11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the Synthetic Organic Chemical Units located outside industrial area/estate are listed atS.N. 5(f) under Category ‘A’ and appraised at the Central levelM/s Meridian Sunmica & Laminates Pvt. Ltd. has proposed for expansion ofPhenol Formaldehyde and Melamine Formaldehyde Resin Manufacturing Unit at Sy.No. 1743 & 1761/1, Village Gangad, Taluka Dholka, District Ahmedabad, Gujarat. Totalplot area is 38631 m 2 . Following products will be manufactured :S.N. Product Existing (MTPM) Proposed(MTPM)Capacityexpansion(MTPM)after1 Phenol Formaldehyderesin2 MelamineFormaldehyde resin120 600 72040 200 240Multicyclone followed by dust collector are installed in the existing steam boiler andthermic fluid heater. Scrubber will be provided to methanol dryer. Water requirementfrom ground water source will be increased from 40 M3/day to 46.8 m 3 /day afterexpansion. Effluent generation will be increased from 2.5 m 3 /day to 3.3 m 3 /day. Effluentwill be treated in ETP based on photo fentonprocess and treated water will beevaporated to achieve zero discharge. Domestic effluent will be disposed through septictank followed by soak pit. ETP sludge will be sent to TSDF. Resin waste will beincinerated in the common incineration facility. Waste oil will be sent to authorizedreprocessors. Greenbelt will be developed in 12850 m 2 .After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing TORs for preparation of EIA/EMP report:1. A separate chapter on status of compliance of Environmental Conditions grantedby State/Centre to be provided. As per circular dated 30 th May, 2012 issued byMoEF, a certified report by RO, MoEF on status of compliance of conditions onexisting unit to be provided in EIA/EMP report.2. Executive summary of the project3. Justification of the project.4. Promoters and their back ground.5. Regulatory framework.6. A map indicating location of the project and distance from severely polluted area.7. Project location and plant layout.8. Infrastructure facilities including power sources.9. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.10. Project site location alongwith site map of 10 km area and site details providingvarious industries, surface water bodies, forests etc.11. Environment clearance for the existing unit issued by the Ministry (reasons, if notobtained), Consent to Operate and Authorization accorded by the MPCB.12. Data for the stack emissions, fugitive emissions; water requirement and waterbalance chart; wastewater generation, treated effluent quality, re-utilization anddisposal of solid/hazardous waste for the existing unit.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!