Interim Report on Afghan National Army Petroleum, Oil, and Lubricants

Interim Report on Afghan National Army Petroleum, Oil, and Lubricants

Interim Report on Afghan National Army Petroleum, Oil, and Lubricants

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

John F. Sopko, Special Inspector GeneralSpecial Inspector General for <strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong>Main: 703-545-60001550 Crystal Drive, 9th FloorArlingt<strong>on</strong>, VAwww.sigar.milSeptember 10, 2012The H<strong>on</strong>orable Le<strong>on</strong> E. PanettaSecretary of DefenseGeneral James N. MattisComm<strong>and</strong>er, U.S. Central Comm<strong>and</strong>General John R. AllenComm<strong>and</strong>er, U.S. Forces‐<strong>Afghan</strong>istan, <strong>and</strong>Comm<strong>and</strong>er, Internati<strong>on</strong>al Security Assistance ForceLieutenant General Daniel P. BolgerComm<strong>and</strong>ing General, NATO Training Missi<strong>on</strong>‐<strong>Afghan</strong>istan/Combined Security Transiti<strong>on</strong> Comm<strong>and</strong>‐<strong>Afghan</strong>istanSUBJECT: <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> <strong>on</strong> <strong>Afghan</strong> Nati<strong>on</strong>al <strong>Army</strong> <strong>Petroleum</strong>, <strong>Oil</strong>, <strong>and</strong> <strong>Lubricants</strong> (SIGAR 12‐14)The Special Inspector General for <strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong> is c<strong>on</strong>ducting an audit of the <strong>Afghan</strong>Nati<strong>on</strong>al <strong>Army</strong>’s (ANA) logistics capability for petroleum, oil, <strong>and</strong> lubricants (POL) (code 054A). Duringthe c<strong>on</strong>duct of this audit, two issues arose c<strong>on</strong>cerning the accuracy of ANA fuel requirements <strong>and</strong>accountability for fuel purchases, deliveries, <strong>and</strong> c<strong>on</strong>sumpti<strong>on</strong>. We believe these issues warrantimmediate attenti<strong>on</strong> in light of upcoming budget decisi<strong>on</strong>s <strong>and</strong> the transiti<strong>on</strong> of ANA POL resp<strong>on</strong>sibilitiesal<strong>on</strong>g with direct transfer of U.S. funds to the <strong>Afghan</strong> government. This report makes tworecommendati<strong>on</strong>s to the Comm<strong>and</strong>ing General, NATO Training Missi<strong>on</strong>‐<strong>Afghan</strong>istan (NTM‐A)/CombinedSecurity Transiti<strong>on</strong> Comm<strong>and</strong>‐<strong>Afghan</strong>istan (CSTC‐A) to (1) maintain the fiscal year 2012 budget requestfor ANA fuel requirements until it develops a suitable method <strong>and</strong> systemic process for estimating ANAfuel needs, <strong>and</strong> (2) improve overall fuel accountability for fuel purchases, deliveries, <strong>and</strong> c<strong>on</strong>sumpti<strong>on</strong>.When preparing the final report, we c<strong>on</strong>sidered comments from NTM‐A/CSTC‐A. These comments arereproduced in appendix III. NTM‐A/CSTC‐A did not agree with the first recommendati<strong>on</strong> <strong>and</strong> c<strong>on</strong>curredwith all four parts of the sec<strong>on</strong>d recommendati<strong>on</strong>. SIGAR c<strong>on</strong>ducted this work under the authority ofPublic Law 110‐181, as amended, the Inspector General Act of 1978, <strong>and</strong> the Inspector General ReformAct of 2008 <strong>and</strong> in accordance with generally accepted government auditing st<strong>and</strong>ards.John F. SopkoSpecial Inspector Generalfor <strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong>SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 1


