11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

52. Any litigation pending against the project and/or any direction/order passed byany Court of Law against the project, if so, details thereof.53. Public hearing issues raised and commitments made by the project proponent onthe same should be included separately in EIA/EMP Report in the form of tabularchart with financial budget for complying with the commitments made.54. A tabular chart with index for point wise compliance of above TORs.The following general points shall be noted:i. All documents shall be properly indexed, page numbered.ii. Period/date of data collection shall be clearly indicated.iii. Authenticated English translation of all material provided in Regionallanguages.iv. The letter/application for EC shall quote the MOEF file No. and also attach acopy of the letter.v. The copy of the letter received from the Ministry shall be also attached as anannexure to the final EIA-EMP Report.vi. The final EIA-EMP report submitted to the Ministry must incorporate the issuesin this letter. The index of the final EIA-EMP report must indicate the specificchapter and page no. of the EIA-EMP Report.vii. Certificate of Accreditation issued by the QCI to the environmental consultantshall be included.The Committee decided that the proponent should prepare EIA/EMP Reportbased on the above TORs and submit the same to the State Pollution ControlBoard for conducting public hearing/consultation. The EIA/EMP Report should beas per the generic structure given in Appendix-III of EIA Notification, 2006. Theconcerns emerged during the Public Hearing/ Consultation should beincorporated in the EIA/EMP Report and the final EIA/EMP submitted to theMinistry for obtaining environmental clearance.2.5.35. Organic Chemicals Manufacturing Plant at Kumbhivali District Raigad,Maharashtra by M/s Dujodwala Products Ltd. (TOR).The project authorities and their consultant (Mitcon Consultancy and EngineeringServices Ltd., Pune) gave a detailed presentation on the salient features of the projectand proposed environmental protection measures to be undertaken alongwith the draftTerm of References for the preparation of EIA/EMP.All Synthetic Organic ChemicalsIndustry located outside the notified industrial area/estate are listed at S.N. 5(f) undercategory ‘A’ and appraised at Central level.M/s Dujodwala Products Ltd.have proposed for Expansion of Organic ChemicalManufacturing plant at Village Kumbhivalim, Tehsil Khalapur, Distt Raigad, Maharashtra.No forest land is involved. no court case/litigation is pending against the project. Totalplot area is 20.5 acres. Out of which expansion will be done in 5 acresof land. Patalganga River is flowing at a distance of 2.75 Km.Total project cost is Rs. 31 crores. Nonational park/sanctuary is located within 10 Km.Following products will be manufactured:S.N. Name of the chemical Existing Proposed Post

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!