11.07.2015 Views

Sustainability r e p o r t - Sabesp

Sustainability r e p o r t - Sabesp

Sustainability r e p o r t - Sabesp

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Clean Wave Program construction in Caraguatatuba, North Shore. Fixing pipes of the Tietê 15 interceptor, São Paulo East End.Onda Limpa Litoral Norte (North ShoreClean Wave)EC9 This program will increase sewage collection and treatment in the northshare, to the benefit of approximately 600,000 people in the cities of SãoSebastião, Ilhabela, Ubatuba and Caraguatatuba. Up to 2015, the program willheighten the region’s sewage collection and treatment from 36 to 88 percent,improving the population’s health and well-being, and leveraging economicdevelopment by increasing the region’s tourist flows.Investments of approximately R$480 million include the construction of 390kilometers of collection systems, sewage mains, interceptors and outfalls,26,000 new household connections, 155 sewage lift stations, and 15 sewagetreatment plants, as well as a sea outfall, laid in May 2009, and the IlhabelaWastewater Pretreatment Plant.Água no Litoral (Coastal Region Water)The purpose of this program is to ensure the supply of treated water to thepopulation residing in all São Paulo State coastal cities served by <strong>Sabesp</strong>, and theseasonal population, mainly the population visiting the region during the summer,to reduce demand pressures during the peak season. It will benefit approximately3.7 million people.The program provides for investments in production expansion, treated water qualityimprovement, increasing water transmission and storage capacity, distributionsystem expansion, and increase in the number of household connections.In 2009, we started the construction works of the Jurubatuba Water TreatmentPlant (WTP), in Guarujá; the Mambú-Branco WTP, in Itanhaém; and the Melvi-Boqueirão watermain, in Praia Grande. We have also redirected the Itu Systemwatermain, started the construction of the Itu WTP, in São Vicente, published theTender Notice to build the Melvi WTP, in Praia Grande, and resume the constructionof the Antas WTP, in Mongaguá, with budgeted investments of R$428 million.Project TietêProject Tietê is focused on improving better water quality in the Tietê RiverBasin, São Paulo Metropolitan Region, by expanding the wastewater collectionand treatment infrastructure. The project was started in 1992 and involvesinvestments totaling US$2.5 billion, divided into three phases.The first two phases of the program increased wastewater collection in theSão Paulo Metropolitan Area (RMSP) from 70 to 84 percent, and wastewatertreatment leaped from 24 to 70 percent. These actions a significant reduction inthe pollution level in River Tietê, downstream the São Paulo Metropolitan Areaand the pollution load on the Billings dam watershed.In 2009, we took important steps for the third stage of Project Tietê. Theobjective of this stage is to increase the collection rate to 87 percent and thetreatment rate 84 to percent by 2015.The following works were considered to fulfill these goals: (i) 580 km of collectorsand interceptors, (ii) 1,250 km of collection system, and (iii) 200,000 householdconnections. These actions will benefit 1.5 million people with collection servicesand 3 million with sewage treatment services.Expected to last six years, the investment during this phase is estimated atUS$1.05 billion, of which US$600 million come from Inter American DevelopmentBank (IADB) financing, US$200 million from <strong>Sabesp</strong>, and US$205 million fromother funding sources.In 2009, the IADB approved a loan to <strong>Sabesp</strong> that will allow us to start thetenders of Phase 3 works. For 2010, we expect starting the construction ofanother 240 Km of sewage mains and almost 400 km of pipes, and the publicationof the tender notices for the expansion of the sewage treatment plants.38 Relatório de Sustentabilidade 2009 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!