use, <strong>and</strong> fuel c<strong>on</strong>sumpti<strong>on</strong> at each ANA locati<strong>on</strong>. CSTC‐A reported using c<strong>on</strong>sumpti<strong>on</strong> data <strong>and</strong> rates indeveloping budget estimates for fiscal years 2012 <strong>and</strong> 2013 funding requirements, but this informati<strong>on</strong>could not be verified due to a lack of supporting documentati<strong>on</strong>. In June 2012, CSTC‐A changed itsmethod for determining annual fuel funding levels <strong>and</strong> estimated ANA fuel requirements for fiscal years2014‐2018 by using data from <strong>on</strong>ly 1 m<strong>on</strong>th. Specifically, CSTC‐A projected fuel funding requirementsfor a 5‐year period using data from March 2012. In additi<strong>on</strong>, CSTC‐A has based most ANA fuel orders <strong>on</strong>what ANA has requested, rather than using the m<strong>on</strong>thly c<strong>on</strong>sumpti<strong>on</strong> form (MOD Form 32), as requiredby MOD Decree 4.6.CSTC‐A estimated that approximately 754 ANSF locati<strong>on</strong>s, including 254 ANA locati<strong>on</strong>s, received fueldirectly from vendors. However, CSTC‐A had no informati<strong>on</strong> <strong>on</strong> whether these locati<strong>on</strong>s had sufficientfuel storage capacity to receive vendor deliveries, which would have enabled CSTC‐A to know whetherlocati<strong>on</strong>s were accepting more fuel than they could actually store. CSTC‐A also allotted fuel for vehicleslisted that do not require fuel, such as trailers. Despite repeated requests to CSTC‐A, we were notprovided any informati<strong>on</strong> <strong>on</strong> the number <strong>and</strong> locati<strong>on</strong> of generators or the capacity <strong>and</strong> c<strong>on</strong>sumpti<strong>on</strong>for each generator. Without this informati<strong>on</strong>, we could not determine fuel requirements for generatorsor assess the extent to which generator requirements were factored into current estimates.Following our May 2012 briefing to DCOM‐SPO, the comm<strong>and</strong> initiated efforts to identify <strong>and</strong> reportbulk fuel storage capabilities, reduce the number of ANSF locati<strong>on</strong>s that would receive bulk fuel directly(from 754 to 98 sites, including 63 ANA <strong>and</strong> 35 ANP locati<strong>on</strong>s), increase oversight at these locati<strong>on</strong>s, <strong>and</strong>track m<strong>on</strong>thly fuel orders <strong>and</strong> storage capacity informati<strong>on</strong> in a fuel locati<strong>on</strong> spreadsheet. While theseare positive acti<strong>on</strong>s, additi<strong>on</strong>al acti<strong>on</strong>s are needed to develop accurate fuel requirements. Specifically,for CSTC‐A to develop accurate ANA fuel requirements, it needs to identify informati<strong>on</strong> <strong>on</strong> the ANAlocati<strong>on</strong>s authorized to receive fuel deliveries <strong>and</strong> associated fuel c<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> usage data.CSTC‐A LACKS ACCURATE INFORMATION ON ANA FUEL PURCHASED, DELIVERED, ANDCONSUMEDNo single office within the U.S. or <strong>Afghan</strong> government—including CSTC‐A’s fuel ordering office, theKabul Regi<strong>on</strong>al C<strong>on</strong>tracting Center, or MOD’s Logistics Comm<strong>and</strong> Materials Management Center‐<strong>Army</strong>(MMC‐A)—has complete records <strong>on</strong> ANA fuel purchased, ordered, delivered, <strong>and</strong> c<strong>on</strong>sumed, therebylimiting CSTC‐A’s ability to fully account for POL provided to the <strong>Afghan</strong> <strong>Army</strong>. We identified thefollowing problems: CSTC‐A did not have any records of fuel purchase <strong>and</strong> payment informati<strong>on</strong> prior to March 2011because, according to CSTC‐A, all ANA POL financial records totaling nearly $475 milli<strong>on</strong> fromfiscal year 2007 to February 2011 had been shredded in violati<strong>on</strong> of DOD <strong>and</strong> Department ofthe <strong>Army</strong> policies. 8 It also did not have records or practices in place to fully account for fuelc<strong>on</strong>sumpti<strong>on</strong> <strong>on</strong>ce vendors delivered the fuel directly to ANA locati<strong>on</strong>s. In June 2012, CSTC‐Awas able to rec<strong>on</strong>cile the ANA fuel purchases with payments between March 2011 to March2012, but still could not account for fuel c<strong>on</strong>sumpti<strong>on</strong>.C<strong>on</strong>trols over fuel ordering are not effective to ensure that the MMC‐A is aware of all fuelordered <strong>and</strong> whether any ANA unit receives more than its authorized allocati<strong>on</strong>. MOD guidance8 On September 10, 2012, we noted this acti<strong>on</strong> in a letter to the Secretary of Defense <strong>and</strong> the Comm<strong>and</strong>ingGeneral, NTM‐A/CSTC‐A, am<strong>on</strong>g others, <strong>and</strong> str<strong>on</strong>gly recommended that DOD look into the causes <strong>and</strong>circumstances of the reported shredding.SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 4


