The decision of forming a Task Group (TG) on “Strategy” within the CCT was taken at the 24 th meeting in 2008, and the TG was initially formed by: F. Pavese (Chair), G. Machin (NPL) and H. Ugur (President of CCT). � This initial group started its activities on October 2008 on input documents of the CCT President, namely concerning the CIPM strategy on science priorities of the BIPM (meeting of 14 October 2008). � A ToR to exploit its duty, including the rules for membership was adopted. The ToR has defined a roadmap to arrive at a CCT strategy and to apply it in four steps: � Development of CCT mission to be approved by CIPM, � Development of the methodology for setting up the CCT strategy, � SWOT analysis, � Development of the CCT Strategy using the methodology developed and outcome of SWOT Analysis.

The first step was completed in 2010. A draft of the CCT Mission was prepared by the Task Group. CCT, in its 25th meeting (May 2010), discussed and accepted the CCT Mission. CIPM, in its 2010 meeting, approved the CCT mission. Second step is going on. A draft for the methodology in order to develop CCT Strategy was prepared by the Task Group and circulated for comments.

The decision of forming a Task Group (TG) on “Strategy” within<br />

the <strong>CCT</strong> was taken at the 24 th meeting in 2008, and the TG was<br />

initially formed by: F. Pavese (Chair), G. Machin (NPL) and H.<br />

Ugur (President of <strong>CCT</strong>).<br />

� This initial group started its activities on Oc<strong>to</strong>ber 2008 on input<br />

documents of the <strong>CCT</strong> President, namely concerning the CIPM<br />

strategy on science priorities of the <strong>BIPM</strong> (meeting of 14 Oc<strong>to</strong>ber<br />

2008).<br />

� A ToR <strong>to</strong> exploit its duty, including the rules for membership was<br />

adopted. The ToR has defined a roadmap <strong>to</strong> arrive at a <strong>CCT</strong> strategy<br />

and <strong>to</strong> apply it in four steps:<br />

� Development of <strong>CCT</strong> mission <strong>to</strong> be approved by CIPM,<br />

� Development of the methodology for setting up the <strong>CCT</strong> strategy,<br />

� SWOT analysis,<br />

� Development of the <strong>CCT</strong> Strategy using the methodology developed and<br />

outcome of SWOT Analysis.