List of Acronyms€ EuroAAPAnnual Action ProgrammeACMSAid Coordination and Management SectionACPAfrican Caribbean PacificAFAction FicheAfDBAfrican Development BankAIDCOEuropeAid Co-operation OfficeAIMSAid Information Management SystemAMSPAccompanying Measures for Sugar Protocol CountriesCAPCommon Agricultural PolicyCBACost-Benefit AnalysisCDMClean Development MechanismCERCertified Emission ReductionCESConnected Electricity SystemCHPCombined Heat and PowerCMPComprehensive Mitigation PlanCSPCountry Strategy PaperDFIDevelopment Finance InstitutionDNADesignated National AuthorityDOEDesignated Operational EntityEEmalangeni (currency of <strong>Swaziland</strong>)EBAEverything But ArmsECEuropean CommissionEcofinEconomic and financial analysisEEEnergy EfficiencyEIAEnvironmental Impact AssessmentEUEuropean UnionFAFinancial AgreementFIRRFinancial Rate of ReturnGDPGross Domestic ProductGHGGreenhouse GasesGoSGovernment of <strong>Swaziland</strong>IEEInitial Environmental EvaluationIFADInternational Fund for Agricultural DevelopmentIMImpact Mitigationiii


of the three schemes. Unfortunately, due to limited resources in the <strong>RDMU</strong>, the tenderdocument for this service contract could not be finalised in the reporting period.In the context of implementing the SCGA Grant Contract, the <strong>RDMU</strong> undertook a technicalaudit on all 43 individual smallholder cane growers. Some of their farms might berehabilitated through funds from the SCGA grant. In parallel, some other studies wereconducted and finalised: Assessment of primary seed cane, finalisation of the ratoon bulkinput procurement system and the outgrower energy generation study.The <strong>RDMU</strong> assisted the EU in the process of drawing up the final document of the MIP 2011-2013. The EU informed the NAS stakeholders in December that the final allocation forMIP2011-2013 will be € 54.267 million.Under “Result 2b: Implementation and financing of other NAS activities facilitated”, the<strong>RDMU</strong> continued to work on the Project Development Document (PDD) for the Ubombo fuelswitch and energy efficiency project. The PDD was finalised and submitted for validation.The <strong>RDMU</strong> continued to develop more PR material such as an <strong>RDMU</strong> newsletter and a radiospot and press coverage around the signing of the AAP 2009 Financing Agreement.Under Result 2c: A monitoring and evaluation system for the NAS established”, the <strong>RDMU</strong>revised the NAS logframe and developed a Monitoring and Evaluation framework for theNAS. The M&E framework will be updated once a year in close cooperation with thestakeholders.Under Result 3: “Government and donor liaison facilitated”, no major activities can bereported. Being integrated into the ACMS of MEPD, the GFA TA team will assist in thedevelopment of an overall resource mobilisation strategy.Under “Result 4: Stakeholder liaison established and in operation”, the <strong>RDMU</strong> is continuingits coordination and liaison role with the stakeholders on a frequent basis. Numerous NASSC and NAS WG were organised in which important issues (MIP 2011-2013 and AAP 2010and AAP 2011) were thoroughly discussed.Capacity building activities were organised for the stakeholders on EU procedures andregulations (5-day seminar) and for irrigation technicians from SWADE, MoA and <strong>RDMU</strong> a 4-week training on irrigation designs was run. Two formal training sessions were organised forstakeholders including the MEPD, the NAS WG and the NAS SC. A highlight was conductinga study tour to Zambia where 15 stakeholders were capacitated in the area of Fairtrade.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 2


2 P R O G R E S S R E P O R T A N D F U T U R E W O R K P R O G R A M M E B Y R E S U L T( F R O M 0 1 A U G U S T 2 0 1 0 T O 1 3 D E C E M B E R 2 0 1 0 )Result 1: <strong>RDMU</strong> is established and managedActivity Planned during period Achieved during period Planned for next 6 monthsR 1 A 1: Staffing of <strong>RDMU</strong> according to needsNothing planned in the reportingperiod.The <strong>RDMU</strong> economist resigned in August 2010. The Financemanager got seriously sick in October and has not beenreplaced in the reporting period. Request for a replacementwas submitted to the EU at the beginning of January 2011.With the signing of the contract addendum, only threeexperts are foreseen in the extension phase. Due to thesickness of the Finance Manager, the <strong>RDMU</strong> was staffedonly with the team leader and the agriculturalist from midOctober onwards.Replacement of the Finance Manager assoon as possible.With the signing of the extension, the GFATA team will be embedded in the AidCoordination and Management Section(ACMS) of the MEPD housed in the Annex ofthe MEPD.R 1 A 2: Undertaking technical and economic studies related to NAS implementationRevision of NAS Logframe anddevelopment of an M&E frameworkfor NAS.Financial analysis on selectedsmallholder cane growershareholding companies.Financial analyses on transportinfrastructures north and south.Energy / Carbon Outgrower Study.Technical Audit of 43 individualsmallholder cane growers.All studies planned were undertaken and finalised.No study planned.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 3


Activity Planned during period Achieved during period Planned for next 6 monthsEstablishment of the RatoonManagement Input Procurementsystem.Mananga education Trust BusinessPlan.Assessment of primary seed canescheme.R 1 A 3: Supervising and monitoring of consultants and contractors funded by the AMSPSee R 2 aA 2 See R 2 aA 2 See R 2 aA 2Result 2 a: EU Accompanying Measures for <strong>Swaziland</strong> are committed and implementedActivity Planned during period Achieved during period Planned for next 6 monthsR 2a A 1: Identify projects implementing MIP 2007 -2010 and MIP 2011-2013 and assist with preparation of the PIF, AF, AAP,FA, TAPAAP 2010: Road TransportInfrastructureSigning of the Financing AgreementThe Financing Agreement for the AAP 2010 was not signeduntil after the end of the reporting period.It is expected that the Financing Agreementof the AAP 2010 will be signed by EU andMEPD in January 2011.AAP 2011<strong>RDMU</strong> will develop the PIF, AF andTAP in the last quarter of 2010.Mananga Study will commence inAugust 2010. Results will contributeto the AAP 2011.The <strong>RDMU</strong> assisted the EU and MEPD in developing thePIF, AF and TAP up to the end of the reporting period.Comments and questions raised by the Quality SupportGroup (QSG) were incorporated. The approval by the QSQ isexpected in the second quarter of 2011.The Mananga Educational Trust Study to develop a businessplan for the Mananga College was finalised in December2010. It is expected that some of its results will substantiatethe technical proposals of the potential grant beneficiarieswithin the <strong>Swaziland</strong> Sugar Facility.The TA team from the former <strong>RDMU</strong> willassist in answering questions if raised by theQSG.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 4


Activity Planned during period Achieved during period Planned for next 6 monthsR 2 aA 2: Assist EU and MEPD in: development of tender documents, launching and evaluating tenders, preparing contracts, supervision, monitoring and guidance ofcontractors according to the AAPs and specific objectivesAAP 2006: Final DesignInfrastructures NorthFinalisation of tender documentsand launch of works tender at theend of 2010.<strong>RDMU</strong> will undertake an Ecofinanalysis of the proposedDvokolwako infrastructure.The Final Detailed Design Report of the Mananga – SihoyyeRoad was submitted by NOD in December 2010.The Final Design Report on the Dvokolwako – ManzanaRoad was submitted by NOD in December 2010.The draft tender Document on the Mananga-Sihoyye workscontract was submitted by NOD in November 2010.The <strong>RDMU</strong> was heavily involved in commenting and verifyingthe various documents. In commenting on the three abovementioned documents, the <strong>RDMU</strong> received support throughan international short term expert (civil engineer) reviewingand commenting on the documents.Much discussion was devoted to the price escalationformula. The tender document has not been finalised yet andit is expected that the final approval of the EU on the tenderdocument will be made in April/May 2011.Once the Mananga – Sihhoye tenderdocument is in the final stage (approval bythe EU), the tender document of theDvokolwako-Manzana road can be finalisedwithin a short time.Finalisation of tender documents and launchof the works tender Mananga – SihhoyeJune/July 2011.The tender for the Dvokolwako – Manzanaroad is expected to be launched inconjunction with Contract 2 for theSiphofaneni -St Phillips Infrastructure project.The <strong>RDMU</strong> spent considerable time guiding, supervising andmonitoring NOD. Moreover, considerable time was devotedto reviewing timesheets, invoices and auditor‟s reports.In parallel, the <strong>RDMU</strong> has started coordinating the process ofland acquisition for the North (identification, assessment ofcompensation and negotiation with the affected parties).The <strong>RDMU</strong> undertook a thorough financial and economicanalysis of the proposed Dvokolwako– Manzana road whichshowed financial and economic viability.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 5


Activity Planned during period Achieved during period Planned for next 6 monthsAAP 2007: Support tosmallholder cane growersContinuous check and verification ofcontractor invoices for EU Round 1and also EU Round 2.Assistance in launching EURound 3 tender irrigation works andevaluation to ensure that thecontract will be signed before theend of December 2010.<strong>RDMU</strong> will undertake a verythorough financial analysis of thecurrent smallholder model to assessviability and sustainability.EU Tender 1: all irrigation schemes in LUSIP (IRRICON)were completed and commissioned in August 2010 (398 ha)and the sugar cane planting process was finalised at the endof October 2010.Ingcayizivele (SII) faced several problems, partly with nonavailability of seed cane in conjunction with technicalproblems in irrigation installation. Planting started inNovember 2010, however was not finish. In parallel, thecontractor is facing a fine for delays for which he isresponsible.EU Tender 2 (861 ha): Contract was awarded at the end ofAugust to S&B and signed on the 22 nd October 2010 for 861ha. The first activities such as bush clearing started at theend of January 2011.EU Tender 3 (296 ha): The tender opening was on 28 thSeptember 2010 and the contract was awarded to S&B andis expected to be complete before Christmas 2010. The<strong>RDMU</strong> assisted in the evaluation of the bids. It is expectedthat the first activities will start in February 2011.M&E and an appropriate reporting formatcapturing the irrigation implementationprogress is a shortcoming. The NAS TA willassist a suitable reporting format.Support in the thorough check andverification of payment certificates of EUtender 1, 2, and 3.Assistance in solving some of the landconflicts.With regard to financial analysis of thesmallholder sugar cane cultivation, theproposal is to extend the assessment onexisting farmer associations and individualgrowers.As in the previous reporting period, the <strong>RDMU</strong> was heavilyinvolved in the checking and correction of interim paymentcertificates for the two contractors for the EU Round 1tender.The <strong>RDMU</strong> undertook a state-of-the art financial analysis ofsome of the EU supported farmer associations of EURound 1 and 2 tailored for each specific situation catering fortender prices, actual electricity cost, and ratoon replacement.The general findings indicated that smallholder canecultivation is principally financially not unviable.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 6


7. BELAIDŽIO RYŠIO (WLAN) KONFIGŪRAVIMASLaukelyje SSID Name įveskite naują WLAN tinklo vardą ir spauskite mygtuką Submit.Pastaba. Atkreipkite dėmesį, kad pagrindinis jūsų WLAN radijo siųstuvo valdiklis yraSSID1. Šios informacijos gali prireikti konfigūruojant WLAN saugumo parametrus.7.1.1 Belaidžio ryšio saugumo nustatymaiNorėdami konfigūruoti belaidžio tinklo saugumo nustatymus:1. Spustelėkite meniu punktą Security.2. Atsidarys belaidžio ryšio šifravimo nuostatų langas.3. Galite nustatyti:• autentifikavimo būdą lauke Authentication Type pasirinkdamiOpen System, Shared Key, WPA‐PSK, WPA2‐PSK arba palikdami pradinįnustatymą WPA/WPA2‐PSK;Pastaba. Jeigu naudojate modernų kompiuterį su Windows XP ar naujesneOS, patariame šio parametro nekeisti, kad jūsų WLAN tinklas išliktų saugus;• lauke WPA Passphrase galite įrašyti naują savo sugalvotą WLAN tinkloslaptažodį;Pastaba. Slaptažodį parinkite saugų, kad būtų bent iš 10 simbolių, naudokitedidžiąsias ir mažąsias raides, skaičius ir specialius simbolius.Pvz. 1. Nesaugus slaptažodis 19740501.Pvz. 2. Saugus slaptažodis 2gArbAn1U$.