equires ANA units <strong>and</strong> power plants to (1) prepare MOD Form 14s for all fuel ordered throughregi<strong>on</strong>al <strong>and</strong> nati<strong>on</strong>al depots <strong>and</strong> (2) submit forms to MMC‐A for validati<strong>on</strong> <strong>and</strong> approval toensure that fuel orders do not exceed authorized allocati<strong>on</strong>s. However, ANA power plants <strong>and</strong>some ANA units did not use MOD Form 14, <strong>and</strong> CSTC‐A ordered fuel directly from vendors forunits without informing or providing fuel orders to MMC‐A for approval.CSTC‐A pays vendors without independent verificati<strong>on</strong> of the quantity <strong>and</strong> quality of fueldelivered. Fuel ordering officers ordered fuel, prepared receiving reports for payment (DD Form250), <strong>and</strong> certified the quantity <strong>and</strong> quality received by the units without the required MODForms 8 <strong>and</strong> 9, which were needed to validate delivery tickets.CSTC‐A did not track or rec<strong>on</strong>cile delivered amounts with the amounts that ANA issued, stored,<strong>and</strong> c<strong>on</strong>sumed, as required to be reported by MOD Form 32. As a result, CSTC‐A cannot identifyvariances to determine potential theft.Fuel vendors did not always comply with the requirements set forth in the fuel blanket purchaseagreements used by CSTC‐A. For example, vendors did not always provide required fuel qualityreports, <strong>and</strong> vendor delivery tickets that accompanied invoices for payment did not alwaysinclude the informati<strong>on</strong> needed to verify the quantity delivered.CONCLUSIONSCSTC‐A’s current transiti<strong>on</strong> plans call for transferring logistics resp<strong>on</strong>sibility to the ANA beginningJanuary 1, 2013. However, based <strong>on</strong> our review to date, CSTC‐A does not have accurate or supportableinformati<strong>on</strong> <strong>on</strong> how much U.S. funds are needed for ANA fuel, where <strong>and</strong> how the fuel is actually used,or how much fuel has been lost or stolen. Thus, the extent to which ANA fuel is in stock, c<strong>on</strong>sumed, orlost at any given time remains unknown. Despite these significant weaknesses, CSTC‐A proposes toincrease future ANA POL funding levels through direct ASFF c<strong>on</strong>tributi<strong>on</strong>s. Before investing additi<strong>on</strong>alresources <strong>and</strong> transferring fuel resp<strong>on</strong>sibilities to the <strong>Afghan</strong> government, CSTC‐A must developaccurate <strong>and</strong> supportable ANA fuel requirements <strong>and</strong> address outst<strong>and</strong>ing fuel accountability issues.RECOMMENDATIONS1. SIGAR recommends that the Comm<strong>and</strong>ing General, NTM‐A/CSTC‐A, reduce current (fiscal year2013) <strong>and</strong> planned (fiscal years 2014‐2018) ASFF budget requests for ANA fuel requirements tothe currently budgeted amount of $306 milli<strong>on</strong> for fiscal year 2012, which excludes $123 milli<strong>on</strong>for jet fuel <strong>and</strong> kerosene that was previously purchased with ASFF funds but is expected to befunded by internati<strong>on</strong>al d<strong>on</strong>ors in fiscal year 2013 <strong>and</strong> bey<strong>on</strong>d. The fiscal year 2012 ASFFamount budgeted should be maintained until a suitable method <strong>and</strong> systematic process forcalculating <strong>and</strong> developing an accurate projected amount is developed for ANA fuelrequirements using valid <strong>and</strong> supportable fuel c<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> usage data. Relevant factors tobe c<strong>on</strong>sidered include the number of vehicles <strong>and</strong> generators currently in use <strong>and</strong> c<strong>on</strong>sumingfuel instead of the number in inventory or authorized; listing of <strong>and</strong> storage capacity for eachdepot, power plant, <strong>and</strong> other site authorized to receive fuel directly from vendors; <strong>and</strong> short<strong>and</strong>l<strong>on</strong>g‐term c<strong>on</strong>sumpti<strong>on</strong> needs of power plants <strong>and</strong> fuel usage rates for in‐use vehicles <strong>and</strong>generators to meet the ANA missi<strong>on</strong>.SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 5


inc<strong>on</strong>sistencies in power c<strong>on</strong>sumpti<strong>on</strong> due to seas<strong>on</strong>al changes, <strong>and</strong> uncertainties in fuel c<strong>on</strong>sumpti<strong>on</strong>as coaliti<strong>on</strong> forces withdraw from <strong>Afghan</strong>istan <strong>and</strong> transfer resp<strong>on</strong>sibility to the ANSF. However, CSTC‐Adid not provide specific documentati<strong>on</strong> to support how these factors affect its annual estimates <strong>and</strong> itsasserti<strong>on</strong>s that increased funding is necessary. Increasing fuel estimates based <strong>on</strong> prior fuel purchasesor anticipated fuel expenditures–without having actual fuel c<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> usage data or supportablefuel requirements–is not prudent. In additi<strong>on</strong>, CSTC‐A did not commit the first $40 milli<strong>on</strong> of the fiscalyear 2012 ANA POL funds until July 2012—more than 9 m<strong>on</strong>ths into the current fiscal year—whichfurther calls into questi<strong>on</strong> whether a budget increase in ANA fuel for fiscal year 2013 is warranted,especially given expected d<strong>on</strong>ati<strong>on</strong>s by internati<strong>on</strong>al d<strong>on</strong>ors for jet fuel <strong>and</strong> kerosene. C<strong>on</strong>sequently, wereiterate our recommendati<strong>on</strong> to maintain ANA POL funding levels for ASFF at $306 milli<strong>on</strong> until a validmethod is established <strong>and</strong> annual fuel funding levels are calculated based <strong>on</strong> actual ANA fuelc<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> supportable fuel requirements.C<strong>on</strong>cerning recommendati<strong>on</strong> two, NTM‐A/CSTC‐A c<strong>on</strong>curred with <strong>and</strong> was generally resp<strong>on</strong>sive to allfour parts of this recommendati<strong>on</strong>. NTM‐A/CSTC‐A described some specific acti<strong>on</strong>s to improve c<strong>on</strong>trolsover fuel purchases, vendor deliveries, <strong>and</strong> the payment of invoice amounts. However, these acti<strong>on</strong>s d<strong>on</strong>ot fully address the lack of c<strong>on</strong>trols over fuel ordering to ensure that ANA units do not receive morethan their authorized allocati<strong>on</strong> or n<strong>on</strong>compliance with MOD guidance c<strong>on</strong>cerning the accountability offuel after vendor deliveries to ANA locati<strong>on</strong>s. As a result, we reiterate the need to identify acti<strong>on</strong>s toensure that MOD guidance is followed <strong>and</strong> all fuel activity is tracked <strong>and</strong> accounted for.SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 7


