MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14. List of products alongwith the production capacities.15. Detailed list of raw material required and source, mode of storage.16. Manufacturing process details alongwith the chemical reactions and process flowchart.17. Action plan for the transportation of raw material and products.18. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.19. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of one AAQMS in downwind direction.20. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx, CO, NH 3 including VOCs shall be collected. Themonitoring stations shall take into account the pre-dominant wind direction,population zone and sensitive receptors including reserved forests. Data forwater and noise monitoring shall also be included.21. Details of water and air pollution and its mitigation plan22. Air pollution control measures proposed for the effective control ofgaseous/process emissions within permissible limits.23. An action plan prepared by SPCB to control and monitor secondary fugitiveemissions from all the sources.24. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.25. Name of all the solvents to be used in the process and details of solvent recoverysystem.26. Design details of ETP, incinerator, if any alongwith boiler, scrubbers/bag filtersetc.27. Action plan to control ambient air quality as per NAAQS Standards notified by theMinistry on 16 th September, 2009.28. Permission from CGWA/SGWA for the drawl of 54.1 m 3 /day ground water. Waterbalance chart including quantity of effluent generated recycled and reused andeffluent discharge.29. Complete scheme of effluent treatment. Characteristics of untreated and treatedeffluent to meet the standard.30. Zero discharge effluent concepts to be adopted.31. Ground water quality monitoring minimum at 6 locations shall be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).32. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste. Action plan for thedisposal of fly ash generated from boiler shall be included.33. Material Safety Data Sheet for all the Chemicals are being used/will be used.34. Authorization/Membership for the disposal of solid/hazardous waste in TSDF.35. Risk assessment for storage for chemicals/solvents. Action plan for handling &safety system.36. An action plan to develop green belt in 33 % area. Layout plan for green beltshall be provided.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!