Activity Planned during period Achieved during period Planned for next 6 monthsR 2A 3: ASSIST EU AND MEPD IN THE DEVELOPMENT OF THE MIP 2011 – 2013Finalisation of the MIP 2011-2013,endorsement by the NAS SC.<strong>RDMU</strong> assisted the EU in drawing up the document. Aftersome stakeholder consultation, the final document will besent to EU headquarters in December 2010 / January 2011.Information on the final allocation (€ 54.267 mio) wasprovided to MEPD by EU headquarters in December 2010.Signing of the MIP 2011-2013.Result 2 b: Implementation and financing of other NAS activities facilitatedActivity Planned during period Achieved during period Planned for next 6 monthsR 2b A 1 Assistance to MEPD in efforts to secure donors notably providing necessary information to potential donors (drawing up strategy on donor liaison,development of bankable projects, conducting field trips)<strong>RDMU</strong> will assist MEPD in developingthe donor strategy provided thevarious project packages such asthe RMF and carbon documents arefinalised and agreed upon.No activities undertaken in this respect.R 2b A 2 Assist in facilitating donor meetings to focus donors’ support and to avoid duplication of effortsTA NAS TA team is integrated in ACMS ofMEPD. The TA team will assist MEPD indeveloping an overall resource mobilisationplan which is a task of the ACMS.Donors will be approacheddepending on the availability ofbankable project proposals.Any donor mission in <strong>Swaziland</strong> willbe approached and briefed.In the absence of bankable projects, no donor conferencehas been organised.No progress on the economic diversification study in<strong>Swaziland</strong> to be funded by AfDB.Donors will be approached depending on theavailability of bankable project proposals.Any donor mission in <strong>Swaziland</strong> will beapproached and briefed.R 2 bA 3 Develop visibility and communication strategy & and disseminate brochures and leaflets to inform all stakeholders and donors about the NAS and MIPVisibilityUpdating of the website andproduction of additional PR materialsuch as <strong>RDMU</strong> writing pads.<strong>RDMU</strong> regularly updated the <strong>RDMU</strong> website. <strong>RDMU</strong> writingpads produced and disseminated. Due to high demand,another batch of <strong>RDMU</strong> cricket hats, mugs and umbrellaswere produced and distributed.Occasional update of the <strong>RDMU</strong> website withimportant information. No other major activitiesare planned since <strong>RDMU</strong> closed down and theincidental budget for the extension phase isclose to “zero”. Any major visibility will need tocome from Programme Estimates managed byMEPD.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 10


Activity Planned during period Achieved during period Planned for next 6 monthsR 2 A 4 Organise press conferences, radio and TV spots on the NAS and the MIPRadio spotNothing foreseen in the nextreporting period.Not applicable.Nothing foreseen in the next reporting period.Media coverageIf possible, signing ceremony of FA2010 with press coverage inDecember 2010.AAP 2010 not ready for signature in the reporting period.If possible, signing ceremony of FA 2010 withpress coverage at the beginning of 2011.It is planned to have the official launch of theSCGA grant contract covered by the printmedia.Result 2 C: A monitoring and evaluation system for the NAS established and in operationActivity Planned during period Achieved during period Planned for next 6 monthsR 2c A 1 Design a M&E system for the NAS and its implementationPerforming monitoring according tothe M&E framework.M&E framework continuously updated in close cooperationwith all NAS stakeholders.It has been realized that the M&E system forthe smallholder irrigation developmentcomponent needs to be improved. The TANAS team will develop a suitable monitoringtool to be applied by SHIP.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 11


Result 3: Government and Donor Liaison facilitatedActivity Planned during period Achieved during period Planned for next 6 monthsR 3 A 1 Identifying and approaching the major donor agencies, tailoring investment / intervention packages for the various donor agencies and donor follow upSee activities under R 2b A 2. See accomplishment under R 2b A 2. See activities under R 2b A 2.R 3 A 2Organisation of multi-donor conferencesNothing planned for the reportingperiod.Not applicable.Nothing particular foreseen for the nextreporting period.Result 4: Stakeholder liaison mechanisms are established and in operationActivity Planned during period Achieved during period Planned for next 6 monthsR 4 A 1 Organise weekly planning meetings with MEPDR 4 A 2: Organize NAS SC and NAS WGWeekly meetings organised.NAS SC on a bi-monthly basisNAS WG on the occasion of specialevents.R 4 A 3site visits with the major stakeholders / NAS WGNothing particular planned.The <strong>RDMU</strong> met MEPD at the weekly Monday meetingsthroughout the reporting period. Moreover, many ad hocmeetings have been organised to discuss important issues.From January 2011 onwards, the <strong>RDMU</strong> will be fullyintegrated into the ACMS of MEPD.2 NAS SC meetings held.8 NAS WG meetings held.Members of parliament were invited to visit the areas wherethe NAS is physically intervening.EU quality support group member was invited to visit theirrigation development areas.Not applicable anymore.To be continued as planned and needs arise.Site visits, usually ad hoc, organised when theneed arises.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 12


Activity Planned during period Achieved during period Planned for next 6 monthsR 4 A 4 Conduct field Support and perform capacity building of stakeholders enabling them to efficiently contribute to the programmeFormal capacity buildingStudy tour to Zambia on fair-tradeplanned.15 NAS stakeholders went to Zambia for a study tour onFairtrade and smallholder development inAugust/September 2011.Mainstreaming capacity building and trainingon the job is an integral part of the TA NASteam.Training plan developed for the ACMS teamand implementation facilitated by the TA NASteam.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 13


3 R E S U L T 1 : R D M U E S T A B L I S H E D A N DM A N A G E D3 . 1 R 1 A 1 : S t a f f i n g o f R D M U a c c o r d i n g t o n e e d s3 . 1 . 1 A A P 2 0 0 6 a n d A A P 2 0 0 9Progress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations&activities for comingreporting periodIssues requiring urgentattentionThe <strong>RDMU</strong> economist resigned in August 2010. He was quicklyreplaced in September 2010. The <strong>RDMU</strong> Finance Manager gotseriously sick in October and has not been replaced in thereporting period. Request for a replacement were submitted tothe EU mid December 2010 and beginning of January 2011.Due to the sickness of the Finance Manager, the <strong>RDMU</strong> teamhas been staffed only with the team leader and the agriculturalistfrom mid October onwards. It is expected the new FinanceManager will not start working before mid March 2011.With the signing of the addendum for the extension, the EUrecommended to revise the existing logframe (logframe versionNo. 4) of the <strong>RDMU</strong> in such a way that it is more in line with thefirst (original) version. This means that the whole reportingstructure (Progress Reports, M&E of the GFA service contract)need to be changed.From January 2011 onwards, the GFA TA team will be embeddedin the Aid Coordination and Management Section (ACMS) of theMEPD housed in the Annex of the MEPD. A new location wasavailed and refurbished for the ACMS in the last quarter of 2010.The <strong>RDMU</strong> will move into the new premises with furniture andequipment from the former office.Quick replacement of the Finance Manager.3 . 2 R A 2 : U n d e r t a k i n g t e c h n i c a l a n d e c o n o m i cs t u d i e s r e l a t e d t o N A S i m p l e m e n t a t i o n3 . 2 . 1 A A P 2 0 0 6 a n d A A P 2 0 0 9Progress achievedduring reporting period(01 Feb 2010-13 Dec 2010)The <strong>RDMU</strong> conducted the following studies (all studies can bedownloaded from the <strong>RDMU</strong> website: www.rdmu.org):Revised NAS Logframe and M&E framework for the NAS: Thisassignment took place in March and April 2010. An NAS logframewas developed which forms the basis of an M&E system for theNAS which will be updated on a yearly basis in close cooperationwith all NAS stakeholders.Traffic Count Study on roads set out as a priority for NAS funding.Financial and Economic Analyses on various transportinfrastructure projects: in order to prepare the various Action<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 14


Fiches, the <strong>RDMU</strong> undertook for all proposed road projects anEcofin study. All projects are financially and economically viable(for details see last progress report).Financial analysis on selected smallholder cane growershareholding companies 2 : The cash flow calculations of thebusiness plans for the smallholder shareholding companies whichwere submitted for EU funding are generally not tailored inaccordance with each shareholding company. They do notinclude tender cost, no actual O&M, no replacement and do notoffer an option for Fairtrade and cane trash sales. Therefore, the<strong>RDMU</strong> developed improved cash flows and financial andeconomic analysis to make an assessment of the variouscompanies‟ viability. In a nutshell, small shareholding companiesare financially not viable whereas larger ones are. However,Fairtrade revenues and cane trash sales can make allshareholding companies financially viable and sustainable.Energy / Carbon Outgrower Study: This study assesses theviability of a Combined Heat and Power (CHP) Plant based onsugar cane trash jointly owned and operated by farmerassociations, millers and a private utility. The main idea behindthis proposal is to reduce electricity cost of smallholder canegrowers and to increase their income by selling electricityproduced on the basis of sugar cane trash. The concept isfinancially and economically viable, however, it needs the stronginvolvement of the millers who have decided to go their own way.Technical Audit of 43 individual smallholder cane growers: all 43individual smallholder cane growers‟ irrigation schemes werereviewed and cost estimates for rehabilitation derived. Theintention is that within the SCGA grant, some of these farmers willbe rehabilitated.Establishment of the Ratoon Management Input Procurementsystem: A simple concept was developed to assist smallholdercane growers in benefiting from reduced prices through bulkpurchases of farm inputs as well as from pre-finance by themillers and then deducted from the proceeds in agreement withthe financial institutions which lent significant amounts to thesmallholder cane growers. This assignment was the sugarindustry‟s response in respect of the (in their opinion) too complexratoon management fund. 3Mananga education Trust Business Plan: the financial viability ofthe Mananga College was assessed assuming several scenarios2 The expressions “farmer associations” and „smallholder shareholding companies” do have the same meaningin <strong>Swaziland</strong>. We usually use the expression farmer associations, however, in the correct legal, technical andinstitutional context, they are shareholding companies. The previous progress reports devoted attention on anassessment of the model.3 In fact, the concept of the RMF was not complicated and a similar concept has been successfully implementedin the Akwandze Finance scheme in Mpumalanga. However, the sugar industry in <strong>Swaziland</strong> consists ofvarious interest groups, particularly smallholder and medium-large scale growers. The RMF would havemainly benefitted small growers.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 15


Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionwith different levels of grant assistance.Assessment of a primary seed cane scheme: the reportconfirmed having a financially and technically viable seed canescheme in the lowveld could lead to significant transportation costreductions for seed cane.No problems encountered.The proposal to have a CHP jointly owned by stakeholders fromthe sugar industry and a private utility should be discussed at ahigher political level in <strong>Swaziland</strong>.No issues requiring urgent attention.3 . 3 R 1 A 3 : S u p e r v i s i n g a n d m o n i t o r i n g o fc o n s u l t a n t s a n d c o n t r a c t o r s f u n d e d b y t h eA M S P3 . 3 . 1 AAP 2 0 0 6 , A A P 2 0 0 7 , A A P 2 0 0 8 a n d A A P 2 0 0 9Progress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionSee explanations on R 2aA 2.See explanations on R 2aA 2.See explanations on R 2aA 2.See explanations on R 2aA 2.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 16


4 R E S U L T 2 A : E U A C C O M P A N Y I N GM E A S U R E S F O R S W A Z I L A N D A R EC O M M I T T E D A N D I M P L E M E N T E D4 . 1 R 2a A 1 : I d e n t i f y p r o j e c t s i m p l e m e n t i n g M I P2 0 0 7 - 2 0 1 0 a n d M I P 2 0 1 1 - 2 0 1 3 a n d a s s i s t w i t hp r e p a r a t i o n o f t h e P I F , A F , F A , T A P4 . 1 . 1 A A P 2 0 0 9 : S u p p o r t t o s m a l l h o l d e r c a n e g r o w e r s( S O 1 ) , d i v e r s i f i c a t i o n ( S O 4 ) a n d N A Scoord i n a t i o n .Progress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe signing ceremony of the FA 2009 with press and mediacoverage on the 13th April 2010.No problems encountered.No recommendations.No issues requiring urgent attention.4 . 1 . 2 AAP 2 0 1 0 R o a d T r a n s p o r t I n f r a s t r u c t u r eProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionBased on the results of the traffic count study, the <strong>RDMU</strong>developed in close cooperation with EU, the AF, TAP and FA.Not applicable.It can be expected that the MEPD and the EU will sign the FA inJan/Feb 2011.Not applicable.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 17