February 2012 to July 2012, in accordance with generally accepted government auditing st<strong>and</strong>ards.Those st<strong>and</strong>ards require that we plan <strong>and</strong> perform the audit to obtain sufficient, appropriate evidenceto provide a reas<strong>on</strong>able basis for our findings <strong>and</strong> c<strong>on</strong>clusi<strong>on</strong>s based <strong>on</strong> our audit objectives. We believethat the evidence obtained provides a reas<strong>on</strong>able basis for our findings <strong>and</strong> c<strong>on</strong>clusi<strong>on</strong>s based <strong>on</strong> ouraudit objectives.SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 9


APPENDIX II–ABBREVIATIONS AND ACRONYMSAcr<strong>on</strong>ymANAANSFASFFCSTC‐ADODDCOM‐SPOMMC‐AMODNTMAPOLDescripti<strong>on</strong><strong>Afghan</strong> Nati<strong>on</strong>al <strong>Army</strong><strong>Afghan</strong> Nati<strong>on</strong>al Security Forces<strong>Afghan</strong>istan Security Forces FundCombined Security Transiti<strong>on</strong> Comm<strong>and</strong>‐<strong>Afghan</strong>istanDepartment of DefenseDeputy Comm<strong>and</strong>er–Special Plans <strong>and</strong> Operati<strong>on</strong>sMaterial Management Center‐<strong>Army</strong>Ministry of DefenseNATO Training Missi<strong>on</strong>‐<strong>Afghan</strong>istan<strong>Petroleum</strong>, oil, <strong>and</strong> lubricantsSIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 10


APPENDIX III–NTM‐A/CSTC‐A RESPONSE TO DRAFT INTERIM REPORT1&\~REPI.VTOATrt:NTIOX OFDEPARTMENT O F DEFENSENATO TRAINI 'G MISSION-AFGHANISTANCOMBINED SECURITY TRANSITION COMMAND-AFGHANISTANKABIJl ,AFGHANISTANAI'O AE 09356jJ...._ NIM- i\~r =-HA~JI !fdlNTM-A/CSTC-A DCOM-SPO 14 August 2012MEMoRANDuM T HRU Deputy Comm<strong>and</strong>ing General- Operati<strong>on</strong>s, NTM-A, APO AE 09356"' .1 ~United States Forces- <strong>Afghan</strong>istan (CJIG), APO AE 09356 UJUnited States Central Comm<strong>and</strong> (CCIG), MacDill AFB, FL 33621A~ ,'J-FOR:Office of the Special Inspector General for <strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong>2530 Crystal Drive, Arlingt<strong>on</strong>, VA 22202SUBJECT: NTM-A/CSTC-A Resp<strong>on</strong>se to the Draft <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> " <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> <strong>on</strong> <strong>Afghan</strong> Nati<strong>on</strong>al<strong>Army</strong> <strong>Petroleum</strong>, <strong>Oil</strong>, <strong>and</strong> <strong>Lubricants</strong>" (SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14)REFERENCE: Draft <str<strong>on</strong>g>Report</str<strong>on</strong>g>, Office of the Special Inspector General for <strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong>(SIGAR).I. The purpose of this memor<strong>and</strong>um is to provide resp<strong>on</strong>ses to SIGAR's draft interim report.2. Point of c<strong>on</strong>tact for th is acti<strong>on</strong> is Col John V. McCoy at DSN 318-237-9858, or via e-mail atjohn. v .McCoy@afghan.swa.army.mi I.Enclosure:NTM-A/CSTC-A Resp<strong>on</strong>se to Draft <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g>SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 11


