, storage and disposal ofhazardous waste under the Hazardous Waste (Management, Handling andTrans-Boundary Movement) Rules, 2008 and amended as on date formanagement of Hazardous wastes and prior permission from GPCB should be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!