4 . 1 . 3 AAP 2 0 1 1 S w a z i l a n d A c c o m p a n y i n g M e a s u r e s f o rS u g a r 2 0 1 1 - I m p r o v i n g t h e c o m p e t i t i v e n e s s o ft h e s u g a r i n d u s t r yProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodThe <strong>RDMU</strong> assisted EU and MEPD in developing PIF, AF andTAP until end of the reporting period. Comments and questionsraised by the Quality Support Group (QSG) were incorporated.The AAP 2011 will accomplish the following results:1. NAS coordination is improved and implementation of EUfunds under the AMSP is accelerated. The main activity willbe providing technical assistance (TA) to MEPD - thecontracting authority – and key sugar institutions.2. Transport infrastructure is improved leading to a reduction inthe cost of hauling sugar cane to the mills. Activities willsupport the finalisation of the four infrastructure projects thatwere designed under MIP 2007-2010.3. The productivity and efficiency of small and medium scalesugarcane growers is improved. Activities will increase thehectarage of cane under irrigation by small and mediumgrowers but also increase yields of existing growers. Inaddition, they will encourage a more efficient use of water,better harvest logistics and bulk input purchasing. Activitieswill include; i) preparing land and installing irrigation systemson an additional 2,000 hectares for new entrants; ii)establishing, managing and replanting sugar cane crop; iii)constructing and rehabilitating bulk irrigation structures; iv)improving logistics in the sector and; v) capacity building infarming techniques, business management and cross cuttingissues.4. The provision of social services in the sugar belt is improved.The project will support limited direct activities which willfocus on rehabilitating school facilities in the sugar belt.However it will also encourage innovative solutions for localdevelopment benefiting the wider community. For example,growers who receive EU grant funding could contribute partof their annual revenues into a community fund, which wouldthen be used to help the community achieve the MDGs.Result 1 will be implemented by service contracts; result 2 byworks contracts and service contracts for works supervision;while results 3 and 4 will be implemented under the EU SwaziSugar Facility (SFF), which will award grant contracts following aCall for Proposals.No problems encountered.The AAP 2011 includes a budget of € 20 million for the <strong>Swaziland</strong>Sugar Facility (grant). The NAS stakeholders in <strong>Swaziland</strong> are notvery familiar with proposal writing and also not with themanagement of grant contracts. Significant training in both needsto be rendered by EU/MEPD supported by the NAS TA team(former <strong>RDMU</strong>).<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 18


Issues requiring urgentattentionNo issues requiring urgent attention.4 . 2 R 2 A A 2 : A s s i s t E U a n d M E P D i n t h e t e n d e rp r o c e s s , c o n t r a c t m a n a g e m e n t a n dm o n i t o r i n g & g u i d i n g o f c o n t r a c t o r s4 . 2 . 1 AAP 2 0 0 6 : F i n a l D e s i g n o f I n f r a s t r u c t u r e s N o r t hProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionPreliminary designs were submitted by NOD in February 2010.The <strong>RDMU</strong> organised a preliminary design workshop and fieldtrip for NAS stakeholders.NOD submitted the draft final design report in May 2010 and drafttender documents for the Mananga-Sihhoye Road in July andDecember 2010.The Final Detailed Design Report for the Mananga – SihhoyeRoad was submitted by NOD in December 2010.The Final Design Report for the Dvokolwako – Manzana Roadwas submitted by NOD in December 2010.The <strong>RDMU</strong> was heavily involved in commenting and verifying theabove documents. Moreover, the <strong>RDMU</strong> spent considerable timeguiding, supervising and monitoring NOD. Over and above all,considerable time was devoted to reviewing timesheets, invoicesand auditor‟s reports.In parallel, the <strong>RDMU</strong> has started coordinating the process ofland acquisition for the North (identification, assessment ofcompensation and negotiation with the affected parties).Considerable discussion was devoted to the price revisionformula and it took 3 months to agree on the key parameters ofthe formula. The tender document has not been finalised yet andit is expected that the final EU approval of the tender documentwill be completed in April/May 2011.Continuation of the land acquisition process aiming to finalise theprocess by mid May 2011The intention is that the two infrastructure tenders (North andSouth contract 1) will be launched in two lots at the same time.Therefore, the tenders need to be launched latest July 2011 giventhe tight deadline with the expiry of the FA 2008. Therefore, allactivities centred around the land acquisition process need to befinalised and agreed in written form with the affected parties inMay or early June 2011.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 19


4 . 2 . 2 AAP 2 0 0 7 : S u p p o r t t o s m a l l h o l d e r c a n e g r o w e r sProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)<strong>RDMU</strong> organised the evaluation committee meeting for the EURound 3 Tender. Support in the development of business plansfor the EU Round 4 Tender. As in the previous reporting periods,the <strong>RDMU</strong> was heavily involved in the checking and correction ofinterim payment certificates for the two contractors for the EURound1 tender. The <strong>RDMU</strong> assisted in the evaluation of the EURound 2 and 3 tenders. EU Tender 2 irrigation works waslaunched in January 2010 whereas EU tender 3 irrigation workswas launched in July 2010.EU Tender 1: all irrigation schemes at LUSIP (IRRICON) werecompleted and commissioned in August 2010 (398 ha) and thesugar cane planting process was finalised by the end of October2010. The final invoice has been tabled for the EU and MEPD toreview. Irricon might face a penalty due to late provisionalacceptance of some of the schemes.Ingcayizivele (SII) faced several problems partly with nonavailability of seed cane in conjunction with technical problems inthe irrigation installation. Planting started in November, howeverdid not finish. In parallel, the contractor is facing a penalty fordelays for which he is responsible.EU Tender 2 (861 ha): Contract was awarded at the end ofAugust to S&B and signed on the 22nd October 2010 for 861 ha.The first activities such as bush clearing will start end of January2011.EU Tender 3 (296 ha): The tender opening was on the 28thSeptember 2010, the contract will be awarded and signed withS&B before Christmas 2010 The <strong>RDMU</strong> assisted in theevaluation of the bids. It is expected that the first activities willstart in February 2011.As in the previous reporting period, the <strong>RDMU</strong> was heavilyinvolved in the checking and correction of interim paymentcertificates for the two contractors for the EU Round 1 tender.The <strong>RDMU</strong> undertook a state-of-the art financial analysis of someof the EU supported farmer associations of EU Round 1 and 2tailored for each specific situation catering for tender prices,actual electricity cost and ratoon replacement. The generalfindings indicated that smallholder cane cultivation is principallyfinancially not unviable. Sales of cane trash and participation inFairtrade sugar would significantly boost the viability of thesmallholder sugar cane growing and could lead towardssustainability of smallholder sugar cane growing organised inshareholding companies.The <strong>RDMU</strong> started to do more monitoring on the capacity buildingand training component of the SHIP contract. Training has beenconducted in several areas (see the SHIP progress report).However, the most promising training which has been rendered tothe farmer associations, particularly the agricultural (farm)managers of the FAs, is a training programme provided by<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 20


Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionUbombo. This is on a 6 week basis where the basic andfundamental aspects of managing a sugar cane farm by trainingon the job has been provided. Since June 2010, about 25 farmmanagers from the farmer associations have been trained.Experience in sugar cane smallholder development in <strong>Swaziland</strong>has shown that pursuing the current farm (SWADE) model, landconflicts in the shareholding companies have become verycommon. In our opinion, these land conflicts are mainly attributedto negligence in the mobilisation and demarcation process of theshareholding companies. A participatory land delineation anddemarcation where all irrigation blocks are demarcated in closecollaboration with the beneficiaries has never been undertaken.This, is however, essential for ensuring that right from thebeginning beneficiaries know the borders of their schemes. Thefrequency of the land conflicts might lead to the conclusion thatmany of the schemes are developed on the drawing board withminimal attention to the field situation.The development of sugar cane farms through EU assistance isexpensive and takes a long time as compared to the privatesector development. Ubombo, for instance, in 2010 developed500 ha of sugar cane within 4 months (1/3 of the time EUsupported associations require) with total development costamounting to less than 50,000 Emalangeni per ha which is lessthan 60 % of the land development cost of the EU supportedFAs 4 .SWADE which is principally responsible for the mobilisation anddemarcation of the schemes is very resistant towards acceptingadvisory services and capacity building. This need to beimproved.It has also now been realized that the monitoring system forsmallholder development needs significant improvement,particularly for the development of new entrants. The MEPDsupported by the NAS TAs will develop a monitoring andevaluation system to be discussed in the NAS WG.No urgent issues requiring attention.4 . 2 . 3 AAP 2 0 0 8 : T r a n s p o r t I n f r a s t r u c t u r eProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)The <strong>RDMU</strong> organised the preliminary design workshop and fieldtrip. The <strong>RDMU</strong> reviewed several reports submitted by Aureconand commented on them.The Tender Document on the upgrading of Siphofaneni-St.Phillips Road (Draft 2) was submitted in December 2010. Thisversion is currently under review. This tender (contract 1) consistsof the upgrading of the link road, plus the road from St. Phillips till4 Statement by the outgrower department manager of Ubombo<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 21


Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionkm 11 (from Siphofaneni). Contract 2 comprises the rest of the St.Phillips road plus Siphofaneni Bridge and Mhlatuzane Bridge.The final report on the environmental and social impactassessment of the Siphofaneni- St. Phillips road was submitted inSeptember 2010. Comments from the <strong>Swaziland</strong> EnvironmentalAuthority are now due.The <strong>RDMU</strong> together with the major stakeholders has started theprocess of land acquisition by developing an indicative landacquisition plan and initiating major stakeholder consultation. It isexpected that by end of May 2011, the land acquisition andcompensation process will be agreed upon and finalised.The <strong>RDMU</strong> assisted Aurecon in the whole process of developingthe contract addendum for splitting the tender documents and toinclude the final design of the Mhlatuzane Bridge. The contractaddendum was signed in August 2010 and the total amount of thecontract is € 685,325 (as compared to € 570,803). The contractperiod was extended to 36 months.The current government budget does not allow compensation atthe moment. Therefore, it is proposed to agree with the affectedparties to postpone compensation for a later period.Finalisation of the land acquisition plan and launch of the workstender (contract 1).The preliminary design report on the proposed Mhlatuzane Bridgewill be submitted in January 2011. The <strong>RDMU</strong> will assist MEPDand MoPW&T to review the documents.Since the contract with the successful bidder for the workscontract (contract 1) needs to be signed prior to Christmas 2011,the tender must be launched latest mid July 2011. The tender,however, can only be launched if all affected parties and GoShave agreed on the compensation. This in turns makes itnecessary that the land acquisition process has to be finalisedlatest by the end of May 2011 which will be difficult to accomplish.This will be aggravated by the fact that GoS currently does nothave any means of making compensation payments due to thecurrent fiscal crisis.4 . 2 . 4 AAP 2 0 0 9 : S u p p o r t t o s m a l l h o l d e r c a n e g r o w e r s ,a g r i c u l t u r a l d i v e r s i f i c a t i o n a n d N A Sc o o r d i n a t i o nProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)SCGA GrantAssisted by an STE, the <strong>RDMU</strong> developed: the grant contractproposal for the SCGA; eligibility criteria; a manual onprocedures; and application documents for those who wish to getsupport from the SCGA grant.The <strong>RDMU</strong> long-term staff members finalised the analysis of thediversification survey and the report on the diversification surveyin December 2010.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 22


In several meetings between SCGA, EU, MEPD and <strong>RDMU</strong>, theproposal for the grant contract was amended and sent to EU F&CLesotho for review and approval. As of the end of the reportingperiod, the SCGA grant contract had not been signed.Bulk Irrigation<strong>RDMU</strong> drew up supporting documentation for the three proposedbulk irrigation schemes, including detailed financial and economicanalysis, which are earmarked for being funded by AAP 2009. Allproposed projects are financially and economically viable.The <strong>RDMU</strong> started elaborating the tender document for a servicetender for the final design and supervision of the bulk waterirrigation schemes. Unfortunately, due to limited resources, the<strong>RDMU</strong> could not finalise the tender document as anticipated (theEU template for design and supervision contracts also changed inNovember 2010 and the whole tender document had to bedeveloped anew).Carbon-related activitiesThe finalized PDD has been submitted for validation. Because ofUbombo specific project features, the PDD had to besupplemented by 2 “Requests for Deviation”. The validation hasstarted and the PDD has been published on the UNFCCCwebsite. The on-site validation could be in March / April 2011.NAS CoordinationThe day the <strong>RDMU</strong> service contract expired (13 th December2010), the new addendum with an additional contract value of €950,000 was signed between the EU and the consortiumGFA/ULG/Harewelle. The contract period was extended to 59months, until 13 December 2012. The <strong>RDMU</strong> team will be fullyintegrated into the MEPD/ACMS and will have a pure technicalassistance role for the implementation of the NAS.Bulk input procurement systemInteresting to note is that while the sugar industry was busycommenting on the above report prepared by Richard Bates,Ubombo established a memorandum of understanding betweenUbombo and Swazibank to implement the bulk input procurementsystem where Swazibank agreed that Ubombo is allowed todeduct the input cost from the farmers proceeds prior to thecession (loan repayment) to which Swazibank is entitled.FairtradeA pre-audit on a number of farmer associations was conducted byFlow-Cert at the beginning of December. The pre-audit wasfunded by Cadbury and transport was provided by the <strong>RDMU</strong>.The latter identified non conformities (governance model,prohibited materials, labour conditions, gender and HIV-tests) inthe current operations. With the exception of those individualmembers and associations which do not adhere to the FLOdefinition of small producers, none of the findings representinsurmountable barriers to achieve Fairtrade certification.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 23


Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionTherefore, it was suggested that most of the non conformities canbe addressed prior to the audit within a relatively short time.SCGA GrantThe recruitment process for the SCGA grant project managerstarted in October 2010. Unfortunately, no appropriate candidatehad been found at the end of the reporting period. It is suggestedthat the vacancy advertisement be published in the major SouthAfrican newspapers.Smallholder Irrigation New EntrantsSeveral land conflicts, less availability of suitable land,inadequate capacity of SWADE in developing designs andbusiness plans and upcoming changes of the composition of theSHIP personnel contributed to significant delays. At the end of thereporting period, neither business plans nor any design has beendeveloped for EU Round 4.GRM International (consultant implementing the SHIP) wasrequested by the EU to replace the team leader. It is anticipatedthat towards the end of the second quarter of 2011, a replacementwill take over the job. Just before the end of the reportingperiod, the business management expert of SHIP resigned forhealth reasons. Despite this change of personnel, we do notexpect major bottlenecks with the tasks undertaken by SHIP.Detailed allocation of AAP 2009Several NAS WG and NAS SC were organised to agree on thefinal allocation of the AAP 2009 funds. There was a bias amongthe various members of the sugar industry in the allocationsbetween new entrants and existing growers.It is envisaged that the SCGA grant contract will be finalised andsigned in the first quarter of 2011. The recruitment process for thetwo positions (finance / procurement person and the projectmanager) needs to be finalised before the end of April 2011. TheSCGA grant contract contains a condition that the two positionsneed to be filled prior to the first disbursement.Developing business plans and designs for EU Tender 4 in Apriland May 2011 to make sure that, at least for the major activitiesduring works implementation, SHIP will be in a position to act assupervisor (the SHIP contract expires in May 2012).The service tender document for the design and supervision ofthe bulk irrigation infrastructure should be finalised in the firstquarter allowing us to launch the restricted tender in the secondquarter of 2011.See under recommendations.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 24


Details of the carbon-related activities1. The finalized PDD (Project Development Document) has been submitted for validation.Because of Ubombo specific project features, the PDD had to be supplemented by 2“Requests for Deviation”. A “Request for Deviation” is a CDM-specific procedure thatseeks the approval by the CDM Executive Board to deviate from the CDM baseline andthe monitoring methodology applied in the PDD.2. One Request for Deviation is to ask for the approval of a different definition of the term“historic”. Usually historic describes the most recent three years before the project starts.For Ubombo this makes no sense since during the most recent three years they had atrial phase on cane trash and the baseline situation, i.e. the situation without introducingcane trash as a new source of renewable biomass, would be biased.3. One Request for Deviation is to ask for the approval of a parallel execution of demandsideand supply-side implementation of energy efficiency measures. This is usually notallowed by the CDM-methodologies due to impossible, parallel monitoring of bothmeasures.4. The validation is started by the DOE (Designated Operational Entity) (in our case TÜVSüd from Germany) by publishing the PDD for a 4-week-long Global StakeholderProcess (GSP). In this context the PDD has been published on the UNFCCC homepage:http://cdm.unfccc.int/Projects/Validation/index.html Search engine criteria “Title:” type in“Ubombo”.5. Simultaneously to the GSP, the PDD will be reviewed by the DOE and clarificationrequests, if any, will have to be answered by us.6. The on-site validation could be March/April.7. Once validated, the PDD and the validation report will be submitted to the national DNAs(Designated National Authority) of <strong>Swaziland</strong> and South Africa seeking national approvalin the form of a LoA (Letter of Approval). The DNAs were already informed by us aboutthe plans to ask for national approval.8. The annual average emission reduction has been calculated to be 113,883 tons of CO 2with an approximate equivalent of 1,140,000 Euro per annum.4 . 2 . 5 AAP 2 0 1 0 : T r a n s p o r t I n f r a s t r u c t u r eSee details under AAP 2006 (NOD), page 19 (Infrastructure North).<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 25


4 . 3 R 2A 3 : A S S I S T E U A N D M E P D I N T H ED E V E L O P M E N T O F T H E M I P 2 0 1 1 – 2 0 1 3Progress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe <strong>RDMU</strong> assisted the EU in drawing up the MIP 2011-13document. Some stakeholders complained that they were notadequately given the opportunity to review the document and toendorse it. Subsequent to that, a revision of the document wasdone by the EU and stakeholders consulted. The final version wassent to EU headquarters in December 2010. In parallel, thestakeholders were informed that the final allocation amounts to€ 54.267 million.No problems encountered.It can be expected that the MIP 2011-2013 will be signed in thethird quarter of 2011.No issues requiring urgent attention.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 26


5 R E S U L T 2 B : I M P L E M E N T A T I O N A N DF I N A N C I N G O F O T H E R N A S A C T I V I T I E SF A C I L I T A T E D5 . 1 R 2b A 1 : A s s i s t a n c e t o M E P D i n e f f o r t s t os e c u r e d o n o r s i n t e r e s t s i n t h e N A SProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe PDD was finalised in line with the old baseline methodology.However, in order to assist Ubombo to benefit from carboncredits, energy efficiency measures and fuel switch, the <strong>RDMU</strong>requested the UN to change its methodology for the baselinescenario. In parallel, the <strong>RDMU</strong> liaised with several power utilitiesfrom Europe which might be interested in buying the carboncertificates.No problems encountered.The <strong>RDMU</strong> team will be integrated in the ACMS of MEPD. TheTA team will assist MEPD in developing an overall resourcemobilisation plan. Mentoring of Ubombo in the validation processwill continue.No issues requiring urgent attention.5 . 2 R 2b A 2 : A s s i s t i n f a c i l i t a t i n g d o n o r m e e t i n g st o f o c u s d o n o r s ’ s u p p o r t a n d t o a v o i dd u p l i c a t i o n o f e f f o r t sProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsIn the absence of bankable projects, no donor conference hasbeen organised. No progress on the economic diversification studyin <strong>Swaziland</strong> to be funded by the AfDB.Apart from AMSP funded projects, there are no other bankableprojects in the pipeline. It has to be noted that the AMSPcomprises activities amounting to approximately € 120 million.Given the limited resources of the <strong>RDMU</strong> in conjunction with lackof suitable EU procedures for the large number of proposedprojects, it is of utmost importance to develop projects which canbe relatively easily funded by the EU without endangering furtherreductions of the allocation for <strong>Swaziland</strong>.As highlighted in the previous reports, <strong>Swaziland</strong> does not belongto the poorest 50 countries, and therefore, support frominternational donors is very limited, particularly for grant funding. Inparallel, many donors have so called focal countries in which theywork. These are usually more needy countries with bettergovernance systems.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 27


Recommendations&activities for comingreporting periodIssues requiring urgentattentionDonors will be approached depending on the availability ofbankable project proposals.Any donor mission in <strong>Swaziland</strong> will be approached and briefed onthe NAS.No issues requiring urgent attention.5 . 3 R 2 bA 3 : D e v e l o p a v i s i b i l i t y a n dc o m m u n i c a t i o n s t r a t e g y a n d d i s s e m i n a t eb r o c h u r e s a n d l e a f l e t sProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe <strong>RDMU</strong> developed the first <strong>RDMU</strong> newsletter anddisseminated it among the stakeholders in May 2010. The <strong>RDMU</strong>website has been continuously updated. <strong>RDMU</strong> writing pads wereproduced and disseminated. Due to high demand, another batchof <strong>RDMU</strong> cricket hats, mugs and umbrellas were produced anddistributed.No problems encountered.Occasional update of the <strong>RDMU</strong> website with importantinformation. No other major activities have been planned sincethe <strong>RDMU</strong> closed down and the incidental budget for theextension phase is very low. Any visibility activity now has to befunded from the Programme Estimates managed by the MEPD.No issues requiring urgent attention.5 . 4 R 2 A 4 : O r g a n i s e p r e s s c o n f e r e n c e s , r a d i oa n d T V s p o t s o n t h e N A S a n d t h e M I PProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe <strong>RDMU</strong> Agriculturalist was presenter of a radio spot giving abriefing on the NAS.The Signing ceremony of the FA 2009 was organised by the<strong>RDMU</strong> with press coverage in March 2010.No problems encountered. However, it has to be noted that anyfuture visibility activity needs to be funded from the programmeestimate managed by the MEPD.It is proposed to have the signing ceremony of FA 2010 withpress covered in the first quarter of 2011.It is planned to have the official launch of the SCGA grantcontract covered by the print media.No issues requiring urgent attention.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 28


6 R E S U L T 2 C : A M O N I T O R I N G A N DE V A L U A T I O N S Y S T E M F O R T H E N A SE S T A B L I S H E D A N D I N O P E R A T I O N6 . 1 R 2c A 1 : D e s i g n a n M & E s y s t e m f o r t h e N A Sa n d a s s i s t w i t h i t s i m p l e m e n t a t i o nProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionIn April the <strong>RDMU</strong> developed a revised NAS logframe andelaborated an M&E framework. The M&E for the NAS is designedwith milestones as indicators which will be updated on a yearlybasis with the proposed cut off date being October each year.Inputs from the various NAS stakeholders is required.Like all multi-stakeholder M&E systems, a lot of discipline isrequired to continuously update the system. Another problem isthat some of the data are considered as confidential by the sugarindustry such as sugar production cost / ha, and hence, it isdifficult to obtain the necessary figures.It has been realized that the M&E system for the smallholderirrigation development component needs to be improved. The TANAS team will develop a suitable monitoring tool to be applied bySHIP.Continuous update.No issues requiring urgent attention.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 29


7 R E S U L T 3 : G O V E R N M E N T A N D D O N O RL I A I S O N F A C I L I T A T E D7 . 1 R 3 A 1 : I d e n t i f y i n g a n d a p p r o a c h i n g d o n o ra g e n c i e s , t a i l o r i n g i n v e s t m e n t / i n t e r v e n t i o np a c k a g e s f o r t h e v a r i o u s d o n o r a g e n c i e s a n df o l l o w u pProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionSee activities under R 2 b A 2.See activities under R 2 b A 2.See activities under R 2 b A 2.See activities under R 2 b A 2.7 . 2 R 3 A 2 : O r g a n i s a t i o n o f m u l t i - d o n o rc o n f e r e n c e sProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionNothing planned in the reporting period.No problems encountered.Nothing particular foreseen in the reporting period.No issues requiring urgent attention.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 30


8 R E S U L T 4 : S T A K E H O L D E R L I A I S O NM E C H A N I S M S A R E E S T A B L I S H E D A N D I NO P E R A T I O N8 . 1 R 4 A 1 : O r g a n i s e w e e k l y p l a n n i n g m e e t i n g sw i t h M E P DProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionThe <strong>RDMU</strong> has met MEPD at the weekly Monday meetingsthroughout the reporting period. Moreover, many ad hoc meetingshave been organised to discuss important issues.From January 2011 onwards, the <strong>RDMU</strong> will be fully integrated inthe Aid Coordination and Management Section (ACMS) of MEPDand this activity can be dropped.The <strong>RDMU</strong> proposes that more meetings between MEPD and theline ministries should be organised. In our opinion, the ownershipof the MoPW&T with regard to transport infrastructures for theAMSP could be increased.No issues requiring urgent attention.8 . 2 R 4 A 2 : O r g a n i z e N A S S C a n d N A S W GProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattention5 NAS SC meetings held.25 NAS WG meetings held.No problems encountered.To be continued as planned and needs arise.No issues requiring urgent attention.8 . 3 R 4 A 3 : S i t e v i s i t s w i t h t h e m a j o rs t a k e h o l d e r s / N A S W GProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)With the preliminary design report at the beginning of March 2010,the <strong>RDMU</strong> invited the various stakeholders on a tour, with thedesign engineers, to the two project areas.Members of parliament were invited to visit the areas where theNAS is physically intervening. The two day field trip was organised<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 31


Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionby the SSA and partially funded by the <strong>RDMU</strong>.One EU quality support group member was invited to visit theirrigation development areas.No problems encountered.To be continued as planned and needs arise.No issues requiring urgent attention.8 . 4 R 4 A 4 : C o n d u c t f i e l d S u p p o r t a n d p e r f o r mc a p a c i t y b u i l d i n g o f s t a k e h o l d e r sProgress achievedduring reporting period(01 Feb 2010-13 Dec 2010)Problems encounteredand possible solutionsRecommendations &activities for comingreporting periodIssues requiring urgentattentionIn March 2010, the <strong>RDMU</strong> organised a one week training courseon EU works contracts, EU service contracts, EU grant contractsand on PCM. The training provider was MDF from Brussels.In April and June, the <strong>RDMU</strong> funded the training of 5 techniciansfrom SWADE, MoA and <strong>RDMU</strong> on a course for irrigation designand implementation organised by the South African Institute ofIrrigation (SABI).15 NAS stakeholders went to Zambia for a study tour on Fairtradeand smallholder development in August/September 2010.No problems encountered.An AMSP sugar conference is planned in Tanzania for March2011. It is envisaged that several stakeholders from <strong>Swaziland</strong>will participate in this conference.No issues requiring urgent attention.<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 32


