11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

sanctuary/reserve forest is located within 10 km distance. Following products will bemanufactured:S.N. Products Production CapacityExisting Proposed Total1 Laminates sheet 150000Nos./month or375 MTPM150000 Nos./month or 375MTPM300000 Nos./Month or 750MTPM2 PhenolFormaldehyde0.0 465 MTPM 465 MTPMResin3 Melamine F Resin 0.0 110 MTPM 110 MTPMAdditionally, PAs informed the Committee that ambient air quality monitoring wascarried out at 6 locations during November, 2011 to January, 2012 and submitted dataindicates as PM 10 (56.9–89.3 ug/m3), SO2 (12.0 – 20.2 ug/m3), NOx (13.8-25.7 ug/m3)and VOC (18–60 ug/m3). Incremental ground level concentration due to proposedproject is PM (1.321 ug/m 3 ), SO 2 (0.354 ug/m 3 ) and NOx (0.271 ug/m 3 ). Multi-Cycloneseparator along with stack (30 m) will be provided to control coal/lignite firedboiler/thermic fluid heater.Total ground water requirement from ground water source will increase from 5.0m 3 /day to 12 m 3 /day after proposed project. Industrial wastewater generation willincrease from 0.3 m 3 /day to 6.9 m 3 /day. Effluent will be treated in effluent treatmentplant followed by evaporator to achieve zero discharge. Domestic effluent will be treatedin septic tank followed by soak pit.Discarded drums and empty bags will be sent back to suppliers or sold to SPCBapproved vendors. Waste / used oil (0.5 KLPA) will be sold to authorized recyclers / reprocessors.ETP sludge will sent to TSDF. Organic waste residue will be sent tocommon hazardous waste incineration facility.Green belt will be developed in 33 % of plant area. Total power requirement is180 KVA. Coal/lignite (20 TPD) will be used as fuel. DG set (400 KVA) will be installed.The Committee deliberated on the issues raised during the Public Hearing /Public Consultation meeting conducted by the Gujarat Pollution Control Board on 4 thMay, 2012. The issues raised during public hearing were regarding social acitivity of thecompany; health of workers, hazardous waste generation, show cause notice issued bythe GPCB etc. and have satisfactorily been responded by the project proponent andincorporated in the final EIA/EMP report. The Committee noted that unit is engaged inthe manufacturing of laminated sheet in the existing unit and laminated sheetmanufacturing is not covered under EIA Notification, 2006.After detailed deliberations, the Committee found the final EIA/EMP report adequate andsuggested to stipulate following specific conditions alongwith other environmentalconditions while considering for accord of environmental clearance:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!