11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractefficient and timely reinstatement. The CONTRACTORshall also be responsible for the maintenance of all existingsurvey marks, boundary marks, distance marks and centerline marks, either existing or supplied and fixed by theCONTRACTOR. The work shall be set out to thesatisfaction of the ENGINEER-IN-CHARGE. The approvalthere of joining with the CONTRACTOR by theENGINEER- IN-CHARGE in setting out the work, shall notrelieve the CONTRACTOR of any of his responsibility.63.3 Before beginning the Works, the CONTRACTOR shall athis own cost, provide all necessary reference and levelposts, pegs, bamboos, flags, ranging rods, strings andother materials for proper layout of the works in accordancewith the schemes for bearing marks acceptable to theENGINEER-IN-CHARGE. The center, longitudinal or facelines and cross lines shall be marked by means of smallmasonry pillars. Each pillar shall have distinct mark at thecentre to enable theodolite to be set over it. No work shallbe started until all these points are checked and approvedby the ENGINEER-IN-CHARGE in writing but suchapproval shall not relieve the CONTRACTOR of any of hisresponsibilities. The CONTRACTOR shall also provide alllabour, material and other facilities, as necessary, for theproper checking of layout and inspection of the pointsduring construction.63.4 Pillars bearing geodetic marks located at the sites of unitsof WORKS under construction should be protected andfenced by the CONTRACTOR.63.5 On completion of WORK, the CONTRACTOR must submitthe geodetic documents according to which the WORK wascarried out.64 Responsibility for level andalignment:65 Materials to be supplied bycontractor:64.1 The CONTRACTOR shall be entirely and exclusivelyresponsible for the horizontal and vertical alignment, thelevels and correctness of every part of the WORK and shallrectify effectively any errors or imperfections therein, suchrectifications shall be carried out by the CONTRACTOR, athis own cost, when instructions are issued to that effect bythe ENGINEER- IN-CHARGE.65.1 The CONTRACTOR shall procure and provide within theVALUE OF CONTRACT the whole of the materialsrequired for the construction including steels, cement andother building materials, tools, tackles, construction plantand equipment for the completion and maintenance of theWORK except the materials which will be issued by theEMPLOYER and shall make his own arrangement forprocuring such materials and for the transport thereof. TheEMPLOYER may give necessary recommendation to therespective authority if so desired by the CONTRACTOR butassumes no further responsibility of any nature. TheEMPLOYER will insist on the procurement of materialswhich bear ISI stamp and/or which are supplied by reputedsuppliers.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!