11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22. Details of VOC monitoring system in the working zone environment, if any.23. Name of all the solvents to be used in the process and details of solvent recoverysystem.24. Design details of ETP, incinerator, boiler, scrubbers/bag filters etc.25. Details of water and air pollution and its mitigation plan.26. Action plan to control ambient air quality as per NAAQES Standards notified bythe Ministry on 16 th September, 2009.27. An action plan to control and monitor secondary fugitive emissions from all thesources.28. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.29. Permission for the drawl of 10 m 3 /day ground water from CGWA. Water balancechart including quantity of effluent generated recycled and reused anddischarged.30. Action plan for ‘Zero’ discharge of effluent shall be included.31. Treatment of phenol in the effluent, if any..32. Ground water quality monitoring minimum at 6 locations shall be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).33. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste. Action plan for thedisposal of fly ash generated from boiler shall be included.34. Explore the possibility to use fuel other than wood.35. Precautions to be taken during storage and transportation of hazardouschemicals shall be clearly mentioned and incorporated.36. Authorization/Membership for the disposal of solid/hazardous waste in TSDF.37. List of hazardous chemicals (as per MSIHC rule) with toxicity levels.38. A write up on “Safe Practice” followed for methanol handling, storage,transportation and unloading to be submitted.39. A write up on “Treatment of workers affected by accidental spillage of methanol/phenol”.40. Locating the plant in open area instead of covered to be reviewed in view ofsafety consideration.41. An action plan to develop green belt in 33 % area42. Action plan for rainwater harvesting measures at plant site shall be included toharvest rainwater from the roof tops and storm water drains to recharge theground water.48. Details of occupational health programme.i) To which chemicals, workers are exposed directly or indirectly.ii) Whether these chemicals are within Threshold Limit Values (TLV)/ PermissibleExposure Levels as per ACGIH recommendation.iii) What measures company have taken to keep these chemicals within PEL/TLV.iv) How the workers are evaluated concerning their exposure to chemicals duringpre-placement and periodical medical monitoring.v) What are onsite and offsite emergency plan during chemical disaster.vi) Liver function tests (LFT) during pre-placement and periodical examination.43. Details of occupational health surveillance programme.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!