11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.7.7. Resin (Phenol Formaldehyde Resins 500 MTPM; Melamine FormaldehydeResins 100 MTPM and Urea Formaldehyde Resins 100 MTPM) at Sy. No. 43/1,Village Nandasan, Taluka Kadi, District Mehsana, Gujarat by M/s DecentLaminates Pvt. Ltd. (TOR to EC)The project authorities and their consultant gave a detailed presentation on thesalient features of the project and proposed environmental protection measures to beundertaken as per Draft Terms of References (TORs) awarded during the 22 nd Meetingof the Expert Appraisal Committee (Industry) held during 29 th – 30 th April, 2011forpreparation of EIA/EMP. All the Synthetic Organic Chemicals Industry located outsidethe notified industrial area/estate are listed at S.N. 5(f) under category ‘A’ and appraisedat Central level.M/s Decent Laminates Pvt. Ltd. have proposed for the Resin (PhenolFormaldehyde Resins 500 MTPM; Melamine Formaldehyde Resins 100 MTPM andUrea Formaldehyde Resins 100 MTPM) at Sy. No. 43/1, Village Nandasan, TalukaKadi, District Mehsana, Gujarat. Total project area is 9228 m 2 . PAs confirmed that thisproject will be established in the existing premises. No wildlife sanctuary / reserve forestare located within 10 Km distance. Total cost of the project is Rs. 40.00 Lakhs.Following products will be manufactured:S.N. Name of the Products Existing Proposed Totaladdition1. Laminates sheets 28000pieces/month-- 28000pieces/month2. Phenol Formaldehyde -- 500 MTPM 500 MTPMResins3 Melamine Formaldehyde -- 100 MTPM 100 MTPMResins4 Urea Formaldehyde -- 100 MTPM 100 MTPMResinsAdditionally, PAs informed the Committee that ambient air quality monitoring wascarried out at 6 locations during May, 2011 to June, 2011 and submitted data indicatesas PM 10 (52–84 ug/m3), SO2 (14.1 – 25.9 ug/m3), NOx (15.4-27.0 ug/m3) and VOC(18–58 ug/m3). Incremental ground level concentration due to proposed project is SP(0.98 ug/m 3 ), SO 2 (0.168 ug/m 3 ) and NOx (0.130 ug/m 3 ). Multi-Cyclone separator alongwith stack (30 m) will be provided to control saw dust/lignite fired boiler/thermic fluidheater.Total ground water requirement from ground water source will increase from 7.5m 3 /day to 20 m 3 /day after proposed project. Industrial wastewater generation willincrease from 0.075 m 3 /day to 2.25 m 3 /day. Effluent will be treated in effluent treatmentplant followed by evaporator to achieve zero discharge. Domestic effluent will be treatedin septic tank followed by soak pit.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!