11.07.2015 Views

1756-RM001B-EN-P, Using ControlLogix in SIL2 ... - Tuv-fs.com

1756-RM001B-EN-P, Using ControlLogix in SIL2 ... - Tuv-fs.com

1756-RM001B-EN-P, Using ControlLogix in SIL2 ... - Tuv-fs.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SIL Policy 1-5IMPORTANTThe system user is responsible for:• the set-up, SIL rat<strong>in</strong>g and validation of anysensors or actuators connected to the<strong>ControlLogix</strong> control system.• project management and functional test<strong>in</strong>g.• programm<strong>in</strong>g the application software and themodule configuration accord<strong>in</strong>g to thedescription <strong>in</strong> the follow<strong>in</strong>g chapters.The <strong>SIL2</strong> portion of the certified system excludes thedevelopment tools and display/human mach<strong>in</strong>e<strong>in</strong>terface (HMI) devices; these tools and devices arenot part of the run time control loop.Proof TestsIEC 61508 requires the user to perform various proof tests of theequipment used <strong>in</strong> the system. Proof tests are performed atuser-def<strong>in</strong>ed times (for example, proof test <strong>in</strong>tervals can be once ayear, once every two years or whatever timeframe is appropriate) and<strong>in</strong>clude some of the follow<strong>in</strong>g tests:• Test<strong>in</strong>g of all fault rout<strong>in</strong>es to verify that process parameters aremonitored properly and the system reacts properly when a faultcondition arises.• Test<strong>in</strong>g of digital <strong>in</strong>put or output channels to verify that they arenot stuck <strong>in</strong> the ON or OFF state.• Calibration of analog <strong>in</strong>put and output modules to verify thataccurate data is obta<strong>in</strong>ed from and used on the modules.IMPORTANTUsers’ specific applications will determ<strong>in</strong>e thetimeframe for the proof test <strong>in</strong>terval.However, keep <strong>in</strong> m<strong>in</strong>d that the Probability ofFailure on Demand (PFD) calculations listed <strong>in</strong>Table 1.3 on page 1-10 use a proof test <strong>in</strong>terval ofonce per year. If the proof test <strong>in</strong>terval is changed,the <strong>in</strong>formation must be recalculated.For sample PFD calculations for proof test <strong>in</strong>tervalsof 2 and 4 years, see Appendix EFor more <strong>in</strong>formation on system proof tests, see Chapter 2, The<strong>ControlLogix</strong> System. For more <strong>in</strong>formation on the necessary I/Omodule proof tests, see Chapter 6, <strong>ControlLogix</strong> I/O Modules.Publication <strong>1756</strong>-<strong>RM001B</strong>-<strong>EN</strong>-P - October 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!