26.11.2012 Views

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

Kohistan Final.cdr - ERRA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DISTRICT PROFILE - KOHISTAN<br />

20<br />

1<br />

2<br />

Water and Sanitation Reconstruction Plan and Budget - <strong>Kohistan</strong><br />

S. No. Item Description<br />

Rehabilitation/Reconstruc<br />

tion of WSS /<br />

Infrastructure<br />

Rehabilitation/Reconstruc<br />

tion of Sanitation<br />

Infrastructure<br />

3 Solid Waste Management<br />

4<br />

5<br />

6<br />

7<br />

Rehabilitation/Reconstruc<br />

tion of Buildings<br />

Water quality monitoring<br />

and management<br />

Community Mobilization<br />

/ Hygiene Promotion<br />

Project/Contract Staff<br />

Salaries<br />

123 Nos. (38 Public Health Engineering<br />

Department, 21 TMA Dassu, 29TMA<br />

Pattan&35 TMA Pallas) damaged<br />

/destroyed schemes<br />

6 Nos. schemes for Drainage, street<br />

pavement, public toilets etc<br />

Design of system and development of site<br />

including provision of equipment and<br />

machinery<br />

Rehabilitation/Reconstruction<br />

office/residential Buildings<br />

Water quality monitoring and<br />

chlorination<br />

Workshops, Meetings, Community<br />

Sessions, Promotional Material<br />

Table 19<br />

Estimated<br />

Budget ( Rs<br />

Million.)<br />

49.659<br />

5.562<br />

15.00<br />

3.6 Governance (Administrative Infrastructure)<br />

i. Extent of Damages:<br />

The administrative infrastructure system in the District <strong>Kohistan</strong> was also affected by the<br />

destruction caused due to Earthquake Oct, 2005.<br />

ii. Reconstruction Plan<br />

The first priority of <strong>ERRA</strong> in its programme for the governance sector is to reconstruct<br />

and rehabilitate public office /residential buildings. The reconstruction of government<br />

buildings has been rationalized to make functioning more efficient and accessible for<br />

public convenience. The three-year financial phasing has been done considering the<br />

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - <strong>ERRA</strong><br />

1.48<br />

13.9<br />

3.45<br />

Incremental Project Staff 2.51<br />

8 Vehicles 4 WD Cab SSR and Motor Cycles 6.40<br />

9 Equipment and Material Computer equipment, Office furniture etc 1.25<br />

10 Consultancies / TA<br />

Technical Assistance for supervision of<br />

quality assurance<br />

Training on design and construction for<br />

1.25<br />

11 Training<br />

earthquake resistant water and sanitation<br />

infrastructure<br />

0.5<br />

12 Outstation Travel 0.54<br />

13 POL 0.90<br />

14 O&M<br />

Operations and Maintenance<br />

vehicles and equipment<br />

cost of<br />

0.90<br />

15 Contingencies 1.88<br />

Total (Million Rs.)<br />

Source: Internal Sources of <strong>ERRA</strong> - WATSAN Strategy Paper July 2006<br />

103.33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!