NTM-AJCSTC-A DCOM-SPOSUBJECT: NTM-NCSTC-A Resp<strong>on</strong>se to the Draft <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> "<str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> <strong>on</strong> <strong>Afghan</strong> Nati<strong>on</strong>al<strong>Army</strong> <strong>Petroleum</strong>, <strong>Oil</strong>, <strong>and</strong> <strong>Lubricants</strong>" (SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14)Generalffechnical Comments <strong>on</strong> the Draft <str<strong>on</strong>g>Interim</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> (if warranted).I. Recommendati<strong>on</strong> I, Page 5, states:"SIGAR recommends that the Comm<strong>and</strong>er, CSTC-A, reduce current (fiscal year 20 13) <strong>and</strong> planned(fiscal years 2014-20 18) ASFF budget requests for ANA fuel requirements to the currently budgetedamount of $306 millio n for fiscal year 2012, which excludes $123 milli<strong>on</strong> for jet fuel <strong>and</strong> kerosene thatwas purchased with ASFF funds but is expected to be funded by internati<strong>on</strong>al d<strong>on</strong>ors in fiscal year 2013<strong>and</strong> bey<strong>on</strong>d. The fiscal year 2012 ASFF amount budgeted should be maintained until a suitable method<strong>and</strong> systematic process for calculating <strong>and</strong> developing accurate projected amount is developed for ANAfuel requirements using valid <strong>and</strong> supportable fuel c<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> usage data. Relevant factors to bec<strong>on</strong>sidered include the number of vehicles <strong>and</strong> generators currently in use <strong>and</strong> c<strong>on</strong>suming fuel instead ofthe number in inventory or authorized; listing of <strong>and</strong> storage capacity for each depot, power plant, <strong>and</strong>other site authorized to receive fuel directly from vendors; <strong>and</strong> short- <strong>and</strong> l<strong>on</strong>g-term c<strong>on</strong>sumpti<strong>on</strong> needs ofpower plants <strong>and</strong> fuel usage rates for in-use vehicles <strong>and</strong> generators to meet the ANA missi<strong>on</strong>."NTM-AICSTC-A : NTM-A resp<strong>on</strong>se: NON-CONCURS with SIGAR recommendati<strong>on</strong> to reduce amount ofcoaliti<strong>on</strong>-supplied fuel/fuel funding. Current funding levels, although c<strong>on</strong>trary to SIGARrecommendati<strong>on</strong>s, must be maintained to sustain current military operati<strong>on</strong>s. FY20 12 fuel expendituresare anticipated to be approximately $480 milli<strong>on</strong>. If fuel expenditures are capped at $306 milli<strong>on</strong>, thatwill result in a redu.cti<strong>on</strong> of approximately 37% for all security operati<strong>on</strong>s to include combat operati<strong>on</strong>s,logistical operati<strong>on</strong>s, <strong>and</strong> border enforcement patrols. Fuel c<strong>on</strong>sumpti<strong>on</strong> estimates for vehicle usagecannot be determined accurately by NTM-A due to the c<strong>on</strong>tinuing fielding of vehicles, power generati<strong>on</strong>,<strong>and</strong> other combusti<strong>on</strong> engine power equipment to the ANSF. Since 2010, coaliti<strong>on</strong> forces have issuedover 25,000 vehicles <strong>and</strong> generators to the ANSF. The fielding of this equipment has resulted in greaterfuel support requirements, thus causing <strong>and</strong> projecting <strong>on</strong> increase of fuel usage. Fuel usage associatedwith power generati<strong>on</strong> at power plants is more c<strong>on</strong>sistent, with power c<strong>on</strong>sumpti<strong>on</strong> changes according toseas<strong>on</strong>al usage. During fiscal year 2012 six power generati<strong>on</strong> plants have o~ are scheduled to come<strong>on</strong>line. Coupled with the fact that the 2011 -1 2 winter seas<strong>on</strong> was unusually severe with colder-thannormaltemperatures, fuel c<strong>on</strong>sumpti<strong>on</strong> spiked to nearly 50% of all diesel fuel c<strong>on</strong>sumed during thewinter m<strong>on</strong>ths. As coaliti<strong>on</strong> forces withdraw from <strong>Afghan</strong>istan <strong>and</strong> the ANSF takes <strong>on</strong> greaterresp<strong>on</strong>sibility for security, ANSF fuel c<strong>on</strong>sumpti<strong>on</strong> wi ll c<strong>on</strong>tinue to increase. This increase inOPTEMPO has resulted in greater fuel c<strong>on</strong>sumpti<strong>on</strong>.2. Recommendati<strong>on</strong> 2, Pages 5-6, states: "To mitigate vulnerabilities to fraud <strong>and</strong> waste, S1GARrecommends that the Comm<strong>and</strong>er, CSTC-A, develop, approve, <strong>and</strong> implement a comprehensive acti<strong>on</strong>plan, focusing <strong>on</strong> specific internal c<strong>on</strong>trol processes to verify fuel purchases <strong>and</strong> deliveries <strong>and</strong> improveoverall fuel accountability. Account for all fuel orders in CSTC-A 's fuel ordering office database <strong>and</strong>Kabul Regi<strong>on</strong>al C<strong>on</strong>tracting Center reports, <strong>and</strong> rec<strong>on</strong>cile fuel orders between offices <strong>and</strong> to bothquantities delivered <strong>and</strong> invoices paid every m<strong>on</strong>th."NTM-AICSTC-A resp<strong>on</strong>se: NTM-A CONCURS. In resp<strong>on</strong>se to SIGAR's recommendati<strong>on</strong>s made in Mayof2012, NTM-A has, or is currently implementing the following internal c<strong>on</strong>trols:(I) M<strong>on</strong>thly rec<strong>on</strong>ciliati<strong>on</strong> of invoices is being c<strong>on</strong>ducted to ensure accuracy. Incomplete orinaccurate invoices are returned to the vendor for correcti<strong>on</strong>s or modificati<strong>on</strong>s by Phoenix Regi<strong>on</strong>alC<strong>on</strong>tracting Comm<strong>and</strong> (PRCC).SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 12


