11.07.2015 Views

mfturp-1 - SDDC - U.S. Army

mfturp-1 - SDDC - U.S. Army

mfturp-1 - SDDC - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AIR TRANSPORTATION SERVICE PROVIDER RULESSECTION Fsevere weather. In each instance the failure to perform must be beyond the control and withoutthe fault or negligence of the Transportation Service Provider (TSP).ITEM 435EXCESS VALUATION (EVC)Should the consignor desire to declare and establish cargo liability for an amount greater than$1.00 per pound per piece or $100 per piece, whichever is greater, but not to exceed actual valueof articles lost or damaged plus the amount of applicable transportation charges, the carrieragrees to provide this increased liability coverage for EVC(1) $______ for each $100 or fractionthereof.ITEM 437REDELIVERY (RCL)1. In addition to the charges shown in Section B, Item 63, the Transportation Service Provider(TSP) may establish a flat charge of RCL(4) $_______ per shipment. If RCL(4) is selected,RCL(1), RCL(2), and RCL(3) will not be applicable.2. If, after being notified that the shipment is on hand, the consignee elects to pick up theshipment at the TSP's terminal, no RCL charges will apply.3. Installations incurring charges under this item will be billed directly. See ITEM 423,SUBMISSION OF CHARGES FOR ACCESSORIAL SERVICES.Issue Date: 29 March 2011 Effective Date: 01 April 2011Headquarters Air Mobility Command402 Scott DriveScott AFB, Illinois 62225-229-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!