11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

After deliberations, the Committee desired following additional information:1. LDR measurement data from the exhaust of vaccum pump of the existingunit.2. Baseline VOC in the ambient air to be monitored for 1 month data.3. Evaporation loss is envisaged around 100 m 3 /day. Revised water balancechart to be submitted.The proposal was deferred till the desired information is submitted. The aboveinformation shall be provided with the uploading of minutes on the website.2.7.4. Grain and Molasses based Distillery Unit (160 KLPD), Co-generation PowerPlant (28 MW), CPP (3 MW) and expansion of Sugar Plant (925 to 4750 TCD) atKhasra No. 1098, 1140, 1217, 1331, 1342, 1141, 1337, 1339, 1340, 72, 184,1144, 1370, 1220, 1369, 932, 934, 1097, 485, 936,1137, 133,1138, Village &Tehsil Ryam, District Darbhanga, Bihar by M/s Tirhut Industries Limited- (TORto EC)The project authorities gave a detailed presentation on the salient features of theproject and proposed environmental protection measures to be undertaken as per DraftTerms of References (TORs) awarded during the 27 th Meeting of the Expert AppraisalCommittee (Industry) held during 21 st – 22 nd September, 2011 for preparation ofEIA/EMP. All molasses based distillery and non molasses based distillery (>30 KLD) arelisted at S.N. 5(g) under category ‘A’ and appraised at Central level.M/s Trihut Industries Ltd. have proposed for Distillery Unit (Grain and Molassesbased, 60 KLPD), Co-generation Power Plant (28 MW), CPP (3 MW) from concentratedspent wash/rice husk and expansion of Sugar Plant (925 to 4750 TCD) at KhasraNo.1098, 1140, 1217, 1331,1342, 1141, 1337, 1339, 1340, 72, 184, 1144, 1370, 1220,1369, 932, 934, 1097, 485, 936,1137, 133,1138, Village & Tehsil Ryam, DistrictDarbhanga, Bihar. Total land area envisaged for the proposed unit is 67 acres. No ecosensitivearea such as national park/wildlife sanctuary/biosphere reserve/reservedforests are located with 10 km. The proposed project involvs expansion & modernizationof old 925 TCD plant to 4750 TCD. Total project cost is Rs. 314.00 Crores. Distillery willbe operated for 310 days i.e. 160 days during season with molasses and cane juice andremaining 150 days with grains.Additionally, PAs informed the Committee that ambient air quality monitoring wascarried out at 6 locations during December, 2011 to February, 2012 and submitted dataindicates as PM 2.5 (11.8–19.2 ug/m3), SO2 (5.8 – 7.3 ug/m3), NOx (7.1-11.4 ug/m3) andHC (non-methane) (BDL). Incremental ground level concentration due to proposedproject is PM 10 (0.5 ug/m 3 ), SO 2 (7.9 ug/m 3 ) and NOx (2.8 ug/m 3 ). High efficiency ESPalongwith stack (75 m) will be provided to bagasse/cane thrash/rice husk fired boiler(135 TPH) and high efficiency ESP alongwith stach height (30 m) will be provided toconcentrated spent wash/rice husk fired boiler (25 TPH). Total water requirement fromground water source will be 3300 m3/day. Spentwash from molasses based distillery willbe concentrated in MEE to 60 % solid and then concentrate will be sent to a boiler (25TPH) for incineration to achieve zero discharge. Spent wash from grain based distillerywill be treated in decanter and then concentrated in MEE to concentrate the solids to 30% and then taken to a dryer alongwith wet cake from decanter to concentrate the solids

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!