Construction & Development Costs<br />

Large Medium Small<br />

License Fee $66.5 $66.5 $66.5<br />

Land Cost estimated as a % of Building Costs 20.0% 10.0% 10.0%<br />

Development, Construction & Fees<br />

Design/Architectural Fees (% of building) 8.5% 8.5% 8.5%<br />

Other/Pre-Open (% of gaming rev) 5.0% 5.0% 5.0%<br />

Bank Cash (% of gaming rev) 2.0% 2.0% 2.0%<br />

Slot Machine Purchases * $22,000 $22,000 $22,000<br />

Square Foot Allocation/<strong>Gaming</strong> Position<br />

Casino 35 35 35<br />

Back of House as a % of casino 50.0% 50.0% 50.0%<br />

Other (including F&B) as a % of casino 50.0% 50.0% 50.0%<br />

TOTAL Estimated Square Feet<br />

Cost per Square Foot Large Medium Small<br />

Casino $600 $525 $450<br />

Back of House $250 $250 $250<br />

Other (including F&B) $500 $450 $400<br />

Parking Garage:<br />

Space / Position Count 70.0% 50.0% 50.0%<br />

Cost per space/ Garage Costs $15,000 $15,000 $15,000<br />

Surface Parking:<br />

Spaces / Position Count 30.0% 50.0% 50.0%<br />

Cost per space/Surface Lot Costs $4,000 $4,000 $4,000<br />

Contingency 7.0% 6.5% 6.0%<br />

* 92% of machines purchased; 8% assumed to be leased participation games.<br />

Unit price includes player tracking system<br />

At this level of cost per square foot the resulting facilities would be competitive with any<br />

currently existing in the <strong>Pennsylvania</strong> market. Sufficient space is included to provided for backof-house<br />

functions and for restaurant, bar and limited retail developments. Assumptions for<br />

depreciation of assets are as follows:<br />

Depreciation Assumptions<br />

Large Medium Small<br />

Building as a % of Constructions costs 70.0% 70.0% 70.0%<br />

Furniture, Fixtures & Equipment as a % of Construction<br />

Costs 30.0% 30.0% 30.0%<br />

Depreciation Schedule<br />

License 20 20 20<br />

Building & Other Long Term Costs 20 20 20<br />

FF&E 10 10 10<br />

Slot Machines 5 5 5<br />

The Innovation Group Project #054-11 August 2011 Page 86