11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

iv. The letter/application for EC shall quote the MOEF file No. and also attach acopy of the letter.v. The copy of the letter received from the Ministry shall be also attached as anannexure to the final EIA-EMP Report.vi. The final EIA-EMP report submitted to the Ministry must incorporate the issuesin this letter. The index of the final EIA-EMP report must indicate the specificchapter and page no. of the EIA-EMP Report.vii. Certificate of Accreditation issued by the QCI to the environmental consultantshall be included.The Committee prescribed the above ToRs for preparation of EIA/EMP reports.The proponent should prepare EIA/EMP Report based on the above TORs andsubmit the same to the State Pollution Control Board for conducting publichearing/consultation. The EIA/EMP Report should be as per the genericstructure given in Appendix-III of EIA Notification, 2006. The concerns raisedalongwith the replies during the Public Hearing/ Consultation should beincorporated in the EIA/EMP Report and the final EIA/EMP submitted to theMinistry for obtaining environmental clearance.2.6 Any Other2.6.1. Expansion of Sugar Plant (5,500-11,000 TCD), Molasses based Distillery Unit(35 KLPD to 100 KLPD), ENA Plant (20 KLPD to 75 KLPD) and Co-generationPower Plant (39 MW to 64 MW), establishment of Ethanol Plant (30 KLPD) andD.G. sets (2x1 MW) at Village Bellad-Bagewadi, Taluka Hukeri, District Belgaum,Karnataka by M/s Vishwanath Sugar and Steel Industries Limited,Karnataka. –reg.Environmental Clearance was accorded by the MoEF’s letter no J-11011/453/2009 dated 24 th November, 2011 for Expansion of Sugar Plant (5,500-11,000TCD), Molasses based Distillery Unit (35 KLPD to 100 KLPD), ENA Plant (20 KLPD to75 KLPD) and Co-generation Power Plant (39 MW to 64 MW) by M/s VishwanathSugar and Steel Industries Limited.Now, project proponent informed that boiler (150 TPH) will be installed insteadof 100 TPH. This modification will help the industry to generate 5 MW additional powerwithout any increase in fuel. The cogeneration capacity will ultimately become 69 MWinstead of 64 MW without any additional fuel requirement, land requirement & effluentgeneration.After detailed deliberations, the Committee recommended the proposal foramendment to the existing environmental clearance for use of boiler (150 TPH) insteadof 100 TPH.2.6.2. Expansion of project of NPK Grade Fertilizers at Valasapkala, Kakinada RuralMandal East Godavari, Andhra Pradesh by M/s Godavari Fertilizers andChemicals Ltd. –extension of validity.Project proponent vide letter 29 th December, 2011 (received in the Ministry on17 th April, 2012) has requested for extension of the validity of the existing environmentalclearance. Environmental clearance was accorded by the MoEF’s letter no. J-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!