MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

capacity(MT/Month)capacity(MT/month)Expansioncapacity(MTPM)1 Alphapinene (95%) N.A 200.00 2002 Polyester Resin 125 100.00 2253 Phenolic Resin 166.66 800.00 966.664 Alkyd Resin 25.00 300.00 3255 Coating NIL 500.00 5006 Rosin Easter 50 150 2007 Maleic Modified Resin 25 75.00 1008 Phenolic Modified Resin 25 75.00 1009 PVC chemicals NIL 500.00 50010 Camphene 75 200.00 27511 Dipentene 150 350.00 50012 Ketonic Resin 25 100 12513 Polyamide Resin 25 100 125Dust collector followed by wet scrubber will be provided to boiler (10 TPH)Water requirement from Patalganga River will be increased from 146 m3/day to182m 3 /day after expansion. Industrial effluent generation will be increased from 49 to 72m3/day after expansion. Effluent will be treated in ETP and treated effluent will betransferred to CETP for further treatment. Greenbelt will be developed in 6 acres of land.Fly ash will be sent to cement manufacturers. Resin residue, ETP sludge, copper basedand titanium based catalyst will be sent to CHWTSDF.After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing ToRs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.3. Project location and plant layout.4. Promoters and their back ground.5. Regulatory framework6. A separate chapter on status of compliance of Environmental Conditions grantedby State/Centre to be provided. As per circular dated 30 th May, 2012 issued byMoEF, a certified report by RO, MoEF on status of compliance of conditions onexisting unit to be provided in EIA/EMP report.7. Environment clearance for the existing unit issued by the Ministry (reasons, if notobtained), Consent to Operate and Authorization accorded by the MPCB.8. Data for the stack emissions, fugitive emissions; water requirement and waterbalance chart; wastewater generation, treated effluent quality, re-utilization anddisposal of solid/hazardous waste for the existing unit.9. A map indicating location of the project and distance from severely polluted area10. Infrastructure facilities including power sources.11. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!