11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(ix)(x)Status of approval of Accreditation with Quality Council of India / NationalAccreditation Board of Education and Training (QCI/NABET) as per circular noF. No. J -l1013/77/2004-IA II(I) dated 28 th June, 2010 available on the Ministry’swebsite http://www.moef.nic.in.‘Certificate of Accreditation’ issued by the QCI to the environmental consultantshould be included.The Committee decided that the proponent should prepare EIA/EMP Reportbased on the above TORs. The EIA/EMP Report should be as per the generic structuregiven in Appendix-III of EIA Notification, 2006. The final EIA/EMP alongwith ‘Certificateof Accreditation’ issued by the QCI should be submitted to the Ministry for obtainingenvironmental clearance. The committee noted that public hearing is not required asproject site is located in off-shore.2.5.24. Expansion of Fertilizer Unit at Sy. No. 108 & 109, at Village Halavarthi,Taluka &District Koppal, Karnataka by M/s K.P.R Fertilizers Ltd. (TOR)The project authorities and their consultant gave a detailed presentation on thesalient features of the project and proposed environmental protection measures to beundertaken alongwith the draft Term of References for the preparation of EIA/EMP.Allfertilizer plant except single super phosphate plant is listed at S.N. 5(a) under category‘A’ and appraised at Central level. under category ‘A’ and appraised at Central level.M/s K.P.R Fertilizers Ltd hs proposed for Expansion of Fertilizer Unit at Sy.No.108 & 109, at Village Halavarthi, Taluka & District Koppal, Karnataka. No forests landis involved. no Court case/litigation is pending against the project. Total land inpossession is 20.07 acres. Additional land of 7.05 acres will be acquired. Trungabhadrareservoir is located 5.0 km. Project cost is Rs. 20.0 crores. Tungabhadra Reservoir islocated at 4.8 Km. No national parks/sanctuaries are located within 10 Kms.Environmental clearance was accorded by the Ministry’s letter no J-11011/677/2009 –IAII (I) dated 7 th July, 2011. Following are the list of existing and proposed products.S. N. Product Production Capacity (TPD)ExistingProposed TotalExpansion1 Single Super Phosphate 200 150 350(Powdered /Granulated)2 Di-Calcium Phosphate (DCP) 10 40 503 Mineral Mixtures 40 -- 404 N.P.K. Mixtures Plant 500 100 6005 Pesticides formulation unit 35 -- 356 Sulphuric acid unit 120 -- 1207 Di methyl Sulphate -- 50 508 Linear alkyl benzeneSulphonic Acid (LABSA)-- 40 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!