11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Conditions of ContractENGINEER-IN-CHARGE and cost of such tests shall bereimbursed by the EMPLOYER.75 Samples for approval: 75.1 The CONTRACTOR shall furnish to theENGINEER-IN-CHARGE for approval, when requested orif required by the specifications, adequate samples of allmaterials and finished to be used in the WORK. Suchsamples shall be submitted before the WORK iscommenced and in ample time to permit tests andexaminations thereof. All materials furnished and finishesapplied in actual WORK shall be fully equal to the approvedsamples.76 Action and compensation incase of bad work:76.1 If it shall appear to the ENGINEER-IN-CHARGE that anywork has been executed with unsound, imperfect orunskilled workmanship, or with materials of any inferiordescription, or that any materials or articles provided by theCONTRACTOR for the execution of the WORK areunsound, or of a quality inferior to that contracted for, orotherwise not in accordance with the CONTRACT, theCONTRACTOR shall on demand in writing from theENGINEER-IN-CHARGE or his authorised representativespecifying the WORK, materials or articles complained ofnotwithstanding that the same may have been inadvertentlypassed, certified and paid for, forthwith rectify or removeand reconstruct the WORK so specified and provide otherproper and suitable materials or articles at his own cost andin the event of failure to do so within the period specifiedby the ENGINEER-IN-CHARGE in his demand aforesaid,the CONTRACTOR shall be liable to pay compensation atthe rate of 1 % (One percent) of the estimated cost of thewhole WORK, for every week limited to a maximum of 10%(ten percent) of the value of the whole WORK, while hisfailure to do so shall continue and in the case of any suchfailure the ENGINEER-IN-CHARGE may on expiry ofnotice period rectify or remove and re-execute the WORKor remove and replaced with others, the materials orarticles complained of to as the case may be at the risk andexpense in all respects of the CONTRACTOR. Thedecision of the Engineering-in-charge as to any questionarising under this clause shall be final and conclusive.77 Suspension of works: 77.1 i) Subject to the provisions of sub-para (ii) of this clause,the CONTRACTOR shall, if ordered in writing by theENGINEER-IN-CHARGE, or his representative,temporarily suspend the WORKS or any part thereof forsuch written order, proceed with the WORK thereinordered to be suspended until, he shall have received awritten order to proceed therewith. TheCONTRACTOR shall not be entitled to claimcompensation for any loss or damage sustained by himby reason of temporary suspension of the WORKSaforesaid. An extension of time for completion,corresponding with the delay caused by any suchsuspension of the WORKS as aforesaid will be grantedto the ONTRACTOR should he apply for the sameprovided that the suspension was not consequent toany default or failure on the part of the CONTRACTOR.44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!