Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

11.07.2015 Views

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 20092018a. Interim financial arrangementsMain measures to be undertakenorder to provide uninterrupted supply to the existing power generation facilities, the Governmentshall:needed to open Sibovc SW in time; andb. Sustainable development of the lignite mining sectorThe Government shall continue to strengthen its role in enabling private investment for mineralthe impact of coal transportation and ash storage, encouraging good global practiceson conversion technologies, and setting up the regulatory institutions and frameworks economic development to the project; participation at the local level; and c. Environmental and social safeguardsThe Government is committed to addressing the social issues resulting from mine development inparticipation and resettlement of people living in zones anticipated for development will beformulated in line with EU regulations so as to ensure that the impact on people caused by thethe beginning of 2010; covered with overburden material from the existing lignite mines; reclaimed land, including policies for the resettlement of affected households andFaqe 64Ministry of Energy and Mining

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 20092018d. Good governance policiesThe Government shall:on Strategic Environmental and Social Assessment (SESA) and proposed amendmentsto the Law on Expropriation; and ensure adequate separation of policy and regulatory functions, in line with the best11.2 ElectricityPolicies to be implementedDespite major capital and operating subsidies by the international community and the KosovoBudget over the past 10 years, operational performance of Kosovo Energy Corporation (KEKTo address this problem, Kosovo is moving forward with the Kosova e Re TPP Project, which incompliant power generation capacity, that will support demand in Kosovo for uninterruptableUntil commissioning of the Kosova e Re, satisfying electricity demand will be achieved bycapacities enter into operation, shortages will be covered, as best as possible, by imports andMain measures to be undertaking for meeting the electricity demanda. Maintenance and normal operation of the existing power generation capacities1. TPP Kosova A, commercial operation with regular maintenance until the end of 2017at latest:• operation with two or three units, depending on availability of coal supply;• operation with three units after the New Mine comes in production;• realization of project for hydraulic transportation of ash in mines; and2. TPP Kosova B, commercial operation with two units:• Operation with two units in the long term; and Ministry of Energy and Mining Faqe 65

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>a. Interim financial arrangementsMain measures to be undertakenorder to provide uninterrupted supply to the existing power generation facilities, the Governmentshall:needed to open Sibovc SW in time; andb. Sustainable development of the lignite mining sectorThe Government shall continue to strengthen its role in enabling private investment for mineralthe impact of coal transportation and ash storage, encouraging good global practiceson conversion technologies, and setting up the regulatory institutions and frameworks economic development to the project; participation at the local level; and c. Environmental and social safeguardsThe Government is committed to addressing the social issues resulting from mine development inparticipation and resettlement of people living in zones anticipated for development will beformulated in line with EU regulations so as to ensure that the impact on people caused by thethe beginning of 2010; covered with overburden material from the existing lignite mines; reclaimed land, including policies for the resettlement of affected households andFaqe 64Ministry of <strong>Energy</strong> and Mining

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!