11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.5.17. Manufacture of Phenol Formaldehyde Resin (550 MTPM) and MelamineFormaldehyde Resin (100 MTPM) at Sy. No. 81, Village Sartanpur, TehsilWankaner, District Rajkot, Gujarat by M/s Riona Laminate Pvt. Ltd. (TOR toEC).The project authorities and their consultant (Pragathi Labs & Consultants Pvt.Ltd.)gave a detailed presentation on the salient features of the project and proposedenvironmental protection measures to be undertaken as per Draft Terms of References(TORs) awarded during the 29 th Meeting of the Expert Appraisal Committee (Industry)held during 17 th –18 th November, 2011for preparation of EIA/EMP.All the syntheticorganics manufacturing units, if located outside notified industrial area are listed at S.N.5(f) under Category ‘A’ and appraised at the Central level.M/s Riona Laminate Pvt. Ltd. have proposed for the manufacture of PhenolFormaldehyde Resin (550 MTPM) and Melamine Formaldehyde Resin (100 MTPM) atSy. No. 81, Village Sartanpur, Tehsil Wankaner, District Rajkot, Gujarat. Total plot areais 13,557 sq.m. No national park, wildlife, sanctuary, reserve forest is located within 10km radius. Paneli reserve forest is located at 3.75 Km. Total cost of the project isRs. 9.0Crores. Rs.14.00 Lakhs and Rs. 9.60 Lakhs are earmarked towards capital costand recurring cost/annum towards environmental pollution control measures. Followingwill be manufactured:S.N. Name of Products Quantity1 Phenol Formaldehyde Resin 550 MTPM2 Melamine Formaldehyde Resin 100 MTPMAmbient air quality monitoring was carried out at 8 locations during October 2011– December 2011 and submitted data indicates as PM 10 (53.7–83 ug/m 3 ), SO 2 (15.3 –28.2 ug/m 3 ) and NO x (7.0-17.4 ug/m 3 ). Predicted value of ground level concentration dueto proposed project is SPM (3.97 ug/m 3 ), NOx (2.667 ug/m 3 ) and SO 2 (7.44 ug/m 3 ).Methanol vapor gas will be passed through water scrubber. Dust collector will beprovided to lignite/white coal fired boiler (4 TPH).Total fresh water requirement from ground water source will be 47 m3/day.Effluent will be treated in ETP based on photo fenton process. Treated water will beevaporated to achieve zero discharge. ETP sludge will be sent to secured landfill site.Waste/residue resins will be incinerated at common hazardous waste disposal facility.Used oil will be sent to authorized recyclers. Lignite/white coal will be used as fuel forboiler. Power requirement for the proposed project is estimated to be 450 HP, which willbe met from Gujarat State Electricity Board.The Committee deliberated upon the issues raised during the Public Hearing /Public Consultation meeting conducted by the Gujarat Pollution Control Board on 5 th

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!