11.07.2015 Views

GearBoss Shelving System - Wenger Corporation

GearBoss Shelving System - Wenger Corporation

GearBoss Shelving System - Wenger Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION (CONTINUED)INSTALLING THE SHELF SUPPORT BRACKET (CONTINUED)13. Place the first upright tube on it’s support bracket. Using a level to keep the upright tubevertical, make a V-mark on the chalk line 1 1/4” to the left of the upright tube.1 1/4”Chalk LineV-MarkUpright TubeWallRemove the upright tube from it’s support bracket.14. Hold the shelf support bracket with it’s bottom edge on the chalk line and it’s left end atthe V-mark.If the wall is masonry construction, locate the first shelf support bracket here, referring tothe fastener guidelines on page 4.If the wall is stud construction, it may be necessary to (1) move the shelf support bracketto the left until the punched holes align with the studs or (2) drill holes in the shelfsupport bracket to align with the studs.Warning: With stud wall construction, a fastener must be installed in every stud. Refer tothe fastener guidelines on page 4.Chalk LineMove shelf support bracket if necessary.V-MarkFastenersShelf Support BracketEach additional shelf support bracket must overlap the previous one so the end holesalign. If the last shelf support bracket is too long, it may be cut off 1” past the last uprighttube.Shelf Support BracketOverlap & Align Holes9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!