A 80 7 0.00 15 18 0.00Block area is 1471 Km 2 . Exploratory wells (6 Nos.)will be drilled upto depth of3700m.Duration of drilling will be 35-40 days. Total cost of the project will be Rs. 475.90Crores. Water consumption will be 25-30 m 3 /day. water based mud will be used. Jackuprig will be used. Quantity of drill cutting will be 400-500 m 3 /day. Drill cutting (DC) will beseparated from water based mud (WBM) and washed properly and unusable drillingfluids (DF) will be disposed off in well designed lined pit with impervious liner for solardrying. Disposal of drill cuttings and drill mud will be carried out in accordance with theGSR 546 (E) dated 30 th August, 2005. Fuel will be used 8-12 KLD of diesel for gensetsof drilling rigs. Power requirement will be met from DG sets (5x1500 KVA).B. Block-KG-OSN-2009/4 (NELP-VIII)Location and coordinates of the block KG-OSN-2009/4 (NELP-VIII) will be asfollows:Point Longitude LatitudeDeg. Min. Sec. Deg. Min. SecA 80 45 0.00 15 39 0.00B 80 47 28.00 15 40 0.00C 80 56 15.00 15 42 54.00D 81 2 0.00 15 46 0.00E 81 1 0.00 15 48 0.00F 81 4 0.00 15 53 0.00G 81 9 35.14 15 57 28.69H 81 13 40.00 15 45 25.00I 81 1 42.00 15 38 32.00J 81 1 24.00 15 36 3.00K 80 49 24.00 15 33 2.00A 80 45 0.00 15 39 0.00Block area is 835 Km 2 . Exploratory wells (7 Nos.)will be drilled upto depth of4600m.Duration of drilling will be 45-50 days. Total cost of the project will be Rs. 674.1Crores. Water consumption will be 25-30 m 3 /day. water based mud will be used. Jackuprig will be used. Quantity of drill cutting will be 550-600 m 3 /day. Drill cutting (DC) will beseparated from water based mud (WBM) and washed properly and unusable drillingfluids (DF) will be disposed off in well designed lined pit with impervious liner for solardrying. Disposal of drill cuttings and drill mud will be carried out in accordance with theGSR 546 (E) dated 30 th August, 2005. Fuel will be used 8-12 KLD of diesel for gensetsof drilling rigs. Power requirement will be met from DG sets (5x1500 KVA).After detailed deliberations, the Committee found the final EIA/EMP report adequate andsuggested to stipulate following specific conditions alongwith other environmentalconditions while considering for accord of environmental clearance:i. Total water requirement should not exceed 30 m 3 /day.ii.Water based mud shall be used.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!