Total power requirement will be 7.5 MW.After deliberations, the Committee prescribed the following TORs for thepreparation of draft EIA/EMP:1. Executive summary of the project.2. Compliance of environmental conditions prescribed by the SPCB for the existingsugar unit3. Detailed breakup of the land area along with latest photograph of the area.4. Present land use based on satellite imagery.5. Details of site and information related to environmental setting within 10 kmradius of the project site.6. Copy of application submitted for clearance under the Wildlife (Protection) Act,1972, from the Standing Committee of the National Board for Wildlife as theproject is located within 10 Km distance of Balmiki Tiger reserve.7. Permission from the State Forest Department regarding the impact of theproposed plant on the surrounding reserve forest.8. List of existing distillery units in the study area alongwith their capacity.9. Number of working days of the distillery unit and CPP.10. Total cost of the project along with total capital cost and recurring cost/annum forenvironmental pollution control measures.11. Manufacturing process details of sugar plant and CPP alongwith process flowchart.12. Details of raw materials and source of raw material molasses, bagasse etc.13. Sources and quantity of fuel (coal etc.) for the boiler. Measures to take care ofSO 2 emission. A copy of Memorandum of Understanding (MoU) signed with thecoal suppliers should be submitted, in case coal is used.14. Action plan prepared by the SPCB to control ambient air quality as per NAAQESStandards for PM 10, PM 2.5 , SO 2 and NO X as per GSR 826(E) dated 16 thNovember, 2009.15. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NO X and HC (methane & non methane) should becollected. The monitoring stations should take into account the pre-dominantwind direction, population zone and sensitive receptors including reservedforests. Data for water and noise monitoring should also be included.16. Mathematical modeling for calculating the dispersion of air pollutants and groundlevel concentration along with emissions from the boiler.17. An action plan to control and monitor secondary fugitive emissions from all thesources.18. Details of boiler and its capacity. Details of the use of steam from the boiler.19. Ground water quality around existing /proposed spent wash storage lagoon andthe project area.20. Details of water requirement, water balance chart for Sugar and Co-generationplant. Measures for conservation water by recycling and reuse to minimize thefresh water requirement.21. Prior ‘permission’ for the drawl of total fresh water. Details of source of watersupply.22. Hydro-geological study of the area for availability of ground water.23. Proposed effluent treatment system for sugar unit as well as CPP and schemefor achieving ‘zero’ discharge.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!