DISTRICT PROFILE - KOHISTAN<br />
22<br />
3.7 Power (Electricity)<br />
i. Extent of Damages:<br />
In District <strong>Kohistan</strong> some damages were recorded by the Sarhad Hydro Power<br />
Development Organization (SHYDO), where 3 microhydel power generators at Jalkot,<br />
Dubair is and Kayal under the supervision of SHYDO, which are in working condition,<br />
and were affected due to the earthquake.<br />
ii. Reconstruction Plan:<br />
PESCO holds responsibility for electricity distribution in the affected districts of NWFP<br />
(Abbottabad, Mansehra, Battagram, <strong>Kohistan</strong> and Shangla). It manages both the STG and<br />
distribution (11 kV and 0.44 kV) networks, provides consumer connections, and handles<br />
billing, collection and other operational matters.<br />
Table 24<br />
Reconstruction Plan for Electric-Power Distribution Infrastructure<br />
Project Name of Scheme<br />
Estimated<br />
cost<br />
Jalkot HPP<br />
Rehabilitation & Reconstruction<br />
Power Channel Jalkot<br />
of Electrical<br />
0.036$<br />
Dubair HPP<br />
Rehabilitation & Reconstruction<br />
Power Channel Dubair<br />
of Electrical<br />
0.005$<br />
Jalkot HPP Access Roads 0.003$<br />
Kayal HPP Access Roads 0.007$<br />
Source: Power strategy July, 2006<br />
EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - <strong>ERRA</strong>