9 C U R R E N T S T A T U S O F T H E R D M UP R O J E C T O N T H E B A S I S O F P E R S O ND A Y S U S E D9 . 1 O v e r v i e w o f i n p u t s o f e x p e r t s s i n c e p r o j e c ts t a r tTable 1 shows that the project managed to perform 126.2 (76 international) work months outof 132 (77.5 international) possible work months. In other words, 95% of the short termexpert months that could be used for important assignments. Annex 3 gives details on allassignments. In total, the <strong>RDMU</strong> employed 66 short-term experts.Table 1:Work days performed during the whole contract periodPositionwork days work daysavailable workedwork days leftCivil Engineer 200 200 0Irrigation Engineer 229 229 0Renewable Energy Expert(s) 200 200 0Agriculturalist 193 193 0Business Management 177 177 0Environment 46 46 0Additional International Short-term Experts 660 634 26Additional local Short-term Experts 1,200 1,097 103Total work days all 2,905 2,776 129Total work months all 132.0 126.2 5.9Total work days international 1,705 1,679 26.0Total work months international 77.5 76 1.2<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 33


9 . 2 O v e r v i e w o f t h e f i n a n c i a l s t a t u s o f t h e R D M U c o n t r a c t s i n c e p r o j e c t s t a r tTable 2:Financial status of the <strong>RDMU</strong> contract since project startBudget according to contract (includingreallocation)Expenditure in reporting period(01 Aug 2010 - 13 Dec 2010)Cumulative expenditures untilreporting periodBalance avaliableNumber ofwork daysFee rate (€per work day)Amount €Number ofwork daysAmount €Number ofwork daysAmount €Number ofwork daysAmount €FEES (including overheads):Long-term expertsKey Expert 1: Team Leader 668 1,425 951,900 74 105,450 592 843,600 2 2,850Key Expert 2: Finance Manager 625 1,225 765,625 44 53,900 572 700,700 9 11,025Expert 9 (Local): Agriculturalist 688 299 205,712 84 25,116 604 180,596Expert 10 (Local): Economist 678 327 221,706 80 26,160 598 195,546Short-term expertsExpert 3: Civil Engineer 200 1,105 221,000 22 24,310 178 196,690Expert 4: Renewable Energy Expert 200 841 168,200 8 6,728 192 161,472Expert 5: Agriculturalist 193 507 97,851 193 97,851Expert 6: Irrigation Expert 229 583 133,507 29 16,907 200 116,600Expert 7: Business Management Expert 177 733 129,741 26 19,058 151 110,683Expert 8: Environment Expert 46 684 31,464 46 31,464Additional International Experts 660 664 438,240 96 63,744 538 357,232 26 17,264Additional Local Experts 1,200 178 213,600 181 32,218 916 163,048 103 18,334Total fees (including overheads) 3,578,546 373,591 3,155,482 49,473PROVISION FOR INCIDENTAL EXPENDITURE: 196,212 39,186 119,000 38,026PROVISION FOR EXPENDITURE VERIFICATION: 15,000 7,500 7,500MAXIMUM CONTRACT VALUE 3,789,758 412,777 3,281,982 94,999<strong>RDMU</strong> Progress Report No. 6 - Third Annual Report (01 Feb – 13 Dec 2010) Page 34


Annexes


Annex 1<strong>RDMU</strong> logical framework (revised version No. 4)


Logical Framework for the <strong>RDMU</strong> (new format for extension phase version No. 4)Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDINTERVENTION LOGICOverall Objective Objectively Verifiable Indicators (OVI) Source of verification AssumptionsTo contribute to<strong>Swaziland</strong>’s adaptation tothe EU Sugar MarketReformMill Groups remain profitable & engine of sugar canedevelopment.Quantities and value of sugar processed in <strong>Swaziland</strong>increased by 5 % between 2006 and 2013.Smallholder growers within an economically viabledistance from the mill remain in sugarcane, and areprofitable.Farmers who are no economically viable andprofitable in sugar have diversified into alternativecrops, profitably.SSA Reports and SugarMarket StatisticsSGCA ReportsBaseline Survey ofFarmer AssociationsGoS Reports andStatisticsPurpose OVI Source of verification AssumptionsMEPD supported in theimplementation andcoordination of the NAS30 out of 60 NAS strategic response measures havebeen converted into actionable projects andprogrammes by the end of 2010.20 NAS measures have started or have beenimplemented by the end of 2010.€ 100 million worth of projects have been committedby 2010 out of € 360 million earmarked for the NAS.Project or Programmedocuments prepared by<strong>RDMU</strong> and GoS.Joint Annual ReviewDonor Progress Reports,MTR ReportsGlobal market for sugar stableLogframe for Restructuring and Diversification Management Unit – Page 1


Results OVI Source of verification AssumptionsResult 1: <strong>RDMU</strong> establishedand managedResult 2 A: EUAccompanying Measures for<strong>Swaziland</strong> are committedand implementedResult 2 B: Implementationand financing of other NASactivities facilitatedResult 2 C: A monitoringand evaluation system forthe NAS establishedStaffing of <strong>RDMU</strong>.Existence of visibility indicators (radio, brochures,newsletter).M&E for AMSP and NAS system in place andoperational.Annual Action Programmes (AAP 2008, 2009 and2010) of AMSP funds for <strong>Swaziland</strong> are approved andimplemented according to the various deadlines.AAP2007: TA contract awarded beginning of 2009;works tenders for irrigation equipment launched in2009 and 2010, AAP 2007 funds fully contracted bythe end of 2010.AAP 2008: Road and bridge design & supervisioncontracts awarded in first half of 2009; Phase 1 Roadand Bridge construction contracts awarded by the endof 2010.AAP 2009: Some component(s) of AAP 2009 (SCGAGrant Contract) signed before end of 2010.MIP 2011-2013 developed and approved before endof 2010.At least two other donors contribute up to € 20m tothe NAS by 2010.Necessary documentation established by the end of2009 and carbon credits valued at € 5m are sold onthe market by the end of 2011.System agreed with stakeholders and results used asbasis for decisions by NAS SC and WGs.Progress ReportsOutputs related tovisibilityNAS Steering Committeeand NAS Working GroupminutesCRIS<strong>RDMU</strong> progress reportJARContracts<strong>RDMU</strong> reports.Project ReportsContractor Reports andInvoicesContractsProject ReportsMinutes of MeetingsProceedings, DonorReportsMinutes of NAS SC andNAS WGStakeholder ReportingMatrixEnabling environment in whichthe <strong>RDMU</strong> can work.GoS and other stakeholderscommitted towards project.EU and MEPD officialsavailable for process follow-up.Implementing partners andcontractors fulfil theircontractual obligations.EU makes available more fundsfor 2011-2013.Current credit crunch does notreduce the availability of donorfunds.Industry continues to haveaccess to finance on the capitalmarket.Major stakeholders participateactively in the development andupdate of the M&E system.Logframe for Restructuring and Diversification Management Unit – Page 2


Results OVI Source of verification AssumptionsResult 3: Government andDonor Liaison facilitatedMulti-donor conference organised.Donors and potential investors visited <strong>Swaziland</strong>.Aide memoires withdonorsProgress Reports<strong>Swaziland</strong> has an enablingenvironment for foreign directinvestment.Current donors continue tosupport <strong>Swaziland</strong>.Result 4: Stakeholder liaisonmechanisms are establishedand in operation.At least 5 NAS SC organised per year.70 % of major stakeholders participate in NAS WGand workshops every year until 2010.At least 8 brochures developed and 4 radio/ TV spotsbroadcasted by the end of 2010.At least 2 study tours organised and 4 formal trainingsorganised.Minutes of NAS SC andNAS WGParticipation listsRadio/ TV programmesMajor stakeholders aremotivated and committed in theidentification, formulation andimplementing of the NAS.Logframe for Restructuring and Diversification Management Unit – Page 3


Activities to achieve the ResultsResult 1: <strong>RDMU</strong> established and managedR 1A 1 Staffing of <strong>RDMU</strong> according to needsR 1A 2 Undertaking technical and economic studies related to the NAS implementationR 1A 3 Supervising and monitoring of consultants and contractors funded by the AMSPAssumptionsService contract with GFA signed.Addendum 1 (extension) of servicecontract with GFA signed.Fluctuation of <strong>RDMU</strong> personnelminimized.Result 2 a: EU Accompanying Measures for <strong>Swaziland</strong> are committed and implementedR 2aA 1R 2aA 2Identify projects implementing MIP 2007 -2010 and MIP 2011-2013 and assist with preparation of the PIF, AF,AAP, FA, TAPAssist EU and MEPD in: development of tender documents, launch and evaluate tenders, preparing contracts,supervision, monitoring and guidance of contractors according to the AAPs and specific objectivesR 2aA 3 Assist EU and MEPD in the development of the MIP 2011 - 2013Result 2 b: Implementation and financing of other NAS activities facilitatedR 2bA 1R 2bA 2R 2bA 3R 2bA 4Assistance to MEPD in efforts to secure donors notably providing necessary information to potential donors(drawing up strategy on donor liaison, development of bankable projects, conducting field trips)Facilitate donor meetings to focus donor’s support and to avoid duplication of effortsDevelop visibility and communication strategy & and disseminate brochures and leaflets to inform all stakeholdersand donors about the NAS and MIPOrganise press conferences, radio and TV spots on the NAS and the MIPStakeholders, MEPD and EU dulyperform their tasks andresponsibilities without delays.International donor agenciescommitted towards assisting<strong>Swaziland</strong> in implementing theNAS.GoS and local stakeholdersmobilize funds to bridge the gapbetween the NAS cost and the EUand other donors’ fundingcontributions.Result 2 C: A monitoring and evaluation system for the NAS establishedR 2cA 1 Design a M&E system for the NASR 2cA 2 Assist in implementing a M&E system for the NASAll stakeholders contribute activelyin the development,implementation and monitoring ofthe activities.Logframe for Restructuring and Diversification Management Unit – Page 4


Activities to achieve the ResultsResult 3: Government and Donor Liaison facilitatedR 3A 1 Identifying and approaching the major donor agencies;R 3A 2 Tailoring investment / intervention packages for the various donor agencies;R 3A 3 Organisation of multi-donor conferences;R 3A 4 Follow up on donors and particular aspects of donor requests.AssumptionsInternational donor agenciescommitted towards assisting<strong>Swaziland</strong> in implementing theNAS.Result 4: Stakeholder liaison mechanisms are established and in operationR 4A 1 Organise weekly planning meetings with MEPDR 4A 2 Organise NAS SC and NAS WGR 4A 3 Organise site visits with the major stakeholders / NAS WGR 4A 4 Support and perform capacity building of stakeholders enabling them to efficiently contribute to the programmeGoS and local stakeholdersmobilize funds to bridge the gapbetween the NAS cost and the EUand other donors’ fundingcontributions.All stakeholders participate activelyin the development andimplementation of these events.Logframe for Restructuring and Diversification Management Unit – Page 5


Activities and means to accomplish the resultsMEANSCOST in EuroRelated to Result 1Related to Result 2Related to Result 3Related to Result 4Long-term Technical AssistanceShort-term consultanciesStudiesTechnical AssistancePublic Relation MaterialWorkshops and field trips TechnicalAssistanceRadio / TV spotsTechnical AssistanceWorkshops and field tripsTechnical Assistance€ 4,739,733Logframe for Restructuring and Diversification Management Unit – Page 6


Annex 2<strong>RDMU</strong> logical framework with resultsaccomplished until 13 December 2010


Logical Framework for the Restructuring and Diversification Management Unit with accomplishments up to 13 December 2010Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective OVI planned OVI achieved Source of verificationTo contribute to<strong>Swaziland</strong>’sadaptation tothe EU SugarMarket ReformMill Groups remain profitable &engine of sugar canedevelopment.Quantities and value of sugarprocessed in <strong>Swaziland</strong> increasedby 5 % between 2006 and 2013.Smallholder growers within aneconomically viable distance fromthe mill remain in sugarcane, andare profitable.Farmers who are no economicallyviable and profitable in sugar havediversified into alternative crops,profitably.Quantities and value of sugarprocessed in <strong>Swaziland</strong> reduced from2006 to 2008/ 2009 by 2.9 %.Quantity of sugar processed from2006/07 (638,037 tons) to 2009/10(595,143 tons) reduced by 7 %.Average yields of sugar cane perhectare by smallholder decreased from79.5 tons in 2007 to 78.5 tons in 2008.No intervention yet.SSA Reports and Sugar Market StatisticsSGCA ReportsBaseline Survey of Farmer AssociationsGoS Reports and StatisticsLogframe for Restructuring and Diversification Management Unit – Page 1


Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective OVI planned OVI achieved Source of verificationMEPDsupported in theimplementationand coordinationof the NAS30 out of 60 NAS strategicresponse measures have beenconverted into actionable projectsand programmes by the end of2010.14 out of 50 NAS strategic responsemeasures have been converted intoactionable projects and programmes bythe 13 th December 2010 (Note: thereare several duplications among the 60measures. In fact, there are 50measures).1. TA to Smallholder Irrigation Development.2. Irrigation equipment installation.3. AAP 2009 SCGA Grant Contract: Irrigationrehabilitation and diversification.4. SEC approved tariff reduction for smallgrowers.5. Energy efficiency project at Ubombo.6. Design of CHP plants in the sugar belt.7. AAP 2008 and infrastructures in the South.8. Development of the Ratoon ManagementFund.9. Development of an exit strategy onprogramme of diversification.10. Sugar mills provide transport subsidies forlong distance growers.11. Rebate for indebted cane growers fromKDDP.12. EU funded FAO initiative “AgriculturalDevelopment Programme”.13. AAP 2010 Infrastructures North.14. AAP 2011 Balance of Infrastructures Southand North.Logframe for Restructuring and Diversification Management Unit – Page 2


Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective OVI planned OVI achieved Source of verificationMEPDsupported in theimplementationand coordinationof the NAS20 NAS measures have started orhave been implemented by theend of 2010.9 NAS measures have started or havebeen implemented by 13 December2010.1. TA to Smallholder Irrigation Development(started in May 2009).2. Supply and install irrigation equipment on 625ha co-funded by EU and 1,075 ha co-fundedby GoS.3. SEC approved tariff reduction for smallgrowers.4. AAP 2008 and AAP 2010 infrastructures in theSouth and in the North. Final Design finalisedin December 2010.5. Sugar mills provide transport subsidies to longdistance growers.6. Rebate for indebted cane growers from KDDPapproved in July 2009 and partly granted tillJuly 2010 with an indicative amount of E 38million.7. Factory expansion and energy efficiencyproject at Ubombo with € 60 million spent todate.8. Modernisation, increase of bagging capacity,ethanol production at RSSC € 35 million.9. EC funded FAO initiative “ AgriculturalDevelopment Programme” started in mid of2009.Logframe for Restructuring and Diversification Management Unit – Page 3


Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective OVI planned OVI achieved Source of verificationMEPDsupported in theimplementationand coordinationof the NAS€ 100 million worth of projectshave been committed by 2010 outof € 360 million earmarked for theNAS.Approximately € 155 million worth ofprojects have been committed by the13 December 2010 out of the€ 360 million earmarked for the NAS.1. Smallholder Irrigation DevelopmentProgramme (AAP 2007) amounting to€ 14.895 million.2. Support to Transport Infrastructure (AAP2008) amounting to € 18 million.3. Rebate for indebted cane growers from KDDP(approximately € 10 million).4. 1,075 ha irrigation installation at LUSIP KDDPfunded by GoS (€ 2.5 million).5. EC funded FAO initiative “ AgriculturalDevelopment Programme” (€ 14.661 million).6. RSSC and Ubombo investment programmeapproximately € 95 million spent to date andapproximately € 280 committed.Logframe for Restructuring and Diversification Management Unit – Page 4


Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective Objectively Verifiable Indicators (OVI) planned OVI achieved Source of verificationResult 1: EUAccompanyingMeasures for<strong>Swaziland</strong> arecommitted andimplementedAnnual Action Programmes (AAP 2008, 2009 and2010) of AMSP funds for <strong>Swaziland</strong> are approvedand implemented according to the variousdeadlines.AAP2007: TA contract awarded beginning of 2009;works tenders for irrigation equipment launched in2009 and 2010, AAP 2007 funds fully contractedby the end of 2010.€ 18 m committed for AAP 2008 RoadTransport Infrastructure by Dec 2008;€ 16.5 m committed for AAP 2009 by end ofDec 2009; € 12.4 m committed for AAP 2010by end of Dec 2010.SHIP contract signed May 2009, EU Round 1irrigation contracts signed in October andDecember 2009.Works tenders for irrigation equipmentlaunched in 2009 and contracts for 633 ha(EU funded) signed and tender for 865 ha EURound 2 launched in March 2010 and EUTender 3 for 300 ha launched in July 2010.AAP and FA 2008 signedin Dec 2008.AAP 2009 and FA signedend of 2009.AAP 2010 indicativelyapproved but not signed.Contract with GRMInternational (SHIP).Contracts with Irricon andSII.Tenders launched.Works tenders for irrigation equipmentlaunched in 2009 and contract for 482 ha(GoS) awarded to S&B.Contact with S&B.AAP 2008: Road and bridge design & supervisioncontracts awarded in first half of 2009; Phase 1Road and Bridge construction contracts awardedby the end of 2010.Road and bridge design & supervisioncontracts awarded (July / Sept 2009).No contract on construction awarded yet.Commencement of construction in mid 2011.Contract with Aureconand Nicolas O’Dwyer.SCGA grant contract not signed by end of2010.AAP 2009: Some component(s) of AAP 2009(SCGA Grant Contract) signed before end of 2010.MIP 2011-2013 developed and approved beforeend of 2010.MIP 2010-2013 not signed until Dec 2010.Logframe for Restructuring and Diversification Management Unit – Page 5


Restructuring and Diversification Management Unit to coordinate the implementation of the National Adaptation Strategy to the EU Sugar Reform, SWAZILANDOverall Objective Objectively Verifiable Indicators (OVI) planned OVI achieved Source of verificationResult 2:Implementationand financing ofother NASactivitiesfacilitatedAt least two other donors contribute up to € 20m tothe NAS by 2010.Necessary documentation established by the endof 2009 and carbon credits valued at € 5m are soldon the market by the end of 2011.One donor contributes up to € 13m to theNAS by the Dec 2010.PIN developed and approved in May 2009.PDD finalised and amendment ofmethodology for baseline approved by Dec2010. No carbon credits sold.GoS Irrigation tender andGoS rebate.PIN / PDD.Result 3:Stakeholderliaisonmechanisms areestablished andin operation.At least 5 NAS SC organised per year.70 % of major stakeholders participate in NAS WGand workshops every year until 2010.At least 8 brochures developed and 4 radio/ TVspots broadcasted by the end of 2010.At least 2 study tours organised and 4 formaltrainings organised.Since GFA mobilisation 21 NAS SC meetingshave been organised.100 % of the major stakeholders participate inNAS WG meetings and workshops as of the13 December 2010.As of the 13 Dec 2010 one newsletter, 3brochures 4 flyers developed, Website inoperation, 1 radio spot broadcasted.3 study tour organised (Malawi, AkwandzeFinance and Zambia Fairtrade), 3 formaltraining organised.Minutes.Minutes.<strong>RDMU</strong> progress reportsand <strong>RDMU</strong> website.<strong>RDMU</strong> progress reportsand <strong>RDMU</strong> website.Result 4: Amonitoring andevaluationsystem for theNAS establishedSystem agreed with stakeholders and results usedas basis for decisions by NAS SC and WGs.M&E developed and in operation.<strong>RDMU</strong> progress report.Logframe for Restructuring and Diversification Management Unit – Page 6


Annex 3Monitoring list of short-term experts approved andperformed until 13 December 2010


3_Overview.xlsxBalance of work days as committed and approvedPositionwork days work daysavailable workedwork days leftCivil Engineer 200 200 0Irrigation Engineer 229 229 0Renewable Energy Expert(s) 200 200 0Agriculturalist 193 193 0Business Management 177 177 0Environment 46 46 0Additional International Short-term Experts 660 634 26Additional local Short-term Experts 1,200 1,097 103Total work days all 2,905 2,776 12922 Total work months all 132.0 126.2 5.922 Total work days international 1,705 1,679 26.0Total work months international 77.5 76.3 1.2Overview


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentCivil EngineerName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentShaun Finlay PIF preparation, designs 15.04.2008 01.07.2008 40 06.11.2008 22.10.2008 40Robert Geddes AAP Elaboration 20.05.2008 30.05.2008 10 25.05.2008 06.04.2008 10Shaun Finlay Assessment Malkerns Canal 01.10.2008 15.11.2008 27 10.02.2008 16.12.2008 27Shaun Finlay Roads, Transport, Malkerns Canal 15.03.2009 23.06.2009 50 03.04.2008 26.10.2010 50Shaun Finlay Small dam evaluation & screening 20.06.2009 20.07.2009 9 07.01.2009 28.09.2009 9Shaun Finlay Poortzicht Technical Assessment 15.09.2009 30.11.2009 48 10.01.2009 07.02.2010 48Shaun Finlay Review FD reports and tender docs 05.11.2010 13.12.2010 16 25.11.2010 13.12.2010 16Effective daysworkedTotal Amount 200 200Amount according to budget 200 200Still available 0 0Civil Engineer


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentIrrigation EngineerName of EXPERTKind of assignmentIndicative Start ofAssignmentIndicative End ofAssignmentDays requestedRobert G. Bloemers Review of designs, tender docs 25.03.2008 05.05.2008 35Robert G. Bloemers (2. assign) Review of designs, tender docs 25.05.2008 04.07.2008 35Robert G. Bloemers ( extension) Review of designs, tender docs 03.07.2008 13.08.2008 35Johannes de Beer Technical Audit Assocations 10.07.2008 15.12.2009 90Robert Bloemers extension Review of designs, tender docs 20.08.2008 15.09.2008 5Tiekie de Beer Technical Audit Individual Growers 01.08.2010 13.12.2010 29Total Amount 229Amount according to budget 229Still available 0Irrigation Engineer


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignment Renewable Energy Expert(s) Energy Concept, Carbon, CDM and CMSName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentEffective daysworkdPhase 1:Joachim Schnurr Renewable Energy 01.08.2008 30.09.2008 27 09.07.2008 14.10.2008 27Christine Clashausen Bioenergy / CDM 01.08.2008 30.09.2008 32 09.07.2008 14.10.2008 32Richard Koech Agronomist / Sugar Expert 01.08.2008 30.09.2008 20 08.09.2008 10.01.2008 20Christian Schweitzer Engineer Sugar and Ethanol 01.08.2008 30.09.2008 30 09.03.2008 24.09.2008 30Phase 2:Joachim Schnurr Outgrower concept /DNA Expert 01.04.2009 06.05.2009 29 15.04.2009 31.08.2010 29Daniel Blank Bioenergy / CDM / PDD 01.04.2009 26.05.2009 41 07.12.2009 31.08.2010 41Gerald Kapp CDM / DNA 01.04.2009 06.05.2009 21 07.10.2009 31.08.2010 21Total Amount 200 200Amount according to budget 200 200Still available 0 0Renewable Energy


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentAgriculturalistName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentChristopher Forte Longitudinal Survey Malkerns 15.08.2008 09.10.2008 40 15.09.2008 11.07.2008 40Dr Ernst Grenzebach Exit Strategy Cost Divesification 27.08.2008 06.10.2008 35 09.07.2008 18.10.2008 35Rob Sawyer Small Dams Evaluation & Screening 20.06.2009 20.07.2009 6 28.07.2009 19.08.2009 6Mike OGG Small Dams Evaluation & Screening 20.06.2009 31.07.2009 20 07.01.2009 23.11.2009 20Eben Verster Soil Survey Takhamiti Farmer Assoc. 27.07.2009 17.08.2009 12 08.03.2009 18.08.2009 12M. Duerr / M. Ntuli Support to SCGA 01.03.2010 10.04.2010 50 22.03.2010 30.06.2010 50M. Duerr / M. Ntuli Support to SCGA, additional days 22.03.2010 31.08.2010 30 08.06.2010 10.07.2010 30Effective daysworkdTotal Amount 193 193Amount according to budget 193 193Still available 0 0Agriculture


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentBusiness ManagementName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentFolkhard Wohlgemuth Financial Assessment Associations 07.07.2008 15.08.2008 30 07.06.2008 08.10.2008 30Simone Iltgen Financial Assessment Associations 07.07.2008 01.08.2008 20 07.06.2008 30.07.2008 20Dr Richard Bates Ratoon Management Fund 13.10.2008 17.11.2008 25 11.05.2008 24.12.2008 25Paul Goodison Review of the Sugar Industry Strategy 22.03.2009 21.04.2009 18 19.03.2009 04.09.2009 18Dr Richard Bates Ratoon Management Fund: Phase 2 01.05.2009 29.08.2009 58 18.05.2009 31.12.2010 58Dr Richard Bates Centralised input & procurement system 01.09.2010 10.12.2010 26 01.09.2010 30.11.2010 26Effective daysworkdTotal Amount 177 177Amount according to budget 177 177Still available 0 0Business Management


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentEnvironmentName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentRod de Vletter EIA Scoping 20.05.2008 14.07.2008 20 24.05.2008 08.04.2008 20Ara Monadjem EIA Scoping 20.05.2008 14.07.2008 20 24.05.2008 08.07.2008 20Rod de Vletter EIA Scoping 10.03.2009 15.03.2009 3 26.03.2009 31.03.2009 3Ara Monadjem EIA Scoping 10.03.2009 15.03.2009 3 25.03.2009 30.03.2009 3Effective daysworkdTotal Amount 46 46Amount according to budget 46 46Still available 0 0Environment