NTM-A/CSTC-A DCG OPSSUBJECT: Transiti<strong>on</strong> of Fuel Funding <strong>and</strong> Acquisiti<strong>on</strong> Resp<strong>on</strong>sibilities to the <strong>Afghan</strong> Nati<strong>on</strong>al<strong>Army</strong>(2) Fuel Database: Logistics Operati<strong>on</strong>s, Fuel Secti<strong>on</strong> is currently working to develop a newfuel database that will utilize a st<strong>and</strong>ard unit listing c<strong>on</strong>venti<strong>on</strong> to prevent err<strong>on</strong>eous data entries.The use of a unique Unit Identificati<strong>on</strong> Code or UIC will further prevent errors in data entry.Database will be used as the template for fuel operati<strong>on</strong>s transiti<strong>on</strong> to ANSF fuel operati<strong>on</strong>spers<strong>on</strong>nel.(3) Coaliti<strong>on</strong> Fuel C<strong>on</strong>tracts: A new fuel c<strong>on</strong>tract wi ll be put into place <strong>on</strong> 1 November 2012.The new c<strong>on</strong>tract wi ll focus <strong>on</strong> higher fuel quality st<strong>and</strong>ards to prevent fuel c<strong>on</strong>taminati<strong>on</strong>, m<strong>and</strong>atefuel testing to ensure purity of fuel, eliminate water or solid particle c<strong>on</strong>taminati<strong>on</strong>. Improvedc<strong>on</strong>trols for the use of subc<strong>on</strong>tractors by vendors. Subc<strong>on</strong>tractors will be required to perform allc<strong>on</strong>tracted tasks to same st<strong>and</strong>ards as primary c<strong>on</strong>tractor. Use of seals for valves <strong>and</strong> hatches toprevent access to fuel while in transit. Incorporati<strong>on</strong> of c<strong>on</strong>tractual penalties for poor performance orviolati<strong>on</strong>s of the c<strong>on</strong>tract. Failure to adhere to c<strong>on</strong>tract st<strong>and</strong>ards may result in m<strong>on</strong>etary penalties orterminati<strong>on</strong> of c<strong>on</strong>tact for failure to perform.(4) Investigati<strong>on</strong> or "vetting" of all potential c<strong>on</strong>tractors is c<strong>on</strong>ducted by Phoenix Regi<strong>on</strong>alC<strong>on</strong>tracting Comm<strong>and</strong> prior to the hiring of a c<strong>on</strong>tractor. Periodic reviews are c<strong>on</strong>ducted to ensurevendors compliance. Within the last 12 m<strong>on</strong>ths, PRCC has identified (3) fuel vendors that have beenlinked to corrupti<strong>on</strong> or have been identified as having insurgent ties <strong>and</strong> as a result has terminatedtheir c<strong>on</strong>tracts to provide fuel to the ANSF.(5) Improved c<strong>on</strong>trols. NTM-A is planning to reduce the number of coaliti<strong>on</strong>-authorized fueldelivery sites from approximately 326 sites to 98 sites in order to maximize coaliti<strong>on</strong> oversight atremaining sites. NTM-A is putting in place fuel metering <strong>and</strong> testing requirements at all enduringlocati<strong>on</strong>s. NTM-A has received fifty fuel meters <strong>and</strong> two hundred field fuel test kits are due inshortly. Through c<strong>on</strong>tracted trainers, ANSF pers<strong>on</strong>nel will be providing additi<strong>on</strong>al training <strong>on</strong>proper receiving, testing <strong>and</strong> reporting procedures.3. Recommendati<strong>on</strong> 2, states: "Ensure that MOD Form 14 is used for all ANA fuel orders, including forpower plants, <strong>and</strong> copies of all fuel orders are submitted to MMC-A to enable the complete accountabilityfor all fuel orders <strong>and</strong> to track them against allocati<strong>on</strong>s."NTM-A!CSTC-A resp<strong>on</strong>se: NTM-A CONCURS. In accordance with NTM-A llragmentary Order # 12-076 issued May 2012: Logistical Training <strong>and</strong> Advisor Teams (L TAT's) collect <strong>and</strong> submit MoD Form14's to the NTM-A Class-III Fuel Office for review <strong>and</strong> records. To further improve compliance, theNTM-A DCOM-SPO Log Ops CLIII Secti<strong>on</strong> wi ll c<strong>on</strong>duct training for the c<strong>on</strong>tracted fuel experts in eachregi<strong>on</strong> to ensure they are fully versed in the collecti<strong>on</strong> <strong>and</strong> forwarding process. Additi<strong>on</strong>ally, the LTATadvisors will advise <strong>and</strong> assist their <strong>Afghan</strong> counterparts in the producti<strong>on</strong> <strong>and</strong> transmissi<strong>on</strong> of therequired Mod-14s. The the DCOM-SPO Log Ops CUll Secti<strong>on</strong> will also m<strong>on</strong>itor LTAT compliancewith the FRAGO <strong>and</strong> implement corrective acti<strong>on</strong> with the L TATs as required.SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 13


