µg/m 3 , 6 µg/m 3 to 21.3 µg/m 3 and 8.2 µg/m 3 to 31.3 µg/m 3 respectively. AAQ modelingstudy indicates that the maximum incremental GLCs after the proposed expansion wouldbe 1.63 µg/m 3 and 5.2µg/m 3 with respect to PM and NO x respectively. The resultantconcentrations are within the NAAQS.The total water requirement for proposed expansion will be 4,080 m 3 /d and willbe sourced from ground water. Rainwater harvesting scheme is already in operation torecharge groundwater aquifers. Further, all the buildings of proposed project will beprovided with suitable rainwater harvesting system. The water requirement for the SAFis only for cooling purpose and for cleaning of waste furnace gases. There would be nodischarge outside the project area. Slurry from the Gas Cleaning Plant (GCP) will betreated in the Effluent Treatment Plant and Clarified water shall be recycled to the GCP.The effluent treatment plant shall be designed so as to maintain zero discharge. The Fe-Mn Slag will be used for Si-Mn production and Si-Mn slag will be supplied to WCL formine stowing. The GCP sludge will be used in the existing Sinter Plant. The used/spentoil be sold to authorized reusers/ recyclers registered with CPCB/ MoEF.The Committee deliberated on the issues raised during the Public Hearing / PublicConsultation meeting conducted by the Maharashtra Pollution Control Board on 21 stApril,2012. The issues raised in the public hearing were regarding tree plantation,pollution control measures, CSR activities like health, infrastructure, orphanages,permission from CGWB for withdrawal of ground water etc.which were addressed in theEIA/EMP report.After detailed deliberations, the Committee sought the following information forreconsideration: Documents regarding change in the name of the company. Authenticated map showing the location of the plant and Tadoba Tiger Reservealong with comments from Chief Wildlife Warden. A copy of application submittedto NBWL. Permission/NOC from the Archaeological Survey of India as a number of templesare located within 10 km distance Confirmation on the total production capacity as 0.1725 TPA or 0.1772 TPA Revised layout plan incorporating the rain water harvesting and revised greenbelt. Recheckeddata on AAQ. Copy of the original Public Hearing proceedings2.2.6. Installation of 300 TPD Deinked Pulp Line (DPL) and up-gradation of CaptiveCo-generation Plant (CCP) at Kagithapuram, District Karur in Tamil Nadu byM/s Tamil Nadu Newsprint and Papers Limited - regarding EC.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!