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentAdditional International Short-term ExpertsName of EXPERTKind of assignmentIndicative Start ofAssignmentINDICATIVEIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentEffective daysworkedSteve Atkins <strong>RDMU</strong> hand over 14.02.2008 28.02.2008 12 14.02.2008 29.02.2008 12Alan Price Ecofin on transport 21.05.2008 10.06.2008 cancelledGeorge Blundell O'Reilly Viability Organic Sugar Production 31.07.2008 04.09.2008 30 01.09.2008 28.02.2009 30Johannes de Beer Technical Assessment 20 Fas 05.01.2009 05.05.2009 80 15.12.2008 30.04.2009 80Daniel Lambart FairTrade Certification 05.01.2009 09.02.2009 30 09.02.2009 04.03.2009 30Steve Atkins Socio-economic study Malkerns 05.01.2009 14.02.2009 30 07.01.2009 18.02.2009 30Robert Bloemers Review designs & tender documents 14.04.2009 13.07.2009 70 13.04.2009 02.07.2009 70Peter Zhou Asessment Grid Factor 20.04.2009 10.05.2009 12 26.04.2009 08.05.2009 12Martin Burian Asessment Grid Factor 20.04.2009 10.05.2009 13 19.04.2009 06.05.2009 13Tiekie de Beer Technical Audit 34 Fas 01.05.2009 29.08.2009 45 02.06.2009 18.12.2009 45Robert Bloemers Small Dams Evaluation & Screening 20.06.2009 20.07.2009 9 03.07.2009 12.07.2009 9Paul Goodison MIP 2011-13 Preparation 17.09.2009 05.10.2009 17 20.09.2009 10.10.2009 17Rene Timmer MIP 2011-13 Preparation 13.09.2009 05.10.2009 20 13.09.2009 08.10.2009 20Juan Palerm Strategic Environmental Assessment 20.01.2010 30.04.2010 60 18.02.2010 31.05.2010 60Rex Brown Strategic Environmental Assessment 20.01.2010 16.03.2010 35 23.02.2010 25.05.2010 35Penny Geerdts Strategic Environmental Assessment 20.01.2010 16.03.2010 35 23.02.2010 24.05.2010 34Anthea Dickie Review of logframe and M&E 10.02.2010 01.04.2010 35 28.02.2010 19.04.2010 35Peter Hughes Mananga College Business Plan 01.02.2010 25.02.2010 17 01.11.2010 07.12.2010 17Robert Bloemers AAP 2009 Tender Dossier additional days 12.03.2010 30.04.2010 40 03.11.2010 29.04.2010 40Roger Bailey AAP 2009 Primary Seed Cane 15.06.2010 05.07.2010 10 09.08.2010 31.10.2010 10Daniel Blank/ Joachim Schnurr Carbon Follow up PDD 01.09.2010 01.10.2010 15 02.09.2010 30.11.2010 15Hans Tagwerker Tender documents works tenders 05.11.2010 13.12.2010 35 12.11.2010 13.12.2010 20Total Amount 650 634Amount according to budget 660 660Still available 10 26Additional int short-term exp


3_Monitoring_STE_Request.xlsxMonitoring of Expert Days and Budget for <strong>RDMU</strong>Project:Restructuring and Diversification Management Unit, <strong>Swaziland</strong>Cost Center: 3011360End of contract 13.12.10Current date 09.05.2011Position of assignmentAdditional local Short-term ExpertsName of EXPERTKind of assignmentIndicative Start ofAssignmentIndicative Start of AssignmentIndicative End ofAssignmentDays requestedEffective Start ofAssignmentEFFECTIVEEffective End ofAssignmentPhumelele Thwala Gender audit 27.05.2008 09.06.2008 13 26.05.2008 16.06.2008 13Thulile Tsela Financial Assessment Assocations 01.07.2008 30.08.2008 50 07.04.2008 09.01.2008 50Lwazi Mhlongo Exit Strategy: cost of diversification 27.08.2008 01.10.2008 25 09.10.2008 10.10.2008 25J. Constantine / S. Mamba Communication & Visibility Strategy 06.10.2008 25.11.2008 28 13.09.2008 12.12.2008 28G. Nkambule/ N.F. Nxumalo Baseline survey 74 Fas 10.01.2009 19.02.2009 80 01.05.2009 17.04.2009 80Gift Nkambule / K. Khumalo Communication / Brochures 15.04.2009 13.08.2009 27 21.04.2009 30.04.2009 27G. Nkambule/ N.F. Nxumalo Basline Survey 61 individual growers 25.04.2009 30.05.2009 60 05.04.2009 21.07.2009 57Bongani Bhembe/ Fisiwe Mavuso Technical Audit 34 Fas 01.05.2009 28.09.2009 260 06.01.2009 30.11.2009 260Jabulile C. Dlamini Small Dams Evaluation & Screening 20.06.2009 20.07.2009 6 09.08.2009 22.09.2009 6Marius Kolesky FD Takhamiti: Team Leader 30.06.2009 15.09.2009 40 07.01.2009 16.11.2009 40J. van Rensburg FD Takhamiti: Irrigation Engineer 30.06.2009 15.09.2009 40 07.06.2009 29.10.2009 40Riaan Slabbert FD Takhamiti: Irrigation Technician 30.06.2009 15.09.2009 40 07.01.2009 16.11.2009 40Eksteen Lindeque FD Takhamiti: Agricultural Engineer 30.06.2009 15.09.2009 40 07.10.2009 30.10.2009 40Claudia de Beer FD Takhamiti: Draughtswoman 30.06.2009 15.09.2009 40 07.02.2009 27.10.2009 40Khetsiwe KhumaloDNA support: Approval proceduresand Sustainable DevelopmentIndicators09.01.2009 11.10.2009 51 14.09.2009 30.11.2009 51Kwanele Simelane Traffic Counts and Roads Survey 12.01.2009 16.02.2009 40 20.01.2010 16.03.2010 40Ntsika Nxumalo Traffic Counts and Roads Survey 12.01.2009 16.02.2009 40 20.01.2010 16.03.2010 40Jacob de Vries Traffic Counts and Roads Survey 12.01.2009 16.02.2009 40 20.01.2010 26.03.2010 40Bongani Bhembe/ Fisiwe Mavuso Technical Audit Individual Growers 01.08.2010 13.12.2010 180 02.08.2010 12.12.2010 180Effective daysworkedTotal Amount 1100 1097Amount according to budget 1200 1200Still available 100 103Additional local short-term exp


Annex 4Overview of all short-term assignments untilcontract end


4_Monitoring Experts and Workplan according to results.xls<strong>RDMU</strong> Short Term Consultant Monitoring and Work Plan according to RESULTS to be accomplished (according to logframe until 13 December 2010)RESULT Purpose STATUS Name of Expert Origin of Expert Type of STEExpertDaysPeriodDraft reportexpectedFINAL Report received orpreparedFINAL Report/Document sentto ECInternationalExpertSwazi Resident Swazi NationalRESULT 1: EC MIP 2007 - 2010 committedSO1 Smallholder IrrigationTechnical Assessment of Farmer Associations AAP 2009 finished Tiekie de Beer Swazi Resident Irrigation Expert 90 July - Dec 2008 monthly report download on <strong>RDMU</strong> website 90Financial Assessment of Farmer Associations AAP 2009 finished Folkard Wohlgemuth International Business Management 30 July-Oct 2008 30finished Simone Iltgen International Business Management 20 20finished Thuli Tsela Swazi National Local STE 50 50Summary Assessment of Farmer Associations AAP 2009 July-Oct 2008 Oct-08 Oct-08Ratoon Management Revolving Fund AAP 2009 finished Richard Bates International Business Management 25 Nov-Dec 2008 Dec-08 Jan-09 Jan-09 25Continuation of Technical Assessment of FAs (20) AAP 2009 finished Tiekie de Beer Swazi Resident Int. STE 80 Jan-April 2009 Jan, Feb, Mar Mar-09 download on <strong>RDMU</strong> website 80Baseline Survey 69 Fas AAP 2009 Mr Gift Nkambule Swazi National Local STE 55 Jan-Feb 2009 55AAP 2009 Mrs Nelisiwe Nxumalo Swazi National Local STE 25 Jan-Feb 2009 25Summary of Baseline Survey finished Feb-09 Sep-09 Mar-09FairTrade Certification AAP 2009 finished Daniel Lampart International Int STE 30 Jan-Feb 2009 Mar-09 Apr-09 May-09 30Technical Assessment of Farmer Associations (34) AAP 2009 Tiekie de Beer Swazi Resident Int STE 45 May - Sep 2009 45AAP 2009 Bongani Bhembe Swazi National Local STE 130 130AAP 2009 Fisiwe Mavuso Swazi National Local STE 130 130Summary of Technical Audit ( 34 FAS) AAP 2009 finished May - Nov 2009 monthly report download on <strong>RDMU</strong> websiteBaseline Survey 61 Individual Farmers AAP 2009 Mr Gift Nkambule Swazi National Local STE 50 50AAP 2009 Mrs Nelisiwe Nxumalo Swazi National Local STE 7 7Summary of Baseline Survey 61 Individual Farmers finished May- Jul 2009 Sep-09 Sep-09Ratoon Management Revolving Fund : Phase 2 AAP 2009 finished Richard Bates International Business Management 58 May-Nov 2009 Nov-09 changed as input procure 58SO 2 Social ServicesMananga College Business Plan AAP 2010 finished Peter Hughes International Int STE 17 Nov-10 Dec-10 Dec-10 Jan-11 17SO3 InfrastructurePIF Preparation/Design AAP 2008 finished Shaun Finley Swazi Resident Civil Engineer 40 May -Dec 2008 no report required 40AAP Elaboration AAP 2008 finished Robert Geddes International Civil Engineer 10 May-08 no report required 10Gender Audit AAP 2008 finished Phumelele Thwala Swazi National Local STE 13 May - June 08 Jul-08 Jul-08 13Environmental Assessment / Scoping AAP 2008 finished Rod de Vletter Swazi National Environment 23 May - Aug-08 Report Sep-08 23AAP 2008 finished Ara Monadjem Swazi National Environment 23 23Summary Environmental Assessment / Scoping AAP 2008 July-Oct 2008 Oct-08 Oct-08Roads Phase 2, Malkerns Canal, Evaluation tender AAP 2008 finished Shaun Finlay Swazi Resident Civil Engineer 50 Feb- May 2009 no report to be prepared 50Traffic Count for reprioritisation AAP 2010 Kwanele Simelane Swazi National Local STE 40 40Ntsika Nxumalo Swazi National Local STE 40 40Jacob de Vries Swazi Resident Local STE 40 40Summary Traffic Count and Road Survey AAP 2010 finished Jan - April 2010 Mar-10SO 4 DiversificationSmall-scale organic sugar mill AAP 2009 finished George Blundell O’Reilly International Int. STE 30 Sept - Oct 2008 Nov-08 Jan-09 Feb-09 30Exit Strategy – Cost of Diversification AAP 2009 finished Ernst Grenzebach International Agricultural Expert 35 Sep/Oct-08 35finished Lwazi Mhlongo Swazi National Local STE 25 25Summary Exit Strategy - Cost of Diversification AAP 2009 Aug-Oct 2008 Oct-08 Dec-08 Dec-08Carbon Trade/CDM/CMS: Phase 1 AAP 2009 finished Joachim Schnurr International Renewable Energy 27 Sep-08/Feb-09 27finished Christine Clashausen International Renewable Energy 32 32finished Christian Schweitzer International Renewable Energy 30 30finished Richard Koech International Renewable Energy 20 20Summary Carbon Trade / CDM / CMS Phase 1 AAP 2009 Aug-Oct 2008 Oct-08 Feb-09 Feb-09Eng. Assessment of Malkerns Irrigation Canal AAP 2009 finished Shaun Finley Swazi Resident Civil Engineer 27 Oct-Nov 2008 Dec/ Jan 2008 Feb-09 Feb-09 27Topographical Survey of Malkerns Irrigation Canal AAP 2009 finished Christopher Forte Swazi Resident Agricultural Expert 40 Sep - Nov 2008 no report to be submitted 40Socio-economic study of Malkerns Canal AAP 2009 finished Steve Atkins International Int. STE 30 Jan-Feb 2009 Feb/ Mar 2008 Feb-09 Feb-09 30Carbon Trade/CDM/PDD: Phase 2 AAP 2009 Joachim Schnurr International Renewable Energy 29 Sep-08/Feb-09 29Daniel Blank International Renewable Energy 41 41Gerald Kapp International Renewable Energy 21 21Summary Carbon Trade / CDM / PDD Ubo Phase 2 AAP 2009 finished Mar-May 2009 PDD in Sept 2009 Outgrower Rep. Dec 2010 Out grower Rep Dec 2010GRID Factor Assignment AAP 2009 Peter Zhou International Business Management 12 12Martin Burian International Business Management 13 13Summary Grid Factor AAP 2009 finished April-May 2009 May-09 Jun-09 Jun-09Support to DNA (CDM procedures and indicators) AAP 2009 finished Khetsiwe Khumalo Swazi National Local STE 51 Sep - Dec 2009 Nov-09 no report to be submitted 51Follow up on Carbon and PDD revised methodology AAP 2009 finished Blank/ Schnurr International Int. STE 15 Aug-Dec 2010 Dec-10 PDD in Dec 2010 no report to be submitted 15RESULT 2: EC MIP 2007 - 2010 implementedAAP 2007 (Smallholder Irrigation)Irrigation Design Reviews AAP 2007 finished Robert Bloemers International Irrigation Expert 100 100Mar-Aug 2008September 2008Oct-08Tender Dossier Preparation 800 ha AAP 2007 finished Robert Bloemers International Irrigation Expert 10 10Design Review and evaluation of works tender AAP 2007 finished Robert Bloemers International Int STE 70 April- July 2009 Jul-09 Sep 2009 70Final Design Takhamiti Irrigation System (280 ha) AAP 2007 finished MBB various experts International Local STE 200 July-Oct 2009 Oct-09 Jan-10 200Soil Survey Takhamiti Irrigation System (280 ha) AAP 2007 finished Eben Verster International Agricultural Expert 12 Aug - Sep 2009 Sep-09 Jan-10 12Poortzicht Technical Study AAP 2007 finished Shaun Finley Swazi Resident Civil Engineer 48 Sep - Nov 2009 Nov-09 Jan-10 48Tor and tender Document Bulk Irrigation AAP 2009 finished Robert Bloemers International Int STE 40 Feb-May 2010 May-10 Jul-10 Final tender dossier Dec 2010 40AAP 2008 (Transport and Infrastructure)Review of tender docs for various works contracts AAP2008/10 finished Hans Tagwerker International Int STE 20 Nov-Dec 2010 tender dossiers reviewed 20Support in tende dossier infrastructrue works AAP2008/10 finished Shaun Finlay Swazi Resident Civil Engineer 16 Nov-Dec 2010 tender dossiers reviewed 16AAP 2009 (Irrigation, Agr. Diversification, Grant C.)Technical Assistance to SCGA AAP 2009 finished Michael DUERR International Agricultural Expert 60 March - May 2010 SCGA grant docs May 2010 60finished Moses Ntuli Swazi National Agricultural Expert 20 March - Jul 2010 Diversification Rep. Dec 2010 20Summary of TA to SCGA March - May 2010 May-10 Dec-10Assessment of primary seedcane AAP 2009 finished Rober Bailey International Int STE 10 Jul-Oct 2010 Dec-10 Dec-10 10Technical Assessment of Individual Growers (43) AAP 2009 Tiekie de Beer Swazi Resident Int STE 29 May - Sep 2009 29AAP 2009 Bongani Bhembe Swazi National Local STE 90 90AAP 2009 Fisiwe Mavuso Swazi National Local STE 90 90Summary of Technical Audit ( 43 individuals) AAP 2009 finished Aug - Dec 2010 monthly report reports on websiteBulk Input procurement supply system AAP 2009/ 11 finished Richard Bates International Business Management 26 Sept-Dec 2010 Dec-10 Dec-10 Dec-10 26AAP 2010 (Social Services & Ec. DiversificationRESULT 3: Other NAS Activities financed and implementedRESULT 4: Stakeholder liaison established and in operationCommunication Strategy Comm & Visib finished Jennifer Constantine International Local STE 15 Oct-08 15finished Mamb./Nkam./ Khumalo Swazi National Local STE 40 40Summary Communication Strategy Comm & Visibility finished Oct - Dec 2008 Nov 200 Dec-08OTHER INTERVENTIONSHand over <strong>RDMU</strong> activities of 2007 <strong>RDMU</strong> finished Steve Atkins International Int. STE 12 Feb-08 Feb-08 12SIS and NAS Review for SSA Other finished Paul Goodison International Int. STE 18 Mar/ Apr 2009 Apr-09 subm. to industry May 2009 18Evaluation and Screening Small DamsGeotechnical Assessment Rob Sawyer Swazi Resident Agriculturalist 6 6Civil Engineer Shaun Finley Swazi Resident Civil Engineer 9 9Irrigation Engineer Robert Bloemers International Int STE 9 9Agriculturalist / team leader Mike Ogg International Agriculturalist 20 20Sociologist Jabulile Dlamini Swazi National Add Local STE 6 6Summary Small Dam Study Other finished June-Sep 2009 Sep-09 Jan-10MIP 2011 - 2013 Preparation MIP 2011-2013Team Leader Rene TIMMER International Int. STE 20 20Economist Paul Goodison International Int. STE 17 17Summary MIP preparation finished Sep - Oct 2009 Sep-09 Dec-09Strategic Environmental Assessment MIP 2007 - 2010 Juan Palerm International Int. STE 60 60Rex Brown Swazi National Int. STE 35 35Penny Geerts International Int. STE 35 35Summary Strategic Environmental Assessment finished Feb-May 2010 May-10 Aug-10Review of NAS Logframe NAS finished Anthea Dickie International Int. STE 35 Feb-April 2010 Aug-10 35Expert days / months according to ResultsOverview of origin of expert daysDaysworkas %monthsRESULT 1 57.6% 72.7International 1314 59.7 47% RESULT 2 30.3% 38.2Swazi National 943 42.9 34% RESULT 3Swazi Resident 520 23.6 19% RESULT 4 2.0% 2.5TOTAL 2,777 126.2 100% Other intervention 10.2% 12.81314 520 94322work months 2777Monitoring STE and Work Plan


