11.07.2015 Views

Portland-Milwaukie Light Rail Bridge Construction, June 2011 - TriMet

Portland-Milwaukie Light Rail Bridge Construction, June 2011 - TriMet

Portland-Milwaukie Light Rail Bridge Construction, June 2011 - TriMet

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Drill Shafts for Tower Foundation6 drilled shafts per tower Shafts are 10’ indiameter Drilled down 150’ to 170’ Pile cap: concretecover over the6 drilled shafts Pile cap is10’ to 18’ thick Together, the shaftsand pile cap serve asthe tower foundationPile Cap and Shafts(in red)17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!