26.11.2012 Views

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNUAL WORK PLAN 2007-08 DRU-<strong>Kohistan</strong><br />

30<br />

Allocation for 2007-2008<br />

Total<br />

(Millions)<br />

Foreign<br />

Exchange<br />

Rupee<br />

(Million)<br />

Estimated<br />

Expenditure up<br />

to June ,2007<br />

Total (F. Aid)<br />

Estimated Cost<br />

Foreign<br />

Aid(FEC)<br />

Total<br />

(Million)<br />

Approved by<br />

Dates of<br />

Approval<br />

& Completion<br />

Name of the Project<br />

/Location<br />

Sr. No<br />

58.995 _ _ 24.000 _ 24.000<br />

Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Approved<br />

DRAC: dt 29/07/06<br />

72.000 10.000 10.000<br />

COMP: dt 30/06/08<br />

14 RANOLIA VALLEY RD<br />

(09 KM) (W & S)<br />

Construction of alternate new 7 roads instead of<br />

Chowa Darra Road<br />

i. Dubair Shungial Rd (5 Km) (Rs. 15 m)<br />

ii. Dubair Dher Bela (2 Km) (Rs. 6 m)<br />

15 iii. KKH Sangai Bankad Rd (5 Km) (Rs. 15 Km)<br />

iv. Semo Dara Rd (4 Km) (Rs. 12m)<br />

v. Khankai Mandru (2 Km) (Rs. 6 m)<br />

vi. Gabar Zoor Kali Rd (4 Km) (Rs. 12 m)<br />

vii. KKH-Shel Khan Abad (2 Km) (Rs. 6 m)<br />

Bridges<br />

24.301 _ _ 1.000 _ 1.000<br />

Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Approved<br />

DRAC: dt 29/07/06<br />

16 Jashei Kandian Bridge(Replacement)<br />

(W&S)<br />

27.300 _ _ 1.000 _ 1.000<br />

COMP: dt 30/06/08<br />

17 Kaarang Kandian Bridge (Replacement)<br />

(W&S)<br />

12.900 _ _ 1.000 _ 1.000<br />

Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

18 Kanoi Bridge(Replacement)<br />

(W&S)<br />

4.200 _ _ 4.200 _ 4.200<br />

19 Shatial Bridge(Replacement)<br />

(W&S)<br />

3.600 _ _ 3.600 _ 3.600<br />

20 Goshali, Jalkot Brid ge(Replacement)<br />

(W&S)<br />

2.889 _ _ 2.889 _ 2.889<br />

17.700 _ _ 17.700 _ 17.700<br />

1272.076 15.000 588.760 0.000 588.760<br />

Approved<br />

21 Repair/Renovation two suspension Bridges at Doga DRAC: ( dt 29/07/06<br />

W&S)<br />

COMP: dt 30/06/08<br />

Construction of suspension Bridge at Mirbat Approved<br />

22 (Instead of Mehreen) (W&S)<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Sub Total<br />

TMA Roads<br />

1.000 _ _ 1.000 _ 1.000<br />

23<br />

0.800 _ _ 0.800 _ 0.800<br />

KANDOO BANKHAD RD (TMA PATTAN) Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

CHARONA BANKHAD RD (TMA PATTAN) Approved<br />

DRAC: dt 29/07/06<br />

COMP: dt 30/06/08<br />

Approved<br />

DRAC: dt 29/07/06<br />

GHAZI ABAD RD (TMA PALLAS)<br />

COMP: dt 30/06/08<br />

24<br />

1.000 _ _ 1.000 _ 1.000<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!