ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 2009–2018Also it is planned to prepare Pre-feasibility Study for conversion of HPP Ujman into a reversibleregulative framework for development of renewable energy sources, including preparation ofIn the framework of the EnCT, Kosovo has developed both annual and 10-year indicative targets forelectricity produced from renewable energy sources in the internal electricity market, and (ii) MEM has developed and is implementing a number of projects as part of the three-year Kosovolaw, it has promoted a number of secondary legislative acts which regulate certain areas of EEon Labeling of Household Appliances, (ii) Administrative Instruction on Energy Auditing, (iii)Administrative Instruction on Use of Energy by Final Consumers, (iv) Administrative Instructionon Annual and Decennial Indicative Targets for RER, and (v) Government Decision on IncentivesDuring 2006 a pre-feasibility study on hydro potentials was prepared,, and in 2008 an evaluationof solar energy potentials as well as wind, biomass and geothermal water potentials was carriet seminar on the role of EE and RER (2005), Organization of an Energy Auditing Course (2008),Study on EE Measures in some public facilities (2008), Drafting of the tendering procedures forthe construction of small hydro power plants (2008), and Promotion of Solar Energy (installationof solar panels in the Kosovo University Clinical Centre and in the Students’ Centre in PrishtinaAs a contracting party of the Energy Community Treat (EnCT), Kosovo is a member of the EnCT3.6 Environmental ProtectionEnvironmental protection falls under the mandate of the Ministry of Environment and Spatialand facilities, emissions of gases and dust as well as discharges of polluted water from the existingThe Final Strategic Environmental and Social Assessment (SESA) 6 development of the New Mine Area Development Plan also, which will outline the sector’s investment framework and mitigationFaqe 26Ministry of Energy and Mining
ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD 2009–2018existing situation and the development of the energy and lignite sector in the wider region of theGovernment of Kosovo and the future investor will need to make in the context of improving the Plant, the scheme and dynamics of the mine development, the power plant unit size, the selectionof the technology, and the pace of project development in relation with the demand for electricityReferring to the Baseline Environmental and Social Study, this report reaches the conclusion thatthe current environmental situation in the energy sector is rather complex due to a number ofreasons:• Environmental situation is deeply affected by past mining activities that have caused• Air quality is poor due to emissions from existing power plants, which are not incompliance with current EU standards;• Quality of air and ground water have been largely deteriorated by dumping of ash andpast;• Quality of surface waters has been effected by untreated water discharges from thepower plants, mining activities and urban sewerage waters;• Noise emissions from mining activities are annoying to inhabitants living nearby themine; control (of water and air); and The main recommendations of SESA Report and the analysis of possible development scenariosare as follows:• TPP Kosova A is the preferred location for the construction of the TPP Kosova e Re,• Both available commercial lignite combustion technologies (PF or CFB) areFurthermore, SESA report describes the existing legal and institutional framework related toenvironment protection and environmental management at national, regional and local levels andMinistry of Energy and Mining Faqe 27
- Page 1 and 2: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 3 and 4: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 5 and 6: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 7 and 8: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 9 and 10: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 11 and 12: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 13 and 14: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 15 and 16: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 17 and 18: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 19 and 20: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 21 and 22: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 23 and 24: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 25: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 29 and 30: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 31 and 32: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 33 and 34: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 35 and 36: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 37 and 38: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 39 and 40: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 41 and 42: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 43 and 44: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 45 and 46: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 47 and 48: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 49 and 50: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 51 and 52: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 53 and 54: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 55 and 56: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 57 and 58: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 59 and 60: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 61 and 62: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 63 and 64: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 65 and 66: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 67 and 68: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 69 and 70: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 71 and 72: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 73 and 74: ENERGY STRATEGY OF THE REPUBLIC OF
- Page 75 and 76: ENERGY STRATEGY OF THE REPUBLIC OF
ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>Also it is planned to prepare Pre-feasibility Study for conversion of HPP Ujman into a reversibleregulative framework for development of renewable energy sources, including preparation ofIn the framework of the EnCT, <strong>Kosovo</strong> has developed both annual and 10-year indicative targets forelectricity produced from renewable energy sources in the internal electricity market, and (ii) MEM has developed and is implementing a number of projects as part of the three-year <strong>Kosovo</strong>law, it has promoted a number of secondary legislative acts which regulate certain areas of EEon Labeling of Household Appliances, (ii) Administrative Instruction on <strong>Energy</strong> Auditing, (iii)Administrative Instruction on Use of <strong>Energy</strong> by Final Consumers, (iv) Administrative Instructionon Annual and Decennial Indicative Targets for RER, and (v) Government Decision on IncentivesDuring 2006 a pre-feasibility study on hydro potentials was prepared,, and in 2008 an evaluationof solar energy potentials as well as wind, biomass and geothermal water potentials was carriet seminar on the role of EE and RER (2005), Organization of an <strong>Energy</strong> Auditing Course (2008),Study on EE Measures in some public facilities (2008), Drafting of the tendering procedures forthe construction of small hydro power plants (2008), and Promotion of Solar <strong>Energy</strong> (installationof solar panels in the <strong>Kosovo</strong> University Clinical Centre and in the Students’ Centre in PrishtinaAs a contracting party of the <strong>Energy</strong> Community Treat (EnCT), <strong>Kosovo</strong> is a member of the EnCT3.6 Environmental ProtectionEnvironmental protection falls under the mandate of the Ministry of Environment and Spatialand facilities, emissions of gases and dust as well as discharges of polluted water from the existingThe Final Strategic Environmental and Social Assessment (SESA) 6 development of the New Mine Area Development Plan also, which will outline the sector’s investment framework and mitigationFaqe 26Ministry of <strong>Energy</strong> and Mining