51. Public hearing to be conducted and issues raised and commitments made by theproject proponent on the same should be included in EIA/EMP Report in the formof tabular chart with financial budget for complying with the commitments made.52. A tabular chart with index for point wise compliance of above TORs.The following general points shall be noted:i. All documents shall be properly indexed, page numbered.ii. Period/date of data collection shall be clearly indicated.iii. Authenticated English translation of all material provided in Regionallanguages.iv. The letter/application for EC shall quote the MOEF file No. and also attach acopy of the letter.v. The copy of the letter received from the Ministry shall be also attached as anannexure to the final EIA-EMP Report.vi. The final EIA-EMP report submitted to the Ministry must incorporate the issuesin this letter. The index of the final EIA-EMP report must indicate the specificchapter and page no. of the EIA-EMP Report.vii. Certificate of Accreditation issued by the QCI to the environmental consultantshall be included.The Committee prescribed the above ToRs for preparation of EIA/EMP reports.The proponent should prepare EIA/EMP Report based on the above TORs and submitthe same to the State Pollution Control Board for conducting public hearing/consultation.The EIA/EMP Report should be as per the generic structure given in Appendix-III of EIANotification, 2006. The concerns raised alongwith the replies during the Public Hearing/Consultation should be incorporated in the EIA/EMP Report and the final EIA/EMPsubmitted to the Ministry for obtaining environmental clearance.2.5.36. Resin manufacturing unit at plant No. 5, Sy. No. 1/1, NH-8A, Varsana,Gandhidham, Kutch, Gujarat by M/s Rajkripal Exim Pvt. Ltd(TOR).The project authorities and their consultant gave a detailed presentation on thesalient features of the project and proposed environmental protection measures to beundertaken alongwith the draft Term of References for the preparation of EIA/EMP.AllSynthetic Organic Chemicals Industry located outside the notified industrial area/estateare listed at S.N. 5(f) under category ‘A’ and appraised at Central level.M/s Rajkripal Exim Pvt. Ltd. Has proposed for setting up of Resin manufacturingunit at plant No. 5, Sy.No.1/1, NH-8A, Varsana, Gandhidham, Kutch, Gujarat. Totalproject cost is Rs. 5.23 crores. No forest land is involved. No court case/litigation ispending against the project. Total plot area is 21000 m2. Following products will bemanufacturedList of Existing productS.N. Name of Product Quantity in Sq. m/month1 Plywood and block board 16,70,000List of Proposed intermediate Product

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!