11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. Promoters and their back ground.4. Regulatory framework5. A map indicating location of the project and distance from severely polluted area6. Project location and plant layout.7. Infrastructure facilities including power sources.8. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.9. Project site location alongwith site map of 10 km area and site details providingvarious industries, surface water bodies, forests etc.10. Present land use based on satellite imagery for the study area of 10 km radius.Details of land availability for the project alongwith supporting document.11. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.12. Permission, if any, from the State Forest Department13. Details of the total land and break-up of the land use for green belt and otheruses.14. List of products alongwith the production capacities.15. Detailed list of raw materials required and source, mode of storage andtransportation.16. Manufacturing process details alongwith the chemical reactions and process flowchart.17. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.18. Ambient air quality monitoring at 6 locations within the study area of 5 km. aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of one AAQMS in downwind direction.19. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx including VOCs shall be collected. The monitoringstations shall take into account the pre-dominant wind direction, population zoneand sensitive receptors including reserved forests. Data for water and noisemonitoring shall also be included.20. Air pollution control measures viz. Multi-cyclone and bag filter etc. shall beproposed for the effective control of gaseous emissions within permissible limits.21. Control methanol emission from drying section.22. Details of VOC monitoring system in the working zone environment, if any.23. Name of all the solvents to be used in the process and details of solvent recoverysystem.24. Design details of ETP, incinerator, boiler, scrubbers/bag filters etc.25. Details of water and air pollution and its mitigation plan.26. Action plan to control ambient air quality as per NAAQES Standards notified bythe Ministry on 16 th September, 2009.27. An action plan to control and monitor secondary fugitive emissions from all thesources.28. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.29. Permission for the drawl of 11.21 m 3 /day ground water from CGWA. Waterbalance chart including quantity of effluent generated recycled and reused anddischarged.30. Action plan for ‘Zero’ discharge of effluent shall be included.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!