11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

i. All documents shall be properly indexed, page numbered.ii. Period/date of data collection shall be clearly indicated.iii. Authenticated English translation of all material provided in Regional languages.iv. The letter/application for EC shall quote the MOEF file No. and also attach acopy of the letter.v. The copy of the letter received from the Ministry shall be also attached as anannexure to the final EIA-EMP Report.vi. The final EIA-EMP report submitted to the Ministry must incorporate the issuesin this letter. The index of the final EIA-EMP report must indicate the specificchapter and page no. of the EIA-EMP Report.vii. Certificate of Accreditation issued by the QCI to the environmental consultantshall be included.The Committee decided that the proponent should prepare EIA/EMP Reportbased on the above TORs and submit the same to the State Pollution Control Board forconducting public hearing/consultation. The EIA/EMP Report should be as per thegeneric structure given in Appendix-III of EIA Notification, 2006. The concerns emergedduring the Public Hearing/ Consultation should be incorporated in the EIA/EMP Reportand the final EIA/EMP submitted to the Ministry for obtaining environmental clearance.Regarding proposal of Kudos Agrohols Ltd., the Committee of the view thatalthoughproposal of M/s Kudos Agrohols Ltd. was submitted alongwith M/s KudosChemie Ltd. but not listed in the agenda. Therefore,proposal of Kudos Agrohols Ltd., willbe considered in the next coming meeting.2.5.31. Expansion of Sugar Mill (2500 TCD to 7000 TCD) at P.O. Naraipur, TehsilBagaha, District West Champaran, Bihar by M/s Tirupati Sugars Ltd. (TOR).The project authorities and their consultant gave a detailed presentation on thesalient features of the project and proposed environmental protection measures to beundertaken alongwith the draft Term of References for the preparation of EIA/EMP.Allsugar industries (> 5000 TCD cane crushing) are listed at S.N. 5(j) under category ‘B’and appraised at state level. However, due to applicability of general condition (i.e.Balmiki Tiger reserve within 10 Km), project proposal is treated as category ‘A’ project.M/s Tirupati Sugars Ltd. has submitted revised proposal for the expansion ofsugar will (2500 TCD to 7000 TCD) at village Naraipur, Tehsil Bagba, District WestChamparan, Bihar. No forest land is involved. Total plot area is 125 acres. Gandok riveris at 25 Km. Balmiki Tiger reserve is situated at about 5 Kms. Co-generation plant (3MW) is installed in the existing Unit. CPP (3 MW) and CPP (6MW) will be installed. Totalproject Cost is Rs. 10178.05 lakhs. Expansion will be done within existing premises. Nocourt case / litigation is pending against the project.High efficiency wet scrubber system will be installed with new boilers to controlparticulate emissions within 150 mg/Nm 3 .Water requirement from ground water sourcewill be 550 m 3 /day. Wastewater generation in sugar factory has been reduced from 400l/Ton of Cane Crushed to 100 l/Ton of cane crushed in 2010. Zero discharge concept willbe followed by adopting recycle and reuse of wastewater. Air cooled condenser will beinstalled. Effluent will be treated in the ETP and treated water will be used for irrigationor in house use. Boiler Ash, Bagasse, Pressmud are the solid waste. Bagasse will beused as fuel. Press mud will be composted. Green belt will be developed in 19.55 acresout of 59.10 acres total land. DG Set will be provided with acoustic enclosure.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!