11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12. Present land use based on satellite imagery for the study area of 10 km radius.13. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.14. Details of the total land and break-up of the land use for green belt and otheruses.15. List of products alongwith the production capacities.16. Detailed list of raw material required and source, mode of storage andtransportation.17. Manufacturing process details alongwith the chemical reactions and process flowchart.18. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.19. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of one AAQMS in downwind direction.20. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx including HC and VOCs should be collected. Themonitoring stations should take into account the pre-dominant wind direction,population zone and sensitive receptors including reserved forests. Data forwater and noise monitoring should also be included.21. Air pollution control measures proposed for the effective control of gaseousemissions within permissible limits.22. Design details of ETP, incinerator, if any alongwith boiler, scrubbers/bag filtersetc.23. Details of water and air pollution and its mitigation plan24. An action plan to control and monitor secondary fugitive emissions from all thesources.25. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.26. Permission for drawl of water from concerned authority. Water balance chartincluding quantity of effluent generated recycled and reused and discharged.27. Action plan for ‘zero’discharge of effluent should be included. Treatment &disposal of produced water.28. Ground water quality monitoring minimum at 6 locations should be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).29. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste.30. List of hazardous chemicals (as per MSIHC rule) with toxicity levels.31. Authorization/Membership for the disposal of liquid effluent in CETP andsolid/hazardous waste in TSDF.32. An action plan to develop green belt in 33 % area33. Action plan for rainwater harvesting measures at plant site should be included toharvest rainwater from the roof tops and storm water drains to recharge theground water.34. Details of occupational health programme.i) To which chemicals, workers are exposed directly or indirectly.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!