Kohistan Final.cdr - ERRA
Kohistan Final.cdr - ERRA
Kohistan Final.cdr - ERRA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ANNUAL WORK PLAN 2007-08 DRU-<strong>Kohistan</strong><br />
30<br />
Allocation for 2007-2008<br />
Total<br />
(Millions)<br />
Foreign<br />
Exchange<br />
Rupee<br />
(Million)<br />
Estimated<br />
Expenditure up<br />
to June ,2007<br />
Total (F. Aid)<br />
Estimated Cost<br />
Foreign<br />
Aid(FEC)<br />
Total<br />
(Million)<br />
Approved by<br />
Dates of<br />
Approval<br />
& Completion<br />
Name of the Project<br />
/Location<br />
Sr. No<br />
58.995 _ _ 24.000 _ 24.000<br />
Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Approved<br />
DRAC: dt 29/07/06<br />
72.000 10.000 10.000<br />
COMP: dt 30/06/08<br />
14 RANOLIA VALLEY RD<br />
(09 KM) (W & S)<br />
Construction of alternate new 7 roads instead of<br />
Chowa Darra Road<br />
i. Dubair Shungial Rd (5 Km) (Rs. 15 m)<br />
ii. Dubair Dher Bela (2 Km) (Rs. 6 m)<br />
15 iii. KKH Sangai Bankad Rd (5 Km) (Rs. 15 Km)<br />
iv. Semo Dara Rd (4 Km) (Rs. 12m)<br />
v. Khankai Mandru (2 Km) (Rs. 6 m)<br />
vi. Gabar Zoor Kali Rd (4 Km) (Rs. 12 m)<br />
vii. KKH-Shel Khan Abad (2 Km) (Rs. 6 m)<br />
Bridges<br />
24.301 _ _ 1.000 _ 1.000<br />
Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Approved<br />
DRAC: dt 29/07/06<br />
16 Jashei Kandian Bridge(Replacement)<br />
(W&S)<br />
27.300 _ _ 1.000 _ 1.000<br />
COMP: dt 30/06/08<br />
17 Kaarang Kandian Bridge (Replacement)<br />
(W&S)<br />
12.900 _ _ 1.000 _ 1.000<br />
Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
18 Kanoi Bridge(Replacement)<br />
(W&S)<br />
4.200 _ _ 4.200 _ 4.200<br />
19 Shatial Bridge(Replacement)<br />
(W&S)<br />
3.600 _ _ 3.600 _ 3.600<br />
20 Goshali, Jalkot Brid ge(Replacement)<br />
(W&S)<br />
2.889 _ _ 2.889 _ 2.889<br />
17.700 _ _ 17.700 _ 17.700<br />
1272.076 15.000 588.760 0.000 588.760<br />
Approved<br />
21 Repair/Renovation two suspension Bridges at Doga DRAC: ( dt 29/07/06<br />
W&S)<br />
COMP: dt 30/06/08<br />
Construction of suspension Bridge at Mirbat Approved<br />
22 (Instead of Mehreen) (W&S)<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Sub Total<br />
TMA Roads<br />
1.000 _ _ 1.000 _ 1.000<br />
23<br />
0.800 _ _ 0.800 _ 0.800<br />
KANDOO BANKHAD RD (TMA PATTAN) Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
CHARONA BANKHAD RD (TMA PATTAN) Approved<br />
DRAC: dt 29/07/06<br />
COMP: dt 30/06/08<br />
Approved<br />
DRAC: dt 29/07/06<br />
GHAZI ABAD RD (TMA PALLAS)<br />
COMP: dt 30/06/08<br />
24<br />
1.000 _ _ 1.000 _ 1.000<br />
25