11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

located outside the notified industrial area/estate are listed at S.N. 5(f) under category ‘A’and appraised at Central level.M/s Arudaa Vis Labs Pvt. Ltd. has proposed for setting up of pharmaceuticaladvanced Intermediates Manufacturing Facility at Sy. No 105/3D, 105/3B, 105/7B,Village Chennivakkam, Tehsil Ponneri, District Thiruvallur, Tamil Nadu. Plot area is4862.0 m 2 . No forest land is pending against the project. Erumaivettipalam RF andPalavakkam RF are located at 6.0 km and 13.0 km respectively. KoratlliyarRiver,AraniRiver and sholarvarmLake are located at 3.0 Km, 5.5 km and 5.8 km respectively.No national parks/wildlife sanctuaries are located within 15 km. project cost is Rs. 2.6crores. Rs. 57.05 lakhs and Rs. 14.5 lakhs are earmarked towards capital cost andrecurring cost per annum. Following products will be manufactured:-S.N Products Capacity (Kg/Annum)1 EDC-CB Trimer 1202 AB Dimer 1203 DMT-5MeU 1204 DMT-5MeC 1205 DMT-G 1206 DMT-A 120Total 720Scrubber will be provided to control process emissions. Stack of 30 m will be provided todisperse air emissions from oil fired boiler.Fresh water requirement from ground water source will be 6.5 m3/day. Effluentgeneration will be 4.5 m3/day and treated in ETP.ETP waste and chemical residue willbe sent to TN waste management ltd. at Gummidipoondi. Power requirement will be 232HP/170 KW and met from TNEB. Greenbelt will be developed in 1374.10 m2. DG set (60KVA) will be installed.After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing ToRs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.3. Project location and plant layout.4. Promoters and their back ground.5. Regulatory framework6. A map indicating location of the project and distance from severely polluted area7. Infrastructure facilities including power sources.8. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.9. Project site location alongwith site map of 10 km area and site details providingvarious industries, surface water bodies, forests etc.10. Present land use based on satellite imagery for the study area of 10 km radius.11. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.12. Details of the total land and break-up of the land use for green belt and otheruses.13. List of products alongwith the production capacities.14. Detailed list of raw material required and source, mode of storage andtransportation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!