General Conditions of Contractii) In case of suspensions of entire WORK, ordered inwriting by ENGINEER-IN-CHARGE, for a period ofmore than two months, the CONTRACTOR shall havethe option to terminate the CONTRACT.78 Employer may do part ofwork:78.1 Upon failure of the CONTRACTOR to comply with anyinstructions given in accordance with the provisions of thisCONTRACT the EMPLOYER has the alternative right,instead of assuming charge of entire WORK, to placeadditional labour force, tools, equipments and materials onsuch parts of the WORK, as the EMPLOYER maydesignate or also engage another CONTRACTOR to carryout the WORK. In such cases, the EMPLOYER shalldeduct from the amount which otherwise might becomedue to the CONTRACTOR, the cost of such work andmaterial with ten percent (10%) added to cover alldepartmental charges and should the total amount thereofexceed the amount due to the CONTRACTOR, theCONTRACTOR shall pay the difference to theEMPLOYER.79 Possession prior tocompletion:80 Defects Liability Period(Twelve months period ofliability from the date of issueof completion certificate):79.1 The ENGINEER-IN-CHARGE shall have the right to takepossession of or use any completed or partially completedWORK or part of the WORK. Such possession or use shallnot be deemed to be an acceptance of any work completedin accordance with the CONTRACT agreement. If suchprior possession or use by the ENGINEER-IN- CHARGEdelays the progress of WORK, equitable adjustment in thetime of completion will be made and the CONTRACTagreement shall be deemed to be modified accordingly.80.1 The CONTRACTOR shall guarantee the installation/WORKfor a period of 12 months from the date of completion ofWORK as certified by the ENGINEER-IN-CHARGE whichis indicated in the Completion Certificate. Any damage ordefect that may arise or lie undiscovered at the time ofissue of Completion Certificate, connected in any way withthe equipment or materials supplied by him or in theworkmanship, shall be rectified or replaced by theCONTRACTOR at his own expense as deemed necessaryby the ENGINEER-IN-CHARGE or in default, theENGINEER- IN-CHARGE may carry out such works byother work and deduct actual cost incurred towards labour,supervision and materials consumables or otherwise plus100% towards overheads (of which the certificate ofENGINEER-IN-CHARGE shall be final) from any sums thatmay then be or at any time thereafter, become due to theCONTRACTOR or from his Contract Performance Security,or the proceeds of sale thereof or a sufficient part onthereof.80.2 If the CONTRACTOR feels that any variation in WORK orin quality of materials or proportions would be beneficial ornecessary to fulfil the guarantees called for, he shall bringthis to the notice of the ENGINEER- IN-CHARGE in writing.If during the period of liability any portion of theWORK/equipment, is found defective and is rectified/replaced, the period of liability for such equipment/ portion45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!