Figure 6: Transverse section showing access drift <strong>and</strong> SB pile removal chamber<br />

Tieback Removal through the TBM<br />

During construction <strong>of</strong> the PSST headwall structure, the temporary excavation support soldier pile wall running<br />

northwest was supported by a tieback anchoring system. The tieback system was arranged in five rows at intervals<br />

<strong>of</strong> 3.4 to 3.7 m (10 to 12 ft), which intersect the proposed SB tunnel envelope as shown in Figure 6. The tiebacks<br />

consist <strong>of</strong> steel cables anchored over a minimum 4.6 m (15 ft) length at the cable terminus, <strong>and</strong> intersect the SB<br />

tunnels to varying degrees. The TBM is likely to encounter tiebacks over a 13.7 m (45 ft) long interval, starting<br />

approximately 16.8 m (55 ft) before the PSST headwall. In accordance with the specification an earth pressure<br />

balance (EPB) TBM will excavate in closed mode (pressurized face) up to this position <strong>and</strong> then convert to open<br />

mode (non-pressurized face) while excavating under the cover <strong>of</strong> the jet-grouted tieback zone. Following each <strong>of</strong> the<br />

7 to 8 ring excavation sequences required to mine through the tieback zone, interventions are to be carried out as<br />

necessary to cut the cables engaged by the cutterhead or exposed in the face. This is anticipated to ensure that at no<br />

time there will be more than 1.5 m (5 ft) <strong>of</strong> cable exposed which could become entangled in the TBM cutterhead.<br />

Stability <strong>of</strong> the crown during these interventions will be provided by the ground treatment zone. Figure 7 shows a<br />

perspective view <strong>of</strong> the intersection <strong>of</strong> tiebacks with the SB tunnel envelope.<br />

Figure 7: Perspective <strong>of</strong> tiebacks intersecting the SB tunnel envelope (ground treatment not shown for clarity)<br />