26.11.2012 Views

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DISTRICT PROFILE - KOHISTAN<br />

3.8 Transport Sector<br />

i. Extent of Damages:<br />

The total length of Works and Services and Tehsil Municipal Roads damaged due to the<br />

earthquake has been estimated as follow:<br />

Highways<br />

(in km)<br />

Major<br />

Roads (in<br />

km)<br />

Extent of Damage to Transport (Road) Sector<br />

<strong>Kohistan</strong><br />

Link<br />

Roads (in<br />

km)<br />

Rural Roads (in km)<br />

Stone<br />

Sole<br />

Black<br />

Top<br />

ii. Reconstruction Plan:<br />

Priority criteria have been developed in the Transportation Strategy to start work on<br />

selected roads as early as possible through the concerned departments, which are the<br />

Works & Services and Tehsil Municipal Administration for construction and repair link<br />

and rural roads.<br />

3.9 Environment<br />

i. Extent of Damage<br />

In the Palas conservation area although no accurate damage assessment has been done for<br />

wild life but phenomenon of land slide and destabilization of slope would inevitably have<br />

negative bearing on nesting and feeding areas of wild life. Various hatcheries and fish<br />

farming activities have also been affected due to damages.<br />

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - <strong>ERRA</strong><br />

Table 25<br />

Number of<br />

Structures<br />

Total Bridges Culverts<br />

00 00 222 107 757 329 09 00<br />

Works & Services Tehsil Municipal administration TMA/<br />

(W&S)<br />

Source: Tv Strategy, 2006<br />

(TMA)<br />

W&S<br />

Year Wise Proposed Budget for Transport Sector<br />

Year / Target<br />

2006-<br />

2007<br />

Length of Road (km) 329 329<br />

No. of Bridges<br />

No. of foot Bridges and Culverts<br />

09 09<br />

100% 100%<br />

Source: Internal Sources of <strong>ERRA</strong>, Transport Strategy<br />

Total<br />

Table 26<br />

Cost<br />

(Rs.<br />

Million)<br />

1313.496<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!