MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Committee decided that the proponent should prepare EIA/EMP Report basedon the above TORs and submit the same to the State Pollution Control Board forconducting public hearing/consultation. The EIA/EMP Report should be as per thegeneric structure given in Appendix-III of EIA Notification, 2006. The concerns emergedduring the Public Hearing/ Consultation should be incorporated in the EIA/EMP Reportand the final EIA/EMP submitted to the Ministry for obtaining environmental clearance.2.5.37. Resin Manufacturing Unit at Village Vemardi, Taluka Karjan, District Vadodara,Gujarat by M/s Jason Dekor Pvt. Ltd. (TOR).The project authorities and their consultant (Pragathi Labs & Consultants Pvt.Ltd.) gave a detailed presentation on the salient features of the project and proposedenvironmental protection measures to be undertaken alongwith the draft Term ofReferences for the preparation of EIA/EMP.All Synthetic Organic Chemicals Industrylocated outside the notified industrial area/estate are listed at S.N. 5(f) under category ‘A’and appraised at Central level.M/s Jason Dekor Pvt. Ltdhas proposed for setting up of resin ManufacturingUnit at Village Vemardi, Taluka Karjan, District Vadodara, Gujarat. Total project cost isRs. 1.5 Crores. Nodefence installation, biosphere reserve, national parks, wildlifesanctuary, are located within 10 Km. Total plot area is 35037 m 2 . Following products willbe manufactured :S.N. Product1 Phenol Formaldehyderesin2 MelamineFormaldehyde resin3 Urea FormaldehydeResinCapacity(MTPM)325150650Multicyclone separatorwill be provided tohot air generator and thermic fluid heater.Scrubber will be provided to methanol dryer. Water requirement from ground watersource will be 11.21 M 3 /day. Effluent generation will be 4.278 m 3 /day. Effluent will betreated in ETP based on photo fenton and treated water will be evaporated to achievezero discharge. Domestic effluent will be disposed through septic tank followed by soakpit. ETP sludge will be sent to TSDF. Resin waste will be incinerated in the commonincineration facility. Waste oil will be sent to authorize reprocessors. Greenbelt will bedeveloped in 11562 m 2 .After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing TORs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!