11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractsuch notice shall terminate such Subcontract and dismissthe SUB-CONTRACTOR(S) and the later shall forthwithleave the works, failing which the EMPLOYER shall have theright to remove such SUB- CONTRACTOR(S) from the site.v) NO REMEDY <strong>FOR</strong> ACTION TAKEN UNDER THISCLAUSE:No action taken by the EMPLOYER under the clause shallrelieve the CONTRACTOR of any of his liabilities under theCONTRACT or give rise to any right or compensation,extension of time or otherwise failing which the EMPLOYERshall have the right to remove such SUB-CONTRACTOR(S)from the site.38 Power of entry: 38.1 If the CONTRACTOR shall not commence the WORK in themanner previously described in the CONTRACT documents or ifhe shall at any time in the opinion of the ENGINEER-IN-CHARGE.i) fail to carry out the WORK in conformity with theCONTRACT documents, orii)fail to carry out the WORK in accordance with the TimeSchedule, oriii) substantially suspend work or the WORK for a period offourteen days without authority from theENGINEER-IN-CHARGE, oriv) fail to carry out and execute the WORK to the satisfaction ofthe ENGINEER-IN-CHARGE, orv) fail to supply sufficient or suitable construction plant,temporary works, labour, materials or things, orvi) Commit, suffer, or permit any other breach of any of theprovisions of the CONTRACT on his part to be performed orobserved or persist in any of the above mentioned breachesof the CONTRACT for fourteen days, after notice in writingshall have been given to the CONTRACTOR by theENGINEER-IN-CHARGE requiring such breach to beremedied, orvii) if the CONTRACTOR shall abandon the WORK , orviii) If the CONTRACTOR during the continuance of theCONTRACT shall become bankrupt, make any arrangementor composition with his creditors, or permit any execution tobe levied or go into liquidation whether compulsory orvoluntary not being merely a voluntary liquidation for thepurpose of amalgamation or reconstructionthen in any such case, the EMPLOYER shall have the power toenter upon the WORK and take possession thereof and of thematerials, temporary WORK, construction plant, and stockthereon, and to revoke the CONTRACTOR's licence to use thesame, and to complete the WORK by his agents, otherCONTRACTORS or workmen or to relate the same upon anyterms and to such other person, firm or corporation as the26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!