‘Operator’ on 30.06.2010. Block area is 4981 km 2 . Total project cost is Rs. 900 Crores.Following are the coordination of well location:WellLocationLongitude(E)Latitude (N)Waterdepth (m)Target(m)Distance (Km) fromPort BlairLineCoast1 91 O 03’09.90” 14 O 11’54.61” 2795 6000 337 2122 90 O 48’09.38” 14 O 02’58.66” 2820 6000 333 2243 90 O 57’57.93” 13 O 57’25.76” 2850 6000 314 206M/s ONGC has proposed for exploratory drilling of 3 wells in offshore NELP block AN-DWN-2009/2. The block was awarded to ONGC (60%) &OIL (40%) with ONGC as‘Operator’ on 30.06.2010. Block area is 3995 km 2 . Total project cost is Rs. 900 Crores.Following are the coordination of well location:WellLocationLongitude(E)Latitude (N)Waterdepth (m)Target(m)Distance (Km) fromPort BlairLineCoast1 90 O 40’15.28” 13 O 44’31.60” 2875 6000 313 2302 90 O 26’13.40” 13 O 39’51.75” 2880 6000 329 2553 90 O 29’15.38” 13 O 24’40.88” 2905 6000 307 245M/s ONGC has proposed for exploratory drilling of 3 wells in offshore NELP block AN-DWN-2009/3. The block was awarded to ONGC (60%) &OIL (40%) with ‘jointOperatorship’ on 30.06.2010. Block area is 3992 km 2 . Total project cost is Rs. 900Crores. Following are the coordination of well location:WellLocationLongitude(E)Latitude (N)Waterdepth (m)Target(m)Distance (Km) fromPort BlairLineCoast1 90 O 57’01.83” 13 O 44’27.40” 2915 6000 300 2002 91 O 09’31.82” 13 O 39’35.18” 2925 6000 272 1773 90 O 54’48.79” 13 O 27’39.55” 2910 6000 274 200

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!