DISTRICT PROFILE - KOHISTAN<br />

22<br />

3.7 Power (Electricity)<br />

i. Extent of Damages:<br />

In District <strong>Kohistan</strong> some damages were recorded by the Sarhad Hydro Power<br />

Development Organization (SHYDO), where 3 microhydel power generators at Jalkot,<br />

Dubair is and Kayal under the supervision of SHYDO, which are in working condition,<br />

and were affected due to the earthquake.<br />

ii. Reconstruction Plan:<br />

PESCO holds responsibility for electricity distribution in the affected districts of NWFP<br />

(Abbottabad, Mansehra, Battagram, <strong>Kohistan</strong> and Shangla). It manages both the STG and<br />

distribution (11 kV and 0.44 kV) networks, provides consumer connections, and handles<br />

billing, collection and other operational matters.<br />

Table 24<br />

Reconstruction Plan for Electric-Power Distribution Infrastructure<br />

Project Name of Scheme<br />

Estimated<br />

cost<br />

Jalkot HPP<br />

Rehabilitation & Reconstruction<br />

Power Channel Jalkot<br />

of Electrical<br />

0.036$<br />

Dubair HPP<br />

Rehabilitation & Reconstruction<br />

Power Channel Dubair<br />

of Electrical<br />

0.005$<br />

Jalkot HPP Access Roads 0.003$<br />

Kayal HPP Access Roads 0.007$<br />

Source: Power strategy July, 2006<br />

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - <strong>ERRA</strong>