Chapter 4<br />

approximately EUR 1000/t annual Cl2 capacity. The investment costs <strong>for</strong> a conversion thus<br />

represent 20 – 60 % <strong>of</strong> <strong>the</strong> investment costs <strong>of</strong> a new plant [ 232, Euro <strong>Chlor</strong> 2010 ].<br />

Table 4.5: Investment costs <strong>for</strong> <strong>the</strong> conversion <strong>of</strong> a mercury cell plant with a chlorine capacity<br />

<strong>of</strong> 100 kt/yr and a design current density <strong>of</strong> 5 kA/m 2<br />

Cost object<br />

Investment costs<br />

in EUR/t annual Cl2 capacity<br />

Minimum Maximum<br />

Cell room and electric supply (5 kA/m 2 ) 69 227<br />

Peripherals (electrolytes circuits) 10 16<br />

Caustic concentration (3 effects)<br />

Intermediate buffer tank<br />

Brine circuit<br />

Polishing filters<br />

Hardness removal<br />

Dechlorination<br />

<strong>Chlor</strong>ate removal<br />

Sulphate removal<br />

33 50<br />

10<br />

<strong>Chlor</strong>ine circuit (liquefaction) 27<br />

Hydrogen cooling 2<br />

Cooling water 7<br />

Total <strong>for</strong> equipment and installation 140 403<br />

Engineering 36 51<br />

Proratable and start-up costs 10 28<br />

Miscellaneous (10 %) 18 45<br />

Escalation and financial costs 10 26<br />

Total conversion 214 553<br />

NB: Costs <strong>for</strong> decommissioning <strong>of</strong> <strong>the</strong> old mercury cell plant and costs <strong>for</strong> replacement or<br />

refurbishing <strong>of</strong> o<strong>the</strong>r equipment are not included.<br />

Source: [ 232, Euro <strong>Chlor</strong> 2010 ]<br />

A conversion from mercury cells to membrane technology is presented in Table 4.7 and a<br />

comparison <strong>of</strong> reported conversion costs is presented in Table 4.8.<br />

WORKING DRAFT IN PROGRESS<br />

Table 4.6 shows examples <strong>of</strong> investment costs ranging from EUR 190 – 670/t annual Cl2<br />

capacity <strong>for</strong> conversions carried out between 1992 and 2009.<br />

156 December 2011 TB/EIPPCB/CAK_Draft_1<br />

11<br />

14<br />

3<br />

15<br />

20<br />

4<br />

10<br />