Kohistan Final.cdr - ERRA
Kohistan Final.cdr - ERRA
Kohistan Final.cdr - ERRA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ANNUAL WORK PLAN 2007-08 DRU-<strong>Kohistan</strong><br />
44<br />
Allocation for 2007-2008<br />
Total<br />
(Millions)<br />
Foreign<br />
Exchange<br />
Rupee<br />
(Million)<br />
Estimated<br />
Expenditure up<br />
to June ,2007<br />
Total (F. Aid)<br />
Estimated Cost<br />
Foreign<br />
Aid(FEC)<br />
Total<br />
(Million)<br />
Approved by<br />
Dates of<br />
Approval<br />
& Completion<br />
Name of the Project<br />
/Location<br />
Sr. No<br />
0.524 _ 0.131 0.524 _ 0.524<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
Approved<br />
DRAC:dt,29/ 07/ 06<br />
COMP:dt,30/ 06/ 08<br />
S. BRIDGE GABAR NALLA<br />
UC Goshali Teh Dassu<br />
16<br />
0.800 _ 0.200 0.800 _ 0.800<br />
DADAIR HAJOO IRR<br />
CHANELL<br />
UC Baryar Teh Dassu<br />
GADAIR MOOM IRR CHANELL<br />
UC Gabral Teh Dassu<br />
17<br />
0.300 _ 0.075 0.300 _ 0.300<br />
18<br />
0.400 _ 0.100 0.400 _ 0.400<br />
SHALL IRR CHANELL<br />
UC Dassu Teh Dassu<br />
19<br />
0.200 _ 0.050 0.200 _ 0.200<br />
SHALL 2 IRR CHANELL<br />
UC Dassu Teh Dassu<br />
20<br />
0.400 _ 0.100 0.400 _ 0.400<br />
MEDAN IRR CHANELL<br />
UC Dassu Teh Dassu<br />
21<br />
0.271 _ 0.068 0.271 _ 0.271<br />
S. BRIDGE NOOR HALL BALLA<br />
UCThooti Teh Dassu<br />
22<br />
0.141 _ 0.035 0.141 _ 0.141<br />
W.BRIDGE BAR BALA<br />
UC Bar Jalkot Teh Dassu<br />
23<br />
0.095 _ 0.024 0.095 _ 0.095<br />
W.BRIDGE BAR GAHEEN<br />
UC Bar Jalkot Teh Dassu<br />
24<br />
0.110 _ 0.028 0.110 _ 0.110<br />
W. BRIDGE SANG MASS HARBAN<br />
UC Harban Teh Dassu<br />
25<br />
7.421 7.421 7.421<br />
Sub Total New TMA Others Schemes