11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15. Manufacturing process details alongwith the chemical reactions and process flowchart.16. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.17. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of one AAQMS in downwind direction.18. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx including HC and VOCs should be collected. Themonitoring stations should take into account the pre-dominant wind direction,population zone and sensitive receptors including reserved forests. Data forwater and noise monitoring should also be included.19. Air pollution control measures proposed for the effective control of gaseousemissions within permissible limits.20. Name of all the solvents to be used in the process and details of solvent recoverysystem.21. Design details of ETP, incinerator, if any along with control of Dioxin & Furan,boiler, scrubbers/bag filters etc.22. Details of water and air pollution and its mitigation plan23. Action plan to control ambient air quality as per NAAQES Standards notified bythe Ministry on 16 th September, 2009.24. An action plan to control and monitor secondary fugitive emissions from all thesources.25. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.26. Permission for the drawl of 6 m 3 /day water from the CGWA. Water balance chartincluding quantity of effluent generated recycled and reused and discharged.27. Action plan for segregation of effluent based on high COD, high TDS and LowTDS effluent stream alongwith ‘Zero’ discharge of effluent should be included.28. Ground water quality monitoring minimum at 6 locations should be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).29. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste.30. Action plan for the management of fly ash generated from boiler should beincluded. Tie-up or agreement with brick manufacturer to be provided.31. Precautions to be taken during storage and transportation of hazardouschemicals should be clearly mentioned and incorporated.32. A copy of the Memorandum of Understanding signed with cement manufacturersindicating clearly that they will utilized all the organic solid waste generated.33. A copy of ‘Memorandum of Understanding’ (MoU) signed with coal supplier forimported coal and brick manufacturers for management of fly ash.34. Authorization/Membership for the disposal of liquid effluent in CETP andsolid/hazardous waste in TSDF, if any.35. Risk assessment for storage for chemicals/solvents.36. Material safety data sheet of chemicals to be submitted.37. An action plan to develop green belt in 33 % area.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!