conducting public hearing/consultation. The EIA/EMP Report should be as per thegeneric structure given in Appendix-III of EIA Notification, 2006. The concerns emergedduring the Public Hearing/ Consultation should be incorporated in the EIA/EMP Reportand the final EIA/EMP submitted to the Ministry for obtaining environmental clearance.2.5.33. Expansion of Synthetic Organic Chemical Manufacturing Facility at Sy. No.8,13,15,16,25,& 75 Takai, at Village Honad, Khalapur District Raigad,Maharashtra by M/s Prasol Chemical Ltd. (TOR).The project authorities gave a detailed presentation on the salient features of theproject and proposed environmental protection measures to be undertaken alongwith thedraft Term of References for the preparation of EIA/EMP.All the Synthetic OrganicChemical Units located outside industrial area/estate are listed at S.N. 5(f) underCategory ‘A’ and appraised at the Central level.M/s Prasol Chemical Ltd. has proposed for expansion of Organic chemicalmanufacturing facility at Sy. No. 8,13,15,16,25,& 75 Takai, at Village Honad, KhalapurDistrict Raigad, Maharashtra. No forest land is involved. no court case/litigation ispending against the project. Kondhave caves (Notified heritage site archeological surveyof India) is located at 11km. Following products will be manufactured:-S.No Product Quantity (MT/A)1 Phenol 200002 Acetone 12000ByproductsAlpha Methyl Styrene 1500Acetophenone 8003 Zinc Di-Organo Dithiophosphate 15004 Mesityl Oxide 7505 Hydrogenated compounds 1800Total water requirement from ground water source will be 352 m3/day. Effluentwill be treated in ETP. No effluent will be discharged outside the factory premises. Tarfrom phenol/acetone manufacture will be sent to cement manufacturing unit. ETP sludgewill be sent to TSDF, Taloja. Used oil will be sent to recyclers. Power requirement will beincrease from 1250 Kw to 2250 KW and sourced from MSEDCL. DG set (2 x 600 kw) areinstalled.After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing TORs for preparation of EIA/EMP report:1. A separate chapter on status of compliance of Environmental Conditions grantedby State/Centre to be provided. As per circular dated 30 th May, 2012 issued byMoEF, a certified report by RO, MoEF on status of compliance of conditions onexisting unit to be provided in EIA/EMP report.2. Executive summary of the project.3. Justification of the project.4. Promoters and their back ground.5. Regulatory framework.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!