NTM-NCSTC-A DCG OPSSUBJECT: Transiti<strong>on</strong> of fuel Funding <strong>and</strong> Acquisiti<strong>on</strong> Resp<strong>on</strong>sibilities to the <strong>Afghan</strong> Nati<strong>on</strong>al<strong>Army</strong>4. Recommendati<strong>on</strong> 2, states: "Ensure that MOD F<strong>on</strong>ns 8 <strong>and</strong> 9 are used to document the receipt <strong>and</strong>issuance of all fuel deliveries to ANA, <strong>and</strong> copies of all MOD Forms 8 <strong>and</strong> 9 are submitted to (I) CSTC­A to compare with vendor delivery tickets <strong>and</strong> verify the fuel quantities received <strong>and</strong> (2) MMC-A tocompare with the respective MOD F<strong>on</strong>n 14 <strong>and</strong> veri fy receipts for each fuel order."NTM-AICSTC-A resp<strong>on</strong>se: NTM-A CONCURS. In accordance with NTM-A Fragmentary Order #12-076 issued May 20 12: Logistical Training <strong>and</strong> Advisor Teams (LTAT's) are required to collect <strong>and</strong>submit MoD F<strong>on</strong>n 8 <strong>and</strong> F<strong>on</strong>n 9 to the NTM-A Class-Ill Fuel Office for review <strong>and</strong> records. To furtherimprove· compliance, the NTM-A DCOM-SPO Log Ops CLIJI Secti<strong>on</strong> will c<strong>on</strong>duct training for thec<strong>on</strong>tracted fuel experts in each regi<strong>on</strong> to ensure they are fully versed in the collecti<strong>on</strong> <strong>and</strong> forwardingprocess. Additi<strong>on</strong>ally, the L TAT advisors will advise <strong>and</strong> assist their <strong>Afghan</strong> counterparts in theproducti<strong>on</strong> <strong>and</strong> transmissi<strong>on</strong> of the required MoD F<strong>on</strong>ns 8 <strong>and</strong> F<strong>on</strong>ns 9. The DCOM-SPO Log OpsCLIII Secti<strong>on</strong> will also m<strong>on</strong>itor L TAT compliance with the FRAGO <strong>and</strong> implement corrective acti<strong>on</strong>with the L TATs as required.5. Recommendati<strong>on</strong> 2, states: "Ensure that MOD F<strong>on</strong>n 32 is used m<strong>on</strong>thly to account for, rec<strong>on</strong>cile, <strong>and</strong>report c<strong>on</strong>sumpti<strong>on</strong> <strong>and</strong> variances of all fuel distributed to each ANA locati<strong>on</strong> <strong>and</strong> copies are submitted toCSTC-A <strong>and</strong> MMC-A to enable the c<strong>on</strong>solidati<strong>on</strong> of fuel reports to have complete inf<strong>on</strong>nati<strong>on</strong> <strong>on</strong> fuelafter delivery. This will also fac ilitate improved reporting of variances to ensure follow up <strong>and</strong> resoluti<strong>on</strong>of any inventory discrepancies."NTM-AICSTC-A resp<strong>on</strong>se: NTM-A CONCURS. In accordance with NTM-A Fragmentary Order # 12-076 issued May 2012: Logistical Training <strong>and</strong> Advisor Teams (LTAT's) are required to collect <strong>and</strong>submit MoD F<strong>on</strong>n 32 to the NTM-A Class-Ill Fuel Office for review <strong>and</strong> records. To further improvecompliance, the NTM-A DCOM-SPO Log Ops CLIU Secti<strong>on</strong> will c<strong>on</strong>duct training for the c<strong>on</strong>tracted fuelexperts in each regi<strong>on</strong> to ensure they are fu lly versed in the collecti<strong>on</strong> <strong>and</strong> forwarding process.Additi<strong>on</strong>ally, the L TAT advisors will advise <strong>and</strong> assist their <strong>Afghan</strong> counterparts in the producti<strong>on</strong> <strong>and</strong>transmissi<strong>on</strong> of the required MoD Form 32s. The DCOM-SPO Log Ops CLIII Secti<strong>on</strong> will also m<strong>on</strong>itorLTAT compliance with the FRAGO <strong>and</strong> implement corrective acti<strong>on</strong> with the L TATs as required.APPROVED BY:John Y. McCoyCOL,NTM-AChief, Logistics Operati<strong>on</strong>sPREPARED BY:Dennis SlevaMAJ,NTM-AC lass-Ill Fuel Officer, DSN 318-237-0354SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 14


