11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractii)SCHEDULE OF RATES TO BE INCLUSIVE:The prices/rates quoted by the CONTRACTOR shallremain firm till the issue of FINAL CERTIFICATE andshall not be subject to escalation. Schedule of Ratesshall be deemed to include and cover all costs,expenses and liabilities of every description and allrisks of every kind to be taken in executing,completing and handing over the WORK to theEMPLOYER by the CONTRACTOR. TheCONTRACTOR shall be deemed to have known thenature, scope, magnitude and the extent of theWORK and materials required though theCONTRACT DOCUMENT may not fully and preciselyfurnish them. Tenderer's shall make such provision inthe Schedule of Rates as he may consider necessaryto cover the cost of such items of WORK andmaterials as may be reasonable and necessary tocomplete the WORK. The opinion of theENGINEER-IN-CHARGE as to the items of WORKwhich are necessary and reasonable forCOMPLETION OF WORK shall be final and bindingon the CONTRACTOR, although the same may notbe shown on or described specifically in CONTRACTDOCUMENTS.Generality of this present provision shall not bedeemed to cut down or limit in any way because incertain cases it may and in other cases it may not beexpressly stated that the CONTRACTOR shall do orperform a work or supply articles or perform servicesat his own cost or without addition of payment orwithout extra charge or words to the same effect orthat it may be stated or not stated that the same areincluded in and covered by the Schedule of Rates.iii) SCHEDULE OF RATES TO COVERCONSTRUCTION EQUIPMENTS, MATERIALS,LABOUR ETC.:Without in any way limiting the provisions of thepreceding sub-clause the Schedule of Rates shall bedeemed to include and cover the cost of allconstruction equipment, temporary WORK (except asprovided for herein), pumps, materials, labour,insurance, fuel, consumables, stores and appliancesto be supplied by the CONTRACTOR and all othermatters in connection with each item in the Scheduleof Rates and the execution of the WORK or anyportion thereof finished, complete in every respect andmaintained as shown or described in the CONTRACTDOCUMENTS or as may be ordered in writing duringthe continuance of the CONTRACT.iv)SCHEDULE OF RATES TO COVER ROYALTIES,RENTS AND CLAIMS:The Schedule of Rates (i.e., VALUE OF CONTRACT)shall be deemed to include and cover the cost of allroyalties and fees for the articles and processes,50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!