ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 2009–2018a. Interim financial arrangementsMain measures to be undertakenorder to provide uninterrupted supply to the existing power generation facilities, the Governmentshall:needed to open Sibovc SW in time; andb. Sustainable development of the lignite mining sectorThe Government shall continue to strengthen its role in enabling private investment for mineralthe impact of coal transportation and ash storage, encouraging good global practiceson conversion technologies, and setting up the regulatory institutions and frameworks economic development to the project; participation at the local level; and c. Environmental and social safeguardsThe Government is committed to addressing the social issues resulting from mine development inparticipation and resettlement of people living in zones anticipated for development will beformulated in line with EU regulations so as to ensure that the impact on people caused by thethe beginning of 2010; covered with overburden material from the existing lignite mines; reclaimed land, including policies for the resettlement of affected households andFaqe 64Ministry of Energy and Mining
ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 2009–2018d. Good governance policiesThe Government shall:on Strategic Environmental and Social Assessment (SESA) and proposed amendmentsto the Law on Expropriation; and ensure adequate separation of policy and regulatory functions, in line with the best11.2 ElectricityPolicies to be implementedDespite major capital and operating subsidies by the international community and the KosovoBudget over the past 10 years, operational performance of Kosovo Energy Corporation (KEKTo address this problem, Kosovo is moving forward with the Kosova e Re TPP Project, which incompliant power generation capacity, that will support demand in Kosovo for uninterruptableUntil commissioning of the Kosova e Re, satisfying electricity demand will be achieved bycapacities enter into operation, shortages will be covered, as best as possible, by imports andMain measures to be undertaking for meeting the electricity demanda. Maintenance and normal operation of the existing power generation capacities1. TPP Kosova A, commercial operation with regular maintenance until the end of 2017at latest:• operation with two or three units, depending on availability of coal supply;• operation with three units after the New Mine comes in production;• realization of project for hydraulic transportation of ash in mines; and2. TPP Kosova B, commercial operation with two units:• Operation with two units in the long term; and Ministry of Energy and Mining Faqe 65
- Page 13 and 14: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 15 and 16: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 17 and 18: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 19 and 20: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 21 and 22: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 23 and 24: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 25 and 26: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 27 and 28: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 29 and 30: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 31 and 32: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 33 and 34: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 35 and 36: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 37 and 38: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 39 and 40: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 41 and 42: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 43 and 44: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 45 and 46: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 47 and 48: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 49 and 50: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 51 and 52: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 53 and 54: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 55 and 56: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 57 and 58: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 59 and 60: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 61 and 62: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 63: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 67 and 68: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 69 and 70: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 71 and 72: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 73 and 74: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 75 and 76: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 77 and 78: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 79 and 80: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 81 and 82: ENERGY STRATEGY OF THE REPUBLIC OF
ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>a. Interim financial arrangementsMain measures to be undertakenorder to provide uninterrupted supply to the existing power generation facilities, the Governmentshall:needed to open Sibovc SW in time; andb. Sustainable development of the lignite mining sectorThe Government shall continue to strengthen its role in enabling private investment for mineralthe impact of coal transportation and ash storage, encouraging good global practiceson conversion technologies, and setting up the regulatory institutions and frameworks economic development to the project; participation at the local level; and c. Environmental and social safeguardsThe Government is committed to addressing the social issues resulting from mine development inparticipation and resettlement of people living in zones anticipated for development will beformulated in line with EU regulations so as to ensure that the impact on people caused by thethe beginning of 2010; covered with overburden material from the existing lignite mines; reclaimed land, including policies for the resettlement of affected households andFaqe 64Ministry of <strong>Energy</strong> and Mining