(This interim report was c<strong>on</strong>ducted under the audit project code SIGAR 054A.)SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 15


SIGAR’s Missi<strong>on</strong>The missi<strong>on</strong> of the Special Inspector General for<strong>Afghan</strong>istan Rec<strong>on</strong>structi<strong>on</strong> (SIGAR) is to enhanceoversight of programs for the rec<strong>on</strong>structi<strong>on</strong> of<strong>Afghan</strong>istan by c<strong>on</strong>ducting independent <strong>and</strong> objectiveaudits, inspecti<strong>on</strong>s, <strong>and</strong> investigati<strong>on</strong>s <strong>on</strong> the use oftaxpayer dollars <strong>and</strong> related funds. SIGAR works toprovide accurate <strong>and</strong> balanced informati<strong>on</strong>, evaluati<strong>on</strong>s,analysis, <strong>and</strong> recommendati<strong>on</strong>s to help the U.S. C<strong>on</strong>gress,U.S. agencies, <strong>and</strong> other decisi<strong>on</strong>-makers to makeinformed oversight, policy, <strong>and</strong> funding decisi<strong>on</strong>s toimprove effectiveness of the overall rec<strong>on</strong>structi<strong>on</strong>strategy <strong>and</strong> its comp<strong>on</strong>ent programs;improve management <strong>and</strong> accountability over fundsadministered by U.S. <strong>and</strong> <strong>Afghan</strong> agencies <strong>and</strong> theirc<strong>on</strong>tractors;improve c<strong>on</strong>tracting <strong>and</strong> c<strong>on</strong>tract managementprocesses;prevent fraud, waste, <strong>and</strong> abuse; <strong>and</strong>advance U.S. interests in rec<strong>on</strong>structing<strong>Afghan</strong>istan.Obtaining Copies of SIGAR<str<strong>on</strong>g>Report</str<strong>on</strong>g>s <strong>and</strong> Testim<strong>on</strong>iesTo <str<strong>on</strong>g>Report</str<strong>on</strong>g> Fraud, Waste, <strong>and</strong>Abuse in <strong>Afghan</strong>istanRec<strong>on</strong>structi<strong>on</strong> ProgramsTo obtain copies of SIGAR documents at no cost, go toSIGAR’s web site (www.sigar.mil). SIGAR posts allpublically released reports, testim<strong>on</strong>ies, <strong>and</strong>corresp<strong>on</strong>dence <strong>on</strong> its web site.To help prevent fraud, waste, <strong>and</strong> abuse by reportingallegati<strong>on</strong>s of fraud, waste, abuse, mismanagement, <strong>and</strong>reprisal c<strong>on</strong>tact SIGAR’s hotline: Web: www.sigar.mil/fraud Email: sigar.pentag<strong>on</strong>.inv.mbx.hotline@mail.mil Ph<strong>on</strong>e <strong>Afghan</strong>istan: +93 (0) 700-10-7300 Ph<strong>on</strong>e DSN <strong>Afghan</strong>istan 318-237-3912 ext. 7303 Ph<strong>on</strong>e Internati<strong>on</strong>al: +1-866-329-8893 Ph<strong>on</strong>e DSN Internati<strong>on</strong>al: 312-664-0378 U.S. fax: +1-703-601-4065Public AffairsPublic Affairs OfficerPh<strong>on</strong>e: 703-545-5974Email: sigar.pentag<strong>on</strong>.ccr.mbx.public-affairs@mail.milMail: SIGAR Public Affairs2530 Crystal DriveArlingt<strong>on</strong>, VA 22202SIGAR <str<strong>on</strong>g>Interim</str<strong>on</strong>g> ANA POL <str<strong>on</strong>g>Report</str<strong>on</strong>g> 12-14 Page 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!