Annex 5Financial status of the MIP 2007 – 2010programme


5_Financial_Status_MIP_2007-2010.xlsxSWAZILAND - SUGAR BUDGET LINE CONSUMPTIONSAAP DECISION NUMBER PROJECT NAME ALLOCATION Euro2006 18497 <strong>RDMU</strong> 4,703,000 4,665,962 99.21% 3,385,415 73% 37,038 0.79% 1,317,5852007 19052<strong>Swaziland</strong> Annual ActionProgramme 2007 -Accompanying Measures toSugar Protocol Countries 14,895,000 14,494,381 97% 4,085,759 28% 400,619 2.69% 10,809,2412008 19848<strong>Swaziland</strong> Annual ActionProgramme 2008 -Accompanying Measures forSugar Protocol Countries -Transport Infrastructures 18,000,000 685,328 4% 616,795 90% 17,314,672 96.19% 17,383,2052009 20576Support to SugarcaneSmallgrowers,Diversification and NAScoordination 16,500,000 949,975 6% 0 0% 15,550,025 94.24% 16,500,000total allocations 2006 to 2009 54,098,000 20,795,646 38% 8,087,969 39% 33,302,354 61.56% 46,010,0312010 22044*Accompanying Measures forSugar 2010 - RoadTransport Infrastructure 12,057,000 0 0% 0 0% 12,057,000 100.00% 12,057,000N.B.: Financing Agreement for AAP 2010 not signed yet.CONTRACTEDEuroCONTRACTED %PAIDEuroPAID%RAC (To becontracted)EuroRAC %RAL (To bepaid)Euro31 Dec 2010


5_Financial_Status_MIP_2007-2010.xlsxContract Number Title / CONTRACTING PARTY NatureContractSignaturedateEnd dateofactivitiesAmount (EUR) Paid (EUR) Balance (EUR)UnderpreparationSUCRE/2007/133-117SUCRE/2007/133-128SUCRE/2007/133-131SUCRE/2007/147-446SUCRE/2009/206-474SUCRE/2009/216-425Consultancy to serve as an interim structure for theRestructuring and Diversification Management UnitCARDNO AGRISYSTEMS LIMITEDIdentification Mission for an Infrastructure ImprovementProgramme in the Sugar SectorPARSONS BRINCKERHOFF LTDConsultancy for provision and management of socialservices in the sugar beltAGRICONSULTING EUROPE SARestructuring and Diversification Management Unit toCoordiante the implementation of the Natioanl AdaptationStrategy to the EU Sugar Sector Reform in <strong>Swaziland</strong>GFA CONSULTING GROUP GMBHMid-term Evaluation of the Restructuring and DiversificationManagement Unit (<strong>RDMU</strong>) to Coordinate theImplementation of the National Adaptation Strategy to theEU Sugar Reform, <strong>Swaziland</strong>ITALTREND SPADetailed Design and supervision for the Upgrading ofSecondary Roads in Hhohho District, <strong>Swaziland</strong>. Phase 1, II& III – Preliminary, and detailed technical design study, andassistance with tendering evaluation for worksNICHOLAS O'DWYER AND COMPANY LTDSERSERSERSERSERSER27.03.2007 24.01.200816.05.2007 25.09.200714.05.2007 18.09.200703.01.2008 14.12.201029.05.2009 21.11.200927.08.2009 17.12.2010189,680.00138,532.00158,960.003,789,758.0065,372.00323,660.00189,680.00138,532.00158,960.002,735,772.7465,372.0097,098.00---1,053,985.26-226,562.000.000.000.000.000.000.00TOTAL 31/12/2010 4,665,962.00 3,385,414.74 1,280,547.26 -TOTAL FA 2006 4,703,000.00RAC 37,038.00RAL 1,317,585.26AAP 2006


5_Financial_Status_MIP_2007-2010.xlsxContract Numb Title / CONTRACTING PARTY NatureContractSignaturedateEnd dateofactivitiesAmount (EUR) Paid (EUR) Balance (EUR)DCI-SUCRE/2009/203-062DCI-SUCRE/2009/216-232DCI-SUCRE/2009/219-838Technical Assistance: Support to Smallholder SugarCane Growers – Phase 1GRM INTERNATIONAL BVSupply and Installation of Irrigation Equipment Round 1Lot 2 Southern Area (Usuthu – LUSIP)IRRICON (EIENDOMS) BEPERKTSupply and Installation of Irrigation Equipment Round 1Lot 1 Northern Area (Komati – KDDP)SWAZILAND INTERNATIONAL IRRIGATION(PROPRIETARY) LIMITEDSERWKSWKS15.04.2009 15.04.201216.09.2009 15.03.201005.12.2009 25.07.20103,057,012.001,976,185.691,187,681.70-1,631,861.471,026,257.213,057,012.000344,324.22161,424.49DCI-SUCRE/2010/248-221DCI-SUCRE/2010/255-978Land preparation, supply and installation of irrigationequipment for small holder growers in the sugar caneproducing areas of the northeast and southeastlowveld in the Kingdom of <strong>Swaziland</strong> - Lots 1, 2 and 3S & B CIVILS ROADS (PROPRIETARY) LIMITEDLand preparation, supply and installation of irrigationequipment for small holder growers in the sugar caneproducing areas of the northeast and southeastlowveld in the Kingdom of <strong>Swaziland</strong> (round 3) Lots 1and 2S & B CIVILS ROADS (PROPRIETARY) LIMITEDWKS 22.10.2010 20.04.2011 5,472,620.05 1,427,640.00WKS 22.12.2010 01.09.20114,044,980.052,800,881.56 0.00 2800881.56UnderpreparationTOTAL 31/12/2010 14,494,381.00 4,085,758.68 10,408,622.32TOTAL FA 2007 14,895,000.00RAC 400,619.00RAL 10,809,241.32AAP 2007


5_Financial_Status_MIP_2007-2010.xlsxContract Numb Title / CONTRACTING PARTY NatureContractSignaturedateEnd dateofactivitiesAmount (EUR) Paid (EUR) Balance (EUR)UnderpreparationDCI-SUCRE/2009/208-741Detailed design and supervision for theconstruction of Siphofaneni Bridge and theupgrading of the Siphofaneni/ St Phillipsroad, Siphofaneni region, <strong>Swaziland</strong>(Component 1 Design to Tender)AURECON SOUTH AFRICA(PROPRIETARY) LIMITEDSER 01.07.2009 01.01.2011 685,328.00 616,795.20 68,532.800.00TOTAL 31/12/2010 685,328.00 616,795.20 68,532.80 -TOTAL FA 2008 18,000,000.00RAC 17,314,672.00RAL 17,383,204.80AAP 2008


5_Financial_Status_MIP_2007-2010.xlsxContract Numb Title / CONTRACTING PARTY NatureContractSignaturedateEnd dateofactivitiesSUCRE/2007/147-446DCI-SUCRE/2010 /258-690Restructuring and Diversification ManagementUnit to Coordiante the implementation of theNatioanl Adaptation Strategy to the EU SugarSector Reform in <strong>Swaziland</strong>GFA CONSULTING GROUP GMBHSupport to existing small and medium sugarcane growers in <strong>Swaziland</strong>.THE SWAZILAND CANE GROWERSASSOCIATIONSERACT13.12.2010 12.12.2012Amount (EUR) Paid (EUR) Balance (EUR)Underpreparation949,975.00 0 949,975.00 0.000.00 0.00 3,795,000.00TOTAL 31/12/2010 949,975.00 - 949,975.00 -TOTAL FA 2009 16,500,000.00RAC 15,550,025.00RAL 16,500,000.00AAP 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!