Figure 4. Plan view showing the adopted final design alternative connection (sections arrows provide some<br />

idea <strong>of</strong> the detailed engineering required to make the design work)<br />

Temporary Shaft Support<br />

<strong>Construction</strong> <strong>of</strong> the temporary access/retrieval shaft for the NB TBM tunnel has been designed to proceed according<br />

to the following steps:<br />

� A roughly rectangular shaft will be constructed so that the PSST headwall <strong>and</strong> additional temporary soldier<br />

piles will support the shaft excavation from elevation 52 m (170 ft) to the base <strong>of</strong> the PSST structure. The<br />

layout <strong>of</strong> the piles avoids the electrical duct bank <strong>and</strong> the overhang <strong>of</strong> the existing vent structure.<br />

� The 22 m (70 ft) shaft will rely on the temporary soldier piles, wales at 2.4 to 3.7 m (8 to 12 ft) level<br />

intervals, <strong>and</strong> timber lagging are anticipated, similar to the successful model used for temporary excavation<br />

support <strong>of</strong> the PSST.<br />

� Temporary soldier piles will be installed in order to safely excavate the shaft to the level <strong>of</strong> the access drift<br />

<strong>and</strong> provide access for removal <strong>of</strong> the existing soldier piles within the shaft.<br />

� Upon completion <strong>of</strong> the works for the temporary pile removal chamber, the shaft will be excavated to a<br />

point where the NB tunnel headwall break-out panel can be removed.<br />

� Existing soldier piles that were used as temporary support for the PSST <strong>and</strong> are within the Temporary<br />

Access Shaft will be removed.<br />

� Once this work has been completed, all the soldier piles within the tunnel envelope will be cut or extracted<br />

after bracing the existing piles in lifts, with removal carried up to 0.6 m (2 ft) above